Communication and Interpretation of Results of Route Risk Analyses of Hazardous Materials Transportation by Railroad
暂无分享,去创建一个
[1] Kurt Fedra,et al. Integrated risk assessment and management: overview and state of the art , 1998 .
[2] P R Nayak,et al. EVENT PROBABILITIES AND IMPACT ZONES FOR HAZARDOUS MATERIALS ACCIDENTS ON RAILROADS , 1983 .
[3] Erhan Erkut,et al. The cost and risk impacts of rerouting railroad shipments of hazardous materials. , 2007, Accident; analysis and prevention.
[4] David Y. Jeong,et al. IMPROVED TANK CAR SAFETY RESEARCH , 2007 .
[5] Daniel C Smith,et al. Pipeline and Hazardous Materials Safety Administration , 2009 .
[6] Christopher P. L. Barkan,et al. BENEFIT-COST EVALUATION OF USING DIFFERENT SPECIFICATION TANK CARS TO REDUCE THE RISK OF TRANSPORTING ENVIRONMENTALLY SENSITIVE CHEMICALS , 1991 .
[7] Vedat Verter,et al. Chapter 9 Hazardous Materials Transportation , 2007, Transportation.
[8] M. Morris. Understanding Risk - Informing Decisions in a Democratic Society , 1997 .
[9] Stefano Giordani,et al. Finding minimum and equitable risk routes for hazmat shipments , 2007, Comput. Oper. Res..
[10] Roger Lovegrove,et al. Risk Assessment and Risk Communication in Civil Engineering , 2001 .
[11] C. Tyler Dick,et al. Railroad Derailment Factors Affecting Hazardous Materials Transportation Risk , 2003 .
[12] Christopher P L Barkan,et al. Improving the design of higher-capacity railway tank cars for hazardous materials transport: optimizing the trade-off between weight and safety. , 2008, Journal of hazardous materials.
[13] Pooja Anand. Cost -Effectiveness of Reducing Environmental Risk From Railroad Tank Car Transportation of Hazardous Materials , 2006 .
[14] Christopher P. L. Barkan,et al. Railroad Accident Rates for Use in Transportation Risk Analysis , 2004 .
[15] Satish V. Ukkusuri,et al. Optimizing the design of railway tank cars to minimize accident-caused releases , 2007, Comput. Oper. Res..
[16] Vedat Verter,et al. Hazardous materials transportation , 2011 .
[17] Christopher P. L. Barkan,et al. Effects of Route Rationalization on Hazardous Materials Transportation Risk , 2008 .
[18] Christopher P. L. Barkan,et al. The Effect of Rerouting and Tank Car Safety Design on the Risk of Rail Transport of Hazardous Materials , 2006 .
[19] Daniel A. Crowl,et al. Chemical Process Safety , 1990 .
[20] R. Keeney,et al. Improving risk communication. , 1986, Risk analysis : an official publication of the Society for Risk Analysis.
[21] Stanley S. Grossel,et al. Guidelines for Risk Based Process Safety, AIChE Center for Chemical Process Safety. Wiley-AIChE, New York (2007), 768pp., $150.00, ISBN: 978-0-470-16569-0 , 2008 .
[22] William E McConnaughey,et al. HAZARDOUS MATERIALS TRANSPORTATION , 1970 .
[23] A. J. Policastro,et al. Development of the table of initial isolation and protective action distances for the 2000 Emergency Response Guidebook. , 2001 .
[24] William A. Wallace,et al. Operational Risk Management: The Integration of Decision, Communications, and Multimedia Technologies , 1998 .
[25] William E. Dunn,et al. Application of a quantitative risk assessment method to emergency response planning , 2007, Comput. Oper. Res..
[26] Theodore S. Glickman. REROUTING RAILROAD SHIPMENTS OF HAZARDOUS MATERIALS TO AVOID POPULATED AREAS , 1983 .
[27] George F. List,et al. Critical Issues in Safe Transport of Hazardous Materials , 1989 .
[28] Yanfeng Ouyang,et al. Optimal Locations of Railroad Wayside Defect Detection Installations , 2009, Comput. Aided Civ. Infrastructure Eng..
[29] Mohd Rapik Saat,et al. Release Risk and Optimization of Railroad Tank Car Safety Design , 2005 .