A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand
暂无分享,去创建一个
Eugene Levner | Ilya Levner | Yael Perlman | I. Levner | T. Cheng | E. Levner | Yael Perlman | T.C.E. Cheng | Y. Perlman
[1] Xiao Liu,et al. A model and algorithm for out-sourcing planning , 2005, IEEE International Conference on e-Business Engineering (ICEBE'05).
[2] Ivo J. B. F. Adan,et al. Reducing Costs of Spare Parts Supply Systems via Static Priorities , 2009, Asia Pac. J. Oper. Res..
[3] George Liberopoulos,et al. Backorder penalty cost coefficient “b”: What could it be? , 2010 .
[4] J. Zhang,et al. A Capacitated Production Planning with Outsourcing: A General Model and Its Algorithm , 2006, ICIC.
[5] Yael Perlman,et al. Centralized decision of internal transfer-prices with congestion externalities for two modes of repair with limited repair capacity , 2007, J. Oper. Res. Soc..
[6] A. Federgruen. Chapter 3 Centralized planning models for multi-echelon inventory systems under uncertainty , 1993, Logistics of Production and Inventory.
[7] Janne Huiskonen,et al. Maintenance spare parts logistics: Special characteristics and strategic choices , 2001 .
[8] Gary D. Scudder,et al. Priority Scheduling Rules for Repairable Inventory Systems , 1982 .
[9] Dorit S. Hochbaum,et al. Technical Note - Solving Linear Cost Dynamic Lot-Sizing Problems in O(n log n) Time , 2008, Oper. Res..
[10] Awi Federgruen,et al. Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems , 2007, Oper. Res..
[11] Ivo Adan,et al. A trade off between emergency repair and inventory investment , 1998 .
[12] W. Prager. On the Caterer Problem , 1956 .
[13] S. Gass,et al. Linear Programming: Methods and Applications. , 1960 .
[14] Michael C. Fu,et al. Models for multi-echelon repairable item inventory systems with limited repair capacity , 1997 .
[15] S. Minner. Multiple-supplier inventory models in supply chain management: A review , 2003 .
[16] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[17] Yael Perlman,et al. Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity , 2001, J. Oper. Res. Soc..
[18] Harvey M. Wagner,et al. Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..
[19] Beatriz Abdul-Jalbar,et al. Single cycle policies for the one-warehouse N-retailer inventory/distribution system , 2006 .
[20] Sven Axsäter,et al. Modelling Emergency Lateral Transshipments in Inventory Systems , 1990 .
[21] Graham K. Rand,et al. Logistics of Production and Inventory , 1995 .
[22] M. Klein. A Primal Method for Minimal Cost Flows with Applications to the Assignment and Transportation Problems , 1966 .
[23] What could it be , 2003 .
[24] Ilya Levner,et al. Modeling Multi-Echelon Multi-Supplier Repairable Inventory Systems with Backorders , 2010 .
[25] A. van Harten,et al. Using repair priorities to reduce stock investment in spare part networks , 2005, Eur. J. Oper. Res..
[26] W. J. Kennedy,et al. An overview of recent literature on spare parts inventories , 2002 .
[27] D. R. Fulkerson,et al. Flows in Networks. , 1964 .
[28] Jian Yang,et al. Economic Lot-Sizing with Remanufacturing Options , 2001 .
[29] Andrei Sleptchenko,et al. Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems , 2002 .
[30] David F. Pyke. Priority repair and dispatch policies for reparable-item logistics systems , 1990 .