Design Rework Prediction in Concurrent Design Environment: Current Trends and Future Research Directions

This paper aims to present state-of-the-art and formulate future research areas on design rework in concurrent design environment. Related literatures are analysed to extract the key factors which impact design rework. Design rework occurs due to changes from upstream design activities and/or by feedbacks from downstream design activities. Design rework is considered as negative iteration; therefore, value in design activities will be increased if design rework is reduced. Set-based concurrent engineering is proposed as an alternative design approach to mitigate design rework risk, however, duplication effort for designing set of artefacts are still needed to consider before selecting set-based concurrent engineering in design activities.

[1]  R. M. Eastman Engineering information release prior to final design freeze , 1980, IEEE Transactions on Engineering Management.

[2]  D. R. Friedrich,et al.  Revisions, repairs, and rework on large projects , 1987 .

[3]  Durward K. Sobek,et al.  The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .

[4]  Robert P. Smith,et al.  A predictive model of sequential iteration in engineering design , 1997 .

[5]  Steven D. Eppinger,et al.  A Model-Based Framework to Overlap Product Development Activities , 1997 .

[6]  Christoph H. Loch,et al.  Communication and Uncertainty in Concurrent Engineering , 1998 .

[7]  Tyson R. Browning,et al.  Use of Dependency Structure Matrices for Product Development Cycle Time Reduction , 1998 .

[8]  Durward K. Sobek,et al.  Toyota's Principles of Set-Based Concurrent Engineering , 1999 .

[9]  Peter B. Luh,et al.  Scheduling of design projects with uncertain number of iterations , 1999, Eur. J. Oper. Res..

[10]  Ali A. Yassine,et al.  A decision analytic framework for evaluating concurrent engineering , 1999 .

[11]  Luk N. Van Wassenhove,et al.  Limits to Concurrency , 1999 .

[12]  Glenn Ballard,et al.  Positive Vs. Negative Iteration in Design , 2000 .

[13]  T. Saaty Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process , 2000 .

[14]  Amiya K. Chakravarty,et al.  Overlapping design and build cycles in product development , 2001, Eur. J. Oper. Res..

[15]  Cheng Wu,et al.  Scheduling approach for concurrent product development processes , 2001, Comput. Ind..

[16]  Tyson R. Browning,et al.  Applying the design structure matrix to system decomposition and integration problems: a review and new directions , 2001, IEEE Trans. Engineering Management.

[17]  Mark A. Vonderembse,et al.  Concurrent engineering and its consequences , 2001 .

[18]  Steven D. Eppinger,et al.  PRODUCT DEVELOPMENT PROCESS MODELING USING ADVANCED SIMULATION , 2001 .

[19]  Steven D. Eppinger,et al.  Performance of Coupled Product Development Activities with a Deadline , 2001, Manag. Sci..

[20]  Zheng Wang,et al.  A Quantitative Approach to the Process Modeling and Planning in Concurrent Engineering , 2002, Concurr. Eng. Res. Appl..

[21]  Christoph H. Loch,et al.  Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..

[22]  Tyson R. Browning,et al.  Modeling impacts of process architecture on cost and schedule risk in product development , 2002, IEEE Trans. Engineering Management.

[23]  Peter E.D. Love,et al.  Auditing the indirect consequences of rework in construction: a case based approach , 2002 .

[24]  Renbin Xiao,et al.  Research on the process model of product development with uncertainty based on activity overlapping , 2003 .

[25]  Durward K. Sobek,et al.  Iteration in Engineering Design: Inherent and Unavoidable or Product of Choices Made? , 2003 .

[26]  Reza H. Ahmadi,et al.  Concurrent Crashing and Overlapping in Product Development , 2004, Oper. Res..

[27]  Hong-Bae Jun,et al.  On identifying and estimating the cycle time of product development process , 2005, IEEE Trans. Engineering Management.

[28]  Keith R. Molenaar,et al.  Strategies for overlapping dependent design activities , 2006 .

[29]  Victoria L. Mitchell,et al.  Cooperative Planning, Uncertainty, and Managerial Control in Concurrent Design , 2007, Manag. Sci..

[30]  Jian Zhu,et al.  Managing the exchange of information in product development , 2008, Eur. J. Oper. Res..