Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant
暂无分享,去创建一个
Ismail Abdul Rahman | Aftab Hameed Memon | Mohd Razaki Abdullah | Ade Asmi Abdu Azis | I. Rahman | A. Memon | M. Abdullah | Ade Asmi Abdu Azis
[1] Yaser Abdullah Al-Juwairah. Factors affecting construction costs in Saudi Arabia , 1997 .
[2] Long Le-Hoai,et al. Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .
[3] Mohan M. Kumaraswamy,et al. Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .
[4] Murali Sambasivan,et al. Causes and effects of delays in Malaysian construction industry , 2007 .
[5] N. Kartam,et al. Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .
[6] W J Angelo,et al. MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS , 2002 .
[7] S Meeampol,et al. Factors affecting cost and time performance on highway construction projects: Evidence from Thailand , 2006 .
[8] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[9] Chotchai Charoenngam,et al. Assessment of cost control systems: a case study of Thai construction organizations , 2001 .
[10] Jacob Cohen. Statistical Power Analysis for the Behavioral Sciences , 1969, The SAGE Encyclopedia of Research Design.
[11] P. Lachenbruch. Statistical Power Analysis for the Behavioral Sciences (2nd ed.) , 1989 .
[12] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[13] Stephen O. Ogunlana,et al. Large construction projects in developing countries: a case study from Vietnam , 2004 .
[14] Gary David Holt,et al. Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .
[15] Mohd Razaki Abdullah,et al. Potential Effects on Large Mara Construction Projects Due To Construction Delay , 2009 .
[16] A. Omoregie,et al. Infrastructure delays and cost escalation: Causes and effects in Nigeria , 2006 .
[17] Pantaleo Mutajwaa Daniel Rwelamila,et al. Total systems intervention: an integrated approach to time, cost and quality management , 1995 .
[18] Paul G. Hoel,et al. Elementary statistics , 1971 .
[19] Andrew S. Chang. Reasons for cost and schedule increase for engineering design projects , 2002 .
[20] Koleola Tunwase Odusami,et al. Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria , 2010 .
[21] Mm Kumaraswamy,et al. A survey of time-cost relationships in Hong Kong construction projects , 1982 .