Planning and scheduling a fleet of rigs using simulation-optimization

[1]  J. S. Aronofsky,et al.  Linear Programming A Problem-Solving Tool for Petroleum Industry Management , 1962 .

[2]  W. A. Greaney,et al.  A Stochastic Inventory Model for Scheduling Development Drilling , 1971 .

[3]  J. J. Brennan,et al.  Scheduling a Backlog of Oilwell Workovers , 1977 .

[4]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[5]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[6]  Samuel J. Raff,et al.  Routing and scheduling of vehicles and crews : The state of the art , 1983, Comput. Oper. Res..

[7]  Mauricio G. C. Resende,et al.  Greedy Randomized Adaptive Search Procedures , 1995, J. Glob. Optim..

[8]  Ken Eagle,et al.  Using Simulated Annealing to Schedule Oil Field Drilling Rigs , 1996 .

[9]  Pierre Hansen,et al.  Variable Neighborhood Search , 2018, Handbook of Heuristics.

[10]  R. Paiva,et al.  Otimização do itinerario de sondas de intervenção , 1997 .

[11]  T. Kieu,et al.  Evolutionary algorithms applied to Landau-gauge fixing , 1998, hep-lat/9809143.

[12]  R. O. Paiva,et al.  Optimizing the Itinerary of Workover Rigs , 2000 .

[13]  Averill M. Law,et al.  Simulation-based optimization , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[14]  Pierre Hansen,et al.  Variable Neighbourhood Search , 2003 .

[15]  M. Bloch,et al.  Risk Analysis For Optimizing Oil Well Drilling And Completion Schedules , 2003 .

[16]  Fred Glover,et al.  Advanced Optimization Methodology in the Oil and Gas Industry: The Theory of Scatter Search Techniques with Simple Examples , 2003 .

[17]  Ali A. Garrouch,et al.  An integrated approach for the planning and completion of horizontal and multilateral wells , 2004 .

[18]  Ricardo M. S. Accioly,et al.  Modeling dependence with copulas: a useful tool for field development decision process , 2004 .

[19]  P. S. Rovina,et al.  Drilling And Completion - How To Accomplish Capex And Schedule Managing Up To Sixrigs, Simultaneously , 2005 .

[20]  Ali A. Garrouch,et al.  A web-based expert system for the planning and completion of multilateral wells , 2005 .

[21]  Michael C. Fu,et al.  Chapter 19 Gradient Estimation , 2006, Simulation.

[22]  Russell R. Barton,et al.  Chapter 18 Metamodel-Based Simulation Optimization , 2006, Simulation.

[23]  Thivanka Suresh Dedigama,et al.  Drilling and Petroleum Engineering Program and Project Management at Santos Ltd , 2006 .

[24]  Sigrún Andradóttir,et al.  Chapter 20 An Overview of Simulation Optimization via Random Search , 2006, Simulation.

[25]  Barry L. Nelson,et al.  Chapter 17 Selecting the Best System , 2006, Simulation.

[26]  Sigurdur Olafsson,et al.  Chapter 21 Metaheuristics , 2006, Simulation.

[27]  Celso C. Ribeiro,et al.  Scheduling workover rigs for onshore oil production , 2006, Discret. Appl. Math..

[28]  Morten Irgens,et al.  Use of Advanced Optimization Techniques to Manage a Complex Drilling Schedule , 2007 .

[29]  Leyuan Shi,et al.  Some topics for simulation optimization , 2008, 2008 Winter Simulation Conference.

[30]  Leyuan Shi,et al.  Integrated dynamic and simulation model on coupled closed-loop workstation capacity controls in a multi-workstation production system , 2008, 2008 Winter Simulation Conference.

[31]  Vineet Lasrado Workover Rig Scheduling Using Reservoir Simulation , 2008 .

[32]  Mauricio G. C. Resende,et al.  Greedy Randomized Adaptive Search Procedures , 1995, J. Glob. Optim..

[33]  Jonathan David Sprague,et al.  Atlantis: A Case Study in Thoroughly Planned and Scheduled Well Delivery , 2010 .

[34]  Petter Osmundsen,et al.  Exploration Drilling Productivity at the Norwegian Shelf , 2009 .

[35]  Petter Osmundsen,et al.  Offshore oil service contracts new incentive schemes to promote drilling efficiency , 2010 .

[36]  Faouzi Masmoudi,et al.  A comprehensive literature classification of simulation optimisation methods , 2010 .

[37]  Glaydston Mattos Ribeiro,et al.  A Grasp with Path-Relinking for the Workover Rig Scheduling Problem , 2010, Int. J. Nat. Comput. Res..

[38]  Glaydston Mattos Ribeiro,et al.  A simple and robust Simulated Annealing algorithm for scheduling workover rigs on onshore oil fields , 2011, Comput. Ind. Eng..

[39]  Glaydston Mattos Ribeiro,et al.  A comparison of three metaheuristics for the workover rig routing problem , 2012, Eur. J. Oper. Res..

[40]  Christophe Duhamel,et al.  Models and hybrid methods for the onshore wells maintenance problem , 2012, Comput. Oper. Res..

[41]  Glaydston Mattos Ribeiro,et al.  A branch-price-and-cut algorithm for the workover rig routing problem , 2011, Comput. Oper. Res..