A MILP model and heuristic approach for facility location under multiple operational constraints
暂无分享,去创建一个
[1] Stefan Nickel,et al. A tabu search heuristic for redesigning a multi-echelon supply chain network over a planning horizon , 2012 .
[2] Caroline Prodhon,et al. A hybrid evolutionary algorithm for the periodic location-routing problem , 2011, Eur. J. Oper. Res..
[3] Der-Horng Lee,et al. Dynamic network design for reverse logistics operations under uncertainty , 2009 .
[4] Francisco Saldanha-da-Gama,et al. An LP-rounding heuristic to solve a multi-period facility relocation problem , 2009 .
[5] M. J. Rosenblatt,et al. A Mathematical Programming Model for Global Supply Chain Management: Conceptual Approach and Managerial Insights , 2002 .
[6] Kchaou BoujelbenMouna,et al. A MILP model and heuristic approach for facility location under multiple operational constraints , 2016 .
[7] Cem Canel,et al. International facilities location: A heuristic procedure for the dynamic uncapacitated problem , 2001 .
[8] Stefan Nickel,et al. Multi-Period Facility Location , 2015 .
[9] M. T. Melo,et al. An efficient heuristic approach for a multi-period logistics network redesign problem , 2014 .
[10] Hokey Min,et al. The dynamic relocation and phase-out of a hybrid, two-echelon plant/warehousing facility: A multiple objective approach , 2000, Eur. J. Oper. Res..
[11] I. Moon,et al. An Analysis of Network Location Problems with Distance Constraints , 1984 .
[12] Reza Zanjirani Farahani,et al. Facility location dynamics: An overview of classifications and applications , 2012, Comput. Ind. Eng..
[13] Maria Grazia Scutellà,et al. Distribution network design: New problems and related models , 2005, Eur. J. Oper. Res..
[14] Vedat Verter,et al. Multi-period reverse logistics network design , 2012, Eur. J. Oper. Res..
[15] Mikael Rönnqvist,et al. Supply chain modelling of forest fuel , 2004, Eur. J. Oper. Res..
[16] Robert Beauregard,et al. Designing logistics networks in divergent process industries: A methodology and its application to the lumber industry , 2006 .
[17] Mouna Kchaou. Modeling and solving a distribution network design problem with multiple operational constraints : Application to a case-study in the automotive industry , 2013 .
[18] Ching-Jung Ting,et al. A simulated annealing heuristic for the capacitated location routing problem , 2010, Comput. Ind. Eng..
[19] Hesham K. Alfares,et al. Modeling health care facility location for moving population groups , 2008, Comput. Oper. Res..
[20] Mark S. Daskin,et al. Strategic facility location: A review , 1998, Eur. J. Oper. Res..
[21] Nathalie Bostel,et al. A linear relaxation-based heuristic approach for logistics network design , 2010, Comput. Ind. Eng..
[22] Bernard Gautier. Le marché automobile: un cycle spécifique ? , 1995 .
[23] Tae-Eog Lee,et al. A three-level supply chain network design model with risk-pooling and lead times , 2010 .
[24] E. Aghezzaf,et al. Capacity planning and warehouse location in supply chains with uncertain demands , 2005, J. Oper. Res. Soc..
[25] Linet Özdamar,et al. A dynamic logistics coordination model for evacuation and support in disaster response activities , 2007, Eur. J. Oper. Res..
[26] Francisco Saldanha-da-Gama,et al. Comparing classical performance measures for a multi-period, two-echelon supply chain network design problem with sizing decisions , 2013, Comput. Ind. Eng..
[27] Paula Camelia Trandafir,et al. Some heuristic methods for solving p-median problems with a coverage constraint , 2012, Eur. J. Oper. Res..
[28] M. Goetschalckx,et al. A primal decomposition method for the integrated design of multi-period production–distribution systems , 1999 .
[29] Pierre Dejax,et al. Dynamic Location-routeing Problems , 1989 .
[30] Michel Minoux,et al. A distribution network design problem in the automotive industry: MIP formulation and heuristics , 2014, Comput. Oper. Res..
[31] Mouna Kchaou-Boujelben. Modeling and solving a distribution network design problem with multiple operational constraints. Application to a case-study in the automotive industry. , 2013 .
[32] Pierre Dejax,et al. DYNAMIC LOCATION-ROUTING PROBLEMS , 1988 .
[33] Ali Haghani,et al. Modeling integrated supply chain logistics in real-time large-scale disaster relief operations , 2012 .
[34] Stefan Nickel,et al. A multi-stage stochastic supply network design problem with financial decisions and risk management , 2012 .
[35] José Pinto Paixão,et al. Using clustering analysis in a capacitated location-routing problem , 2007, Eur. J. Oper. Res..
[36] Stefan Nickel,et al. Multiperiod Location-Routing with Decoupled Time Scales , 2012, Eur. J. Oper. Res..
[37] Francisco Saldanha-da-Gama,et al. Facility location and supply chain management - A review , 2009, Eur. J. Oper. Res..
[38] Francisco Saldanha-da-Gama,et al. Dynamic multi-commodity capacitated facility location: a mathematical modeling framework for strategic supply chain planning , 2006, Comput. Oper. Res..
[39] Bernhard Fleischmann,et al. Strategic Planning of BMW's Global Production Network , 2006, Interfaces.