Warranty and Maintenance

Businesses use equipment to deliver their outputs (products and/or services) and individuals use consumer products to satisfy their personal needs and provide entertainment. Both types of item are getting more complex due to rapid advances in technology and to the increasing expectations of customers (businesses and individuals). These customers need to be assured that the items will perform satisfactorily over their useful lives and one way of providing this assurance is through a product warranty. Most countries have either enacted or are in the process of enacting stricter warranty legislation to protect customers’ interests. Manufacturers are required to rectify all failures that occur over the warranty period and this is referred to as warranty servicing. Warranty servicing results in additional costs to the manufacturer and it has been reported in the literature that these costs can vary between 2% and 10% of an item’s sale price depending on the product and manufacturer.

[1]  Thomas A. Mazzuchi,et al.  A Bayesian perspective on some replacement strategies , 1996 .

[2]  Ludo Gelders,et al.  Maintenance management decision making , 1992 .

[3]  Christophe Bérenguer,et al.  Periodic imperfect preventive maintenance with two categories of competing failure modes , 2006, Reliab. Eng. Syst. Saf..

[4]  D. N. P. Murthy,et al.  Optimal replace-repair strategy for servicing products sold with warranty , 1989 .

[5]  Jianer Chen,et al.  A Polynomial Time Approximation Scheme for General Multiprocessor Job Scheduling , 2001, SIAM J. Comput..

[6]  Stefanka Chukova,et al.  Warranty analysis (review) , 1993 .

[7]  Xiaoyue Jiang,et al.  On a conjecture of optimal repair-replacement strategies for warranted products , 2006, Math. Comput. Model..

[8]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[9]  George Papageorgiou,et al.  The Complexity of the Travelling Repairman Problem , 1986, RAIRO Theor. Informatics Appl..

[10]  Che Soong Kim,et al.  WARRANTY AND PREVENTIVE MAINTENANCE , 2001 .

[11]  D. N. P. Murthy,et al.  A servicing strategy for items sold under warranty , 2001, J. Oper. Res. Soc..

[12]  J. S. Dagpunar,et al.  Preventative maintenance strategy for equipment under warranty , 1994 .

[13]  Saligrama R. Agnihothri A Mean Value Analysis of the Travelling Repairman Problem , 1988 .

[14]  James H. Bookbinder,et al.  An integrated inventory-transportation system with modified periodic policy for multiple products , 1999, Eur. J. Oper. Res..

[15]  William P. Pierskalla,et al.  A survey of maintenance models: The control and surveillance of deteriorating systems , 1976 .

[16]  Vineet Padmanabhan,et al.  USAGE HETEROGENEITY AND EXTENDED WARRANTIES , 1995 .

[17]  John A. Buzacott,et al.  Equipment reliability and maintenance , 1985 .

[18]  W. R. Blischke,et al.  Invited Review: Mathematical models for analysis of warranty policies , 1990 .

[19]  D. N. P. Murthy,et al.  A stochastic model for service contract , 1998 .

[20]  Philip T. Evers,et al.  Heuristics for assessing emergency transshipments , 2001, Eur. J. Oper. Res..

[21]  J. McCall Maintenance Policies for Stochastically Failing Equipment: A Survey , 1965 .

[22]  I. Sahin,et al.  Quality, warranty, and preventive maintenance , 1998 .

[23]  D. N. Prabhakar Murthy,et al.  A new repair-replace strategy for items sold with a two-dimensional warranty , 2005, Comput. Oper. Res..

[24]  Rommert Dekker,et al.  Applications of maintenance optimization models : a review and analysis , 1996 .

[25]  Philip A. Scarf,et al.  On the application of mathematical models in maintenance , 1997 .

[26]  G. Monahan State of the Art—A Survey of Partially Observable Markov Decision Processes: Theory, Models, and Algorithms , 1982 .

[27]  D. N. P. Murthy,et al.  An optimal repair cost limit policy for servicing warranty , 1988 .

[28]  Pierre Borne,et al.  A controlled genetic algorithm by fuzzy logic and belief functions for job-shop scheduling , 2000, IEEE Trans. Syst. Man Cybern. Part B.

[29]  Nat Jack,et al.  Optimal repair-replace strategies for a warranted product , 2000 .

[30]  Stefanka Chukova,et al.  Warranty analysis: An approach to modeling imperfect repairs , 2004 .

[31]  D. N. P. Murthy,et al.  Product warranty management -- I: A taxonomy for warranty policies , 1992 .

[32]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[33]  D. Murthy A note on minimal repair , 1991 .

[34]  Shey-Huei Sheu,et al.  Optimum policies for a system with general imperfect maintenance , 2006, Reliab. Eng. Syst. Saf..

[35]  Richard J. Wilson,et al.  Two-Dimensional Failure Modeling , 2006 .

[36]  R. J. Tersine Principles of inventory and materials management , 1982 .

[37]  Laurent Doyen,et al.  Classes of imperfect repair models based on reduction of failure intensity or virtual age , 2004, Reliab. Eng. Syst. Saf..

[38]  D. N. Prabhakar Murthy,et al.  Optimal decision making in a maintenance service operation , 1999, Eur. J. Oper. Res..

[39]  Y. S. Sherif,et al.  Optimal maintenance models for systems subject to failure–A Review , 1981 .

[40]  D. N. Prabhakar Murthy,et al.  Warranty and discrete preventive maintenance , 2004, Reliab. Eng. Syst. Saf..

[41]  D. N. P. Murthy,et al.  Product Warranty Handbook , 1995 .

[42]  Y. H. Chun,et al.  Optimal number of periodic preventive maintenance operations under warranty , 1992 .

