Scheduling system with focus on practical concerns in repetitive projects
暂无分享,去创建一个
[1] James J. O'Brien. VPM Scheduling for High-Rise Buildings , 1975 .
[2] C J Khisty. THE APPLICATION OF THE "LINE OF BALANCE" TECHNIQUE TO THE CONSTRUCTION INDUSTRY , 1970 .
[3] Robert I. Carr,et al. Planning Construction of Repetitive Building Units , 1974 .
[4] Henry G. Irwig,et al. Disturbance Scheduling Technique for Managing Renovation Work , 1988 .
[5] David W. Johnston. LINEAR SCHEDULING METHOD FOR HIGHWAY CONSTRUCTION , 1981 .
[6] Boyd C. Paulson,et al. Professional Construction Management , 1978 .
[7] David B. Ashley. Simulation of Repetitive-Unit Construction , 1980 .
[8] James David Lutz. Planning of linear construction projects using *simulation and line of balance , 1990 .
[9] Photios G. Ioannou,et al. Scheduling projects with repeating activities , 1998 .
[10] Alan D. Russell,et al. New Generation of Planning Structures , 1993 .
[11] David W. Johnston,et al. Application of Linear Scheduling , 1986 .
[12] George S. Birrell. Construction Planning—Beyond the Critical Path , 1980 .
[13] David Arditi,et al. Line‐of‐Balance Scheduling in Pavement Construction , 1986 .
[14] David R. Riley,et al. Space Planning for Mechanical, Electrical, Plumbing and Fire Protection Trades in Multi-story Building Construction , 1997 .
[15] Oldrich Stradal,et al. Time Space Scheduling Method , 1982 .
[16] Shlomo Peer. Network Analysis and Construction Planning , 1974 .
[17] Hojjat Adeli,et al. Scheduling/Cost Optimization and Neural Dynamics Model for Construction , 1997 .
[18] Photios G. Ioannou,et al. Resource-Driven Scheduling for Repetitive Projects: A Pull-System Approach , 2001 .
[19] Michael C. Vorster,et al. LINEAR SCHEDULING AND VISUALIZATION , 1992 .
[20] James E. Rowings,et al. Linear Scheduling Model: Development of Controlling Activity Path , 1998 .
[21] Alan D. Russell,et al. Extensions to Linear Scheduling Optimization , 1988 .
[22] I-Tung Yang,et al. Repetitive project planner: Resource -driven scheduling for repetitive *construction projects. , 2002 .
[23] Robert Blynn Harris,et al. Precedence and Arrow Networking Techniques for Construction , 1980 .
[24] Richard Neale,et al. CPM/LOB: New Methodology to Integrate CPM and Line of Balance , 1994 .
[25] Joachim Dressler. Construction Management in West Germany , 1980 .
[26] Al Sarraj,et al. Formal Development of Line‐of‐Balance Technique , 1990 .
[27] James E. Rowings,et al. USE OF LINEAR SCHEDULING IN TRANSPORTATION PROJECTS , 1992 .
[28] Means,et al. Building construction cost data , 1943 .
[29] Emad Elbeltagi,et al. Closure of "Algorithm for Determining Controlling Path Considering Resource Continuity" , 2001 .