Planning and scheduling a fleet of rigs using simulation-optimization
暂无分享,去创建一个
Laura Bahiense | Hugo Vinícius Bassi | Virgílio Jose Martins Ferreira Filho | V. Filho | L. Bahiense
[1] J. S. Aronofsky,et al. Linear Programming A Problem-Solving Tool for Petroleum Industry Management , 1962 .
[2] W. A. Greaney,et al. A Stochastic Inventory Model for Scheduling Development Drilling , 1971 .
[3] J. J. Brennan,et al. Scheduling a Backlog of Oilwell Workovers , 1977 .
[4] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[5] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[6] Samuel J. Raff,et al. Routing and scheduling of vehicles and crews : The state of the art , 1983, Comput. Oper. Res..
[7] Mauricio G. C. Resende,et al. Greedy Randomized Adaptive Search Procedures , 1995, J. Glob. Optim..
[8] Ken Eagle,et al. Using Simulated Annealing to Schedule Oil Field Drilling Rigs , 1996 .
[9] Pierre Hansen,et al. Variable Neighborhood Search , 2018, Handbook of Heuristics.
[10] R. Paiva,et al. Otimização do itinerario de sondas de intervenção , 1997 .
[11] T. Kieu,et al. Evolutionary algorithms applied to Landau-gauge fixing , 1998, hep-lat/9809143.
[12] R. O. Paiva,et al. Optimizing the Itinerary of Workover Rigs , 2000 .
[13] Averill M. Law,et al. Simulation-based optimization , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[14] Pierre Hansen,et al. Variable Neighbourhood Search , 2003 .
[15] M. Bloch,et al. Risk Analysis For Optimizing Oil Well Drilling And Completion Schedules , 2003 .
[16] Fred Glover,et al. Advanced Optimization Methodology in the Oil and Gas Industry: The Theory of Scatter Search Techniques with Simple Examples , 2003 .
[17] Ali A. Garrouch,et al. An integrated approach for the planning and completion of horizontal and multilateral wells , 2004 .
[18] Ricardo M. S. Accioly,et al. Modeling dependence with copulas: a useful tool for field development decision process , 2004 .
[19] P. S. Rovina,et al. Drilling And Completion - How To Accomplish Capex And Schedule Managing Up To Sixrigs, Simultaneously , 2005 .
[20] Ali A. Garrouch,et al. A web-based expert system for the planning and completion of multilateral wells , 2005 .
[21] Michael C. Fu,et al. Chapter 19 Gradient Estimation , 2006, Simulation.
[22] Russell R. Barton,et al. Chapter 18 Metamodel-Based Simulation Optimization , 2006, Simulation.
[23] Thivanka Suresh Dedigama,et al. Drilling and Petroleum Engineering Program and Project Management at Santos Ltd , 2006 .
[24] Sigrún Andradóttir,et al. Chapter 20 An Overview of Simulation Optimization via Random Search , 2006, Simulation.
[25] Barry L. Nelson,et al. Chapter 17 Selecting the Best System , 2006, Simulation.
[26] Sigurdur Olafsson,et al. Chapter 21 Metaheuristics , 2006, Simulation.
[27] Celso C. Ribeiro,et al. Scheduling workover rigs for onshore oil production , 2006, Discret. Appl. Math..
[28] Morten Irgens,et al. Use of Advanced Optimization Techniques to Manage a Complex Drilling Schedule , 2007 .
[29] Leyuan Shi,et al. Some topics for simulation optimization , 2008, 2008 Winter Simulation Conference.
[30] Leyuan Shi,et al. Integrated dynamic and simulation model on coupled closed-loop workstation capacity controls in a multi-workstation production system , 2008, 2008 Winter Simulation Conference.
[31] Vineet Lasrado. Workover Rig Scheduling Using Reservoir Simulation , 2008 .
[32] Mauricio G. C. Resende,et al. Greedy Randomized Adaptive Search Procedures , 1995, J. Glob. Optim..
[33] Jonathan David Sprague,et al. Atlantis: A Case Study in Thoroughly Planned and Scheduled Well Delivery , 2010 .
[34] Petter Osmundsen,et al. Exploration Drilling Productivity at the Norwegian Shelf , 2009 .
[35] Petter Osmundsen,et al. Offshore oil service contracts new incentive schemes to promote drilling efficiency , 2010 .
[36] Faouzi Masmoudi,et al. A comprehensive literature classification of simulation optimisation methods , 2010 .
[37] Glaydston Mattos Ribeiro,et al. A Grasp with Path-Relinking for the Workover Rig Scheduling Problem , 2010, Int. J. Nat. Comput. Res..
[38] Glaydston Mattos Ribeiro,et al. A simple and robust Simulated Annealing algorithm for scheduling workover rigs on onshore oil fields , 2011, Comput. Ind. Eng..
[39] Glaydston Mattos Ribeiro,et al. A comparison of three metaheuristics for the workover rig routing problem , 2012, Eur. J. Oper. Res..
[40] Christophe Duhamel,et al. Models and hybrid methods for the onshore wells maintenance problem , 2012, Comput. Oper. Res..
[41] Glaydston Mattos Ribeiro,et al. A branch-price-and-cut algorithm for the workover rig routing problem , 2011, Comput. Oper. Res..