[43]  Peter H. Ritchken,et al.  Optimal Replacement Policies for Irreparable Warrantied Items , 1986, IEEE Transactions on Reliability.

[44]  Khairy A.H. Kobbacy,et al.  Preventive maintenance modelling , 1996 .

[45]  Richard M. Feldman,et al.  A survey of preventive maintenance models for stochastically deteriorating single-unit systems , 1989 .

[46]  Alyson G. Wilson,et al.  Repairable System Reliability , 2008 .

[47]  Young Ho Chun,et al.  Optimal replacement policy for a warrantied system with imperfect preventive maintenance operations , 1992 .

[48]  Jaime H. Ortega,et al.  Optimal replacement and overhaul decisions with imperfect maintenance and warranty contracts , 2006, Reliab. Eng. Syst. Saf..

[49]  Ilya Gertsbakh,et al.  Parallel time scales and two-dimensional manufacturer and individual customer warranties , 1998 .

[50]  N. Jawahar,et al.  A multiobjective genetic algorithm for job shop scheduling , 2001 .

[51]  Vineet Padmanabhan,et al.  Warranty Policy and Extended Service Contracts: Theory and an Application to Automobiles , 1993 .

[52]  D. N. P. Murthy,et al.  Cost Sharing Warranty Policies for Second‐hand Products , 2001 .

[53]  D. N. P. Murthy,et al.  An Optimal Policy for Servicing Warranty , 1986 .

[54]  D. N. P. Murthy,et al.  Warranty cost analysis for second-hand products , 2000 .

[55]  Rommert Dekker,et al.  A review of multi-component maintenance models with economic dependence , 1997, Math. Methods Oper. Res..

[56]  D. N. P. Murthy,et al.  A new preventive maintenance strategy for items sold under warranty , 2002 .

[57]  K. Eisenhardt Agency Theory: An Assessment and Review , 1989 .

[58]  Dong Ho Park,et al.  Optimal maintenance policies during the post-warranty period for second-hand item , 2003, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.

[59]  J Lawless,et al.  Methods for the estimation of failure distributions and rates from automobile warranty data , 1995, Lifetime data analysis.

[60]  Moshe Shaked,et al.  IMPERFECT REPAIR MODELS WITH PREVENTIVE MAINTENANCE , 2003 .

[61]  Yy Tang,et al.  A Log-normal δ-Shock maintenance model for a deteriorating system , 2006 .

[62]  Mahmut Parlar,et al.  A survey of maintenance models for multi-unit systems , 1991 .

[63]  Rommert Dekker,et al.  On the impact of optimisation models in maintenance decision making: the state of the art , 1998 .

[64]  D. G Nguyen Studies in warranty policies and product reliability , 1985 .

[65]  D. N. P. Murthy,et al.  Product warranty management. II : An integrated framework for study , 1992 .

[66]  Amit Monga,et al.  Optimal system design considering maintenance and warranty , 1998, Comput. Oper. Res..

[67]  C. W. Gits Design of maintenance concepts , 1992 .

[68]  L. C. Thomas,et al.  A survey of maintenance and replacement models for maintainability and reliability of multi-item systems , 1986 .

[69]  D. N. P. Murthy,et al.  Warranty cost analysis for second-hand products sold with cost sharing policies , 1999 .

[70]  D. N. P. Murthy,et al.  Warranty servicing with imperfect repair , 2008 .

[71]  Bermawi P. Iskandar,et al.  Repair-replace strategies for two-dimensional warranty policies , 2003 .

[72]  I. Sahin,et al.  Maintenance strategies following the expiration of warranty , 1996, IEEE Trans. Reliab..

[73]  Marlin U. Thomas,et al.  Warranty Economic Decision Models: A Summary and Some Suggested Directions for Future Research , 1999, Oper. Res..

[74]  W. Nelson Statistical Methods for Reliability Data , 1998 .

[75]  J. S. Dagpunar,et al.  An optimal imperfect maintenance policy over a warranty period , 1994 .

[76]  D. Murthy,et al.  New product warranty: A literature review , 2002 .

[77]  Hongzhou Wang,et al.  A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..

[78]  Candace Arai Yano,et al.  Optimizing Transportation Contracts to Support Just-In-Time Deliveries: The Case of One Contracted Truck Per Shipment , 1992 .

[79]  Masashi Kowada,et al.  Analysis of a system with minimal repair and its application to replacement policy , 1983 .

[80]  Boyan N. Dimitrov,et al.  Warranty Analysis for Complex Systems , 1996 .

[81]  S. G. Deshmukh,et al.  Integrated procurement-production systems: A review , 1992 .

[82]  D. N. P. Murthy,et al.  Product warranty management — III: A review of mathematical models , 1992 .

[83]  Jayprakash G. Patankar,et al.  Market share and warranty costs for renewable warranty programs , 1997 .

[84]  George E. Monahan,et al.  A Survey of Partially Observable Markov Decision Processes: Theory, Models, and Algorithms , 2007 .

[85]  Yeu-Shiang Huang,et al.  Estimation of future breakdowns to determine optimal warranty policies for products with deterioration , 2004, Reliab. Eng. Syst. Saf..

[86]  James R. Brennan,et al.  Warranties: Planning, Analysis, and Implementation , 1994 .

[87]  Hakan Polatoglu,et al.  MANUFACTURING QUALITY, RELIABILITY AND PREVENTIVE MAINTENANCE , 2009 .

[88]  Yeh Lam,et al.  A δ-shock maintenance model for a deteriorating system , 2006, Eur. J. Oper. Res..

[89]  A. Ackere The principal/agent paradigm: Its relevance to various functional fields , 1993 .