A Three-Level Hierarchical Workload Management Scheme for Yard Cranes in Container Terminals
暂无分享,去创建一个
[1] Robert Stahlbock,et al. Efficiency considerations for sequencing and scheduling of double-rail-mounted gantry cranes at maritime container terminals , 2010 .
[2] Stefan Voß,et al. Container terminal operation and operations research — a classification and literature review , 2004 .
[3] Shell-Ying Huang,et al. Performing A* Search for Yard Crane Dispatching in Container Terminals , 2008, 2008 20th IEEE International Conference on Tools with Artificial Intelligence.
[4] Shell-Ying Huang,et al. Dynamic Space and Time Partitioning for Yard Crane Workload Management in Container Terminals , 2012, Transp. Sci..
[5] Chung-Lun Li,et al. Interblock Crane Deployment in Container Terminals , 2002, Transp. Sci..
[6] Kap Hwan Kim,et al. A beam search algorithm for the load sequencing of outbound containers in port container terminals , 2004 .
[7] Qiang Meng,et al. Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm , 2007 .
[8] Wen-Jing Hsu,et al. Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information , 2011, Adv. Eng. Informatics.
[9] Richard J. Linn,et al. Dynamic crane deployment in container storage yards , 2002 .
[10] Shell-Ying Huang,et al. An improved Least Cost Heuristic for dynamic yard crane deployment in container terminals , 2011, 2011 IEEE International Conference on Automation Science and Engineering.
[11] W. C. Ng,et al. Crane scheduling in container yards with inter-crane interference , 2005, Eur. J. Oper. Res..
[12] Shell-Ying Huang,et al. A two stage yard crane workload partitioning and job sequencing algorithm for container terminals , 2010, SAC '10.
[13] Stefan Voß,et al. Operations research at container terminals: a literature update , 2007, OR Spectr..
[14] Kap Hwan Kim,et al. Heuristic algorithms for routing yard‐side equipment for minimizing loading times in container terminals , 2003 .
[15] Qiang Meng,et al. Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminals , 2008 .
[16] Shell Ying Huang,et al. Deciding on planning windows by partitioning timefor yard crane management in container terminals , 2010 .
[17] Kap Hwan Kim,et al. An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals , 1999, Transp. Sci..
[18] Wen-Jing Hsu,et al. A simulation based hybrid algorithm for yard crane dispatching in container terminals , 2009, Proceedings of the 2009 Winter Simulation Conference (WSC).
[19] Kap Hwan Kim,et al. Load scheduling for multiple quay cranes in port container terminals , 2006, J. Intell. Manuf..
[20] Mark Goh,et al. Development and simulation analysis of real-time yard crane control systems for seaport container transshipment terminals , 2009, OR Spectr..
[21] Iris F. A. Vis,et al. Transshipment of containers at a container terminal: An overview , 2003, Eur. J. Oper. Res..
[22] Chuqian Zhang,et al. A heuristic for dynamic yard crane deployment in a container terminal , 2003 .
[23] Tetsuo Tomiyama,et al. Advanced Engineering Informatics , 2007, Adv. Eng. Informatics.