Progress report on the construction of the Northeast Proton Therapy Center (NPTC) equipment

The IBA proton therapy system selected by the Massachusetts General Hospital (MGH) to equip its new NPTC is presently under construction and test. This paper presents a progress report on the equipment construction. The cyclotron, as well as the rest of the equipment, are being progressively installed in the NPTC building. The acceptance tests of the whole system are foreseen for the end of 1997.