An Analysis on affecting factors about lowly using 3D CAD by using the AHP
暂无分享,去创建一个
Because the construction is becoming bigger and the construction environment is rapidly changing, IT/IS(Information Technology and Information System) of the construction is recently suggested with the alternative proposal. So not only is a study progressed in the area of the BIM(Buidilng Information Modeling), VC(Virtual Construction) and CIC (Computer-Integrated Construction) but also of the information database of the construction for building the information infrastructure of the construction in the domestic construction. Because object-oriented 3D CAD improves the efficiency of a design work and includes the object information which can use with the base of the information database of the construction, it has the high value not only in the design level but also in the construction life cycle. But compared with the effect, the use of 3D CAD is sluggish in the construction. In this study, after surveying about lowly using 3D CAD on the point of AEC (Architect-Engineer-Contract), the result is analyzed with AHP(Analytic Hierarchy Process). So the aim of this study is to offer the base to find the solution of the Affecting factors about lowly using 3D CAD.