Evaluation of the Impact of the Last Planner System on the Performance of Construction Projects
暂无分享,去创建一个
[1] G. Von. Stumbling blocks of PPC: Towards the holistic configuration of PPC systems , 2005 .
[2] C. Caldas,et al. Benchmarking Initiatives in the Construction Industry: Lessons Learned and Improvement Opportunities , 2006 .
[3] Gregory A. Howell,et al. An Update on Last Planner , 2003 .
[4] R. Thomas,et al. QUALITY MANAGEMENT TOOLS FOR LEAN PRODUCTION - MOVING FROM ENFORCEMENT TO EMPOWERMENT , 2002 .
[5] Lia Buarque de Macedo Guimarães,et al. Safety and production: an integrated planning and control model , 2004 .
[6] Glenn Ballard,et al. LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL , 1997 .
[7] Luis F. Alarcón,et al. Assessing the Impacts of Implementing Lean Construction , 2008 .
[8] Lauri Koskela,et al. Understanding construction supply chains: a multiple theoretical approach to interorganizational relationships in construction , 2003 .
[9] Gregory A. Howell,et al. SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .
[10] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[11] P. Pochet. A Quantitative Analysis , 2006 .
[12] Carlos Torres Formoso,et al. A Quantitative Analysis of Data Collected From the Last Planner System in Brazil , 2006 .