Dependency Analysis between CMMI Process Areas

SPI and in particular CMMI is being widely use by several organizations to improve their product quality. However, the SMEs are reluctant in adopting it and in particular maturity level 2 of CMMI, because they think that achieving this level is too expensive and do not see a clear benefit on it. Our solution to captivate the interest of SMEs in CMMI is the anticipation of some process areas of maturity level 3 considered as a benefit by the organization and implement those process areas at the same time of maturity level 2 of CMMI. In this paper, we identify the dependencies among all the process areas of CMMI and between all the process areas of each maturity level. Our study was conducted to identify the impact on the dependencies of maturity level 2 when we introduce some process areas of maturity level 3 in the implementation effort.

[1]  Mark Staples,et al.  Systematic review of organizational motivations for adopting CMM-based SPI , 2008, Inf. Softw. Technol..

[2]  Mary Beth Chrissis,et al.  CMMI(R): Guidelines for Process Integration and Product Improvement (2nd Edition) (The SEI Series in Software Engineering) , 2006 .

[3]  D. Ross Jeffery,et al.  An exploratory study of why organizations do not adopt CMMI , 2007, J. Syst. Softw..

[4]  Rory O'Connor,et al.  Investigating software process in practice: A grounded theory perspective , 2008, J. Syst. Softw..

[5]  Watts S. Humphrey,et al.  Introduction to the Team Software Process , 1999 .

[6]  Fergal McCaffery,et al.  An evaluation of CMMI process areas for small- to medium-sized software development organisations , 2005, Softw. Process. Improv. Pract..

[7]  Timo Varkoi,et al.  Standard based software process assessments in small companies , 2006, Softw. Process. Improv. Pract..

[8]  Terry Rout,et al.  Process improvement for small firms: An evaluation of the RAPID assessment-based method , 2006, Inf. Softw. Technol..

[9]  Diane L. Gibson,et al.  Demonstrating the Impact and Benefits of CMMI ® : An Update and Preliminary Results , 2003 .

[10]  Diane L. Gibson,et al.  Performance Results of CMMI ® -Based Process Improvement , 2006 .

[11]  Mark C. Paulk,et al.  A History of the Capability Maturity Model for Software , 2009 .

[12]  Evsevios Hadjicostas ISO 9000:2000 Quality Management System , 2004 .

[13]  E. Mohammadi,et al.  Barriers and facilitators related to the implementation of a physiological track and trigger system: A systematic review of the qualitative evidence , 2017, International journal for quality in health care : journal of the International Society for Quality in Health Care.

[14]  Xi Chen,et al.  Analysis of Dependencies between Specific Practices in CMMI Maturity Level 2 , 2008, EuroSPI.

[15]  G. Cuevas,et al.  CMMI-ACQ: A Formal Implementation Sequences of the Processes Areas at Maturity Level 2 , 2008, 2008 Electronics, Robotics and Automotive Mechanics Conference (CERMA '08).