Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant

Project cost is one of the most important criteria of success of project and is of high concern to those who are involved in the construction industry. However, studies show that rarely projects are complete within stipulated budget. This study is focusing on identification of significant causes affecting construction cost in MARA large projects. This paper presents the results of a questionnaire survey conducted among the personnel of Project Management Consultant (PMC). Data was analyzed with statistical tools to determine the rank of factors affecting construction cost. It is concluded that cash flow and financial difficulties faced by contractors, contractor's poor site management and supervision, inadequate contractor experience, shortage of site workers, incorrect planning and scheduling by contractors are most severe factors while changes in scope of project and frequent design changes are least affecting factors on construction cost. Spearman correlation analysis showed that incorrect planning and scheduling by contractor has strong positive relationship with contractor’s poor site management and supervision, inadequate experience of contractors has strong positive relationship with incorrect planning and scheduling; and contractor’s poor site management and supervision, changes in scope of project has strong positive relationship with frequent design changes; and vice versa.

[1]  Yaser Abdullah Al-Juwairah Factors affecting construction costs in Saudi Arabia , 1997 .

[2]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[3]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[4]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[5]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[6]  W J Angelo,et al.  MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS , 2002 .

[7]  S Meeampol,et al.  Factors affecting cost and time performance on highway construction projects: Evidence from Thailand , 2006 .

[8]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[9]  Chotchai Charoenngam,et al.  Assessment of cost control systems: a case study of Thai construction organizations , 2001 .

[10]  Jacob Cohen Statistical Power Analysis for the Behavioral Sciences , 1969, The SAGE Encyclopedia of Research Design.

[11]  P. Lachenbruch Statistical Power Analysis for the Behavioral Sciences (2nd ed.) , 1989 .

[12]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[13]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[14]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[15]  Mohd Razaki Abdullah,et al.  Potential Effects on Large Mara Construction Projects Due To Construction Delay , 2009 .

[16]  A. Omoregie,et al.  Infrastructure delays and cost escalation: Causes and effects in Nigeria , 2006 .

[17]  Pantaleo Mutajwaa Daniel Rwelamila,et al.  Total systems intervention: an integrated approach to time, cost and quality management , 1995 .

[18]  Paul G. Hoel,et al.  Elementary statistics , 1971 .

[19]  Andrew S. Chang Reasons for cost and schedule increase for engineering design projects , 2002 .

[20]  Koleola Tunwase Odusami,et al.  Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria , 2010 .

[21]  Mm Kumaraswamy,et al.  A survey of time-cost relationships in Hong Kong construction projects , 1982 .