Quality control of post-tensioned method prestressed T beam

With the example of engineering as background,it discusses raw material selection,template production and installation,banding and installation of reinforced steel rebar and corrugated pipe,concrete pouring,tensioning,grouting and other quality control procedures,and successfully solves some problems,such as too large inverted value of T beam,which affect the deck pavement.