REVIEW OF HIGH POWER CW COUPLERS FOR SUPERCONDUCTING CAVITIES

A number of high power fundamental input couplers for superconducting cavities operating in CW mode have been developed in recent years around the world. Some couplers have already been in service for many years delivering hundreds of kilowatts of RF power to beams. In this paper we will summarize experience accumulated in different laboratories and review design options and technical issues associated with R&D, testing and operation of the CW high power couplers. Several future projects will be discussed to highlight new requirements and design challenges.

[1]  Maury Tigner,et al.  Phase I Energy Recovery Linac at Cornell University , 2002 .

[2]  Hasan Padamsee,et al.  LATEST RESULTS FROM THE PRODUCTION OF 500 MHZ SRF MODULES FOR LIGHT SOURCES AND CESR UPGRADE , 2001 .

[3]  B. Rusnak,et al.  High-Power Testing of the APT Power Coupler , 2000 .

[4]  Y. Kijima,et al.  INPUT COUPLER OF SUPERCONDUCTING CAVITY FOR KEKB , 2000 .

[5]  H P Kindermann,et al.  THE VARIABLE POWER COUPLER FOR THE LHC SUPERCONDUCTING CAVITY , 1999 .

[6]  Guillaume Devanz,et al.  Preliminary Design of a 704 MHz Power Coupler for a High Intensity Proton Linear Accelerator , 2000 .

[7]  J. Welch,et al.  Beam test of a superconducting cavity for the CESR luminosity upgrade , 1995, Proceedings Particle Accelerator Conference.

[8]  Isidoro E. Campisi STATE OF THE ART POWER COUPLERS FOR SUPERCONDUCTING RF CAVITIES , 2002 .

[9]  S. Belomestnykh,et al.  PERFORMANCE OF THE CESR SUPERCONDUCTING RF SYSTEM AND FUTURE PLANS , 2001 .

[10]  S. Belomestnykh,et al.  Experimental studies of electron multipacting in CESR type rectangular waveguide couplers. , 2002 .

[11]  S. Mitsunobu,et al.  High Power Input Coupler for KEKB SC Cavity , 1999 .

[12]  Isidoro E. Campisi Fundamental Power Couplers for Superconducting Cavities , 2001 .

[13]  M. Stirbet,et al.  Status of RF power couplers for superconducting cavities at CERN , 1996 .

[14]  W.-D. Moeller HIGH POWER COUPLER FOR THE TESLA TEST FACILITY , 2000 .

[15]  Hasan Padamsee,et al.  High power window tests on a 500 MHz planar waveguide window for the CESR upgrade , 1995, Proceedings Particle Accelerator Conference.

[16]  M. Stirbet RF power tests of LEP2 main couplers on a single cell superconducting cavity , 1997 .

[17]  J. Preble,et al.  Development of a 50 kw cw L-band rectangular window for Jefferson Lab FEL cryomodule , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).

[18]  Hasan Padamsee,et al.  Test results and design considerations for a 500 MHz, 500 kWatt vacuum window for CESR-B , 1993, Proceedings of International Conference on Particle Accelerators.

[19]  Hasan Padamsee,et al.  TESTS AND DESIGNS OF HIGH-POWER WAVEGUIDE VACUUM WINDOWS AT CORNELL , 1997 .

[20]  Frank L. Krawczyk,et al.  DESIGN OF THE SPOKE CAVITY ED&D INPUT COUPLER* , 2001 .

[21]  J. Waynert,et al.  Results of the APT RF power coupler development for superconducting linacs , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).

[22]  S. Belomestnykh,et al.  RF POWER COUPLER PERFORMANCE AT CESR AND STUDY OF A MULTIPACTOR INHIBITED COUPLER , 1999 .