Subsea controls future proofing: A systems strategy embracing obsolescence management

The increasing world energy demands for enhanced oil and gas recovery in the offshore industry has led to new subsea technology developments with increased system functionality. Technologies such as subsea processing and instrumentations for subsea control data acquisition place a greater demand on bandwidth, power and capacity. Therefore, the legacy controls system becomes obsolete and proves unsustainable in supporting the increased functionality placed on it by the new subsea technologies. With the fast evolution of electronics, the replacement of the core components of the control system when they fail becomes difficult as they are no longer being produced or supported by the original component manufacturers (OCM). The present paper explores the different strategies in addressing obsolescence on the subsea controls system for offshore field developments.

[1]  Pameet Singh,et al.  Determining Optimum Redesign Plans for Avionics Based on Electronic Part Obsolescence Forecasts , 2002 .

[2]  R. Neri,et al.  Subsea Architectures To Facilitate Increased Recovery from Reservoirs: Subsea Processing, Condition Monitoring and Process Optimisation in a Modern Subsea Control System , 2006 .

[3]  J W Jones,et al.  SUBSEA PRODUCTION SYSTEMS - TRENDS IN THE NINETIES , 1995 .

[4]  P. Turner,et al.  Reliability of Subsea Control Systems: HIPPS a case Study , 2002 .

[5]  Peter Sandborn Designing for Technology Obsolescence Management , 2007 .

[6]  Pameet Singh,et al.  Obsolescence Driven Design Refresh Planning for Sustainment-Dominated Systems , 2006 .

[7]  Marco Buratti,et al.  The Obsolescence Management Based on a Pro-Active Approach in Conjunction with a Pre-Planned Technology Insertion Route , 2000 .

[8]  R. Fantoft,et al.  Status and New Developments in Subsea Processing , 2006 .

[9]  Jha Baker Integrating reliability, obsolescence and integrity management into life cycle management of subsea facilities , 2011 .

[10]  Peter Sandborn,et al.  Integrating Technology Obsolescence Considerations Into Product Design Planning , 2007 .

[11]  Michael Pecht,et al.  Electronic part life cycle concepts and obsolescence forecasting , 2000 .

[12]  Alasdair MacLeod,et al.  Control and Safety System (ESD, F&G and PCS) Obsolescence, a Practical Solution for System Migration Taking Account of Aging Facilities While Maintaining Safety Standards , 2009 .

[13]  Allan Seabridge,et al.  Managing Obsolescence in the Aircraft Life cycle , 2012 .

[14]  Christina D. Ward,et al.  Electronic component obsolescence , 2011, IEEE Instrumentation & Measurement Magazine.

[15]  Steinar Midttveit,et al.  SS on Implications of Subsea Processing power Distribution - Subsea Power Systems - a Key Enabler for Subsea Processing , 2010 .

[16]  Paul A. Broadbent Controls Reliability And Early Life of Field Failure of Subsea Control Modules , 2010 .

[17]  Remi Eriksen,et al.  Subsea Processing - The Solution to Cost Efficient Deepwater Field Developments , 2000 .

[18]  Francisco Javier,et al.  Development of a framework for obsolescence resolution cost estimation , 2011 .

[19]  Janis Terpenny,et al.  Component Obsolescence Risk Assessment , 2009 .

[20]  Daniel Abicht,et al.  The 2nd Generation DC All-Electric Subsea Production Control System , 2011 .

[21]  Fuat Kara,et al.  Subsea Processing: A Holistic Approach to Marginal Field Developments , 2012 .

[22]  Walter Tomczykowski DMSMS Acquisition Guidelines: Implementing Parts Obsolescence Management Contractual Requirements , 2007 .

[23]  Peter Sandborn,et al.  Editorial Software Obsolescence—Complicating the Part and Technology Obsolescence Management Problem , 2007 .

[24]  Michael Pecht,et al.  Electronic Components Obsolescence , 1997 .

[25]  D. Saul The Need To Adopt a Proactive Approach to Obsolescence Management in Subsea Controls , 2006 .

[26]  Alan Beedle,et al.  Current Trends and Design Limitations of Subsea Control Hardware , 2010 .

[27]  Michael Pecht,et al.  Strategies to the Prediction, Mitigation and Management of Product Obsolescence: Bartels/Prediction , 2012 .

[28]  Ian Kent,et al.  Control System Upgrades for Tordis and Vigdis Field - A Project Case Study of Revitalising Brownfield Developments with Next Generation Subsea Controls , 2011 .

[29]  Stuart Holley New subsea electronic module offers enhanced communications , 2010 .

[30]  Walter J. TomczykowskiARINCAnnapolis A Study on Component Obsolescence Mitigation Strategies and Their Impact on R&M , 2003 .