A new multi-objective approach in order to balancing and sequencing U-shaped mixed model assembly line problem: a proposed heuristic algorithm
暂无分享,去创建一个
[1] H. Lorenz,et al. Jena Research Papers in Business and Economics Sequencing Mixed-Model Assembly Lines : Survey , Classification and Model Critique , 2007 .
[2] S. David Wu,et al. A new heuristic method for mixed model assembly line balancing problem , 2003 .
[3] Wen-Chyuan Chiang,et al. The stochastic U-line balancing problem: A heuristic procedure , 2006, Eur. J. Oper. Res..
[4] Javad Zahiri,et al. Multi-criteria sequencing problem in mixed-model synchronous assembly lines , 2013 .
[5] Avraham Shtub,et al. SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH , 1994 .
[6] P. Sivasankaran,et al. Literature review of assembly line balancing problems , 2014 .
[7] W. Kubiak. Minimizing variation of production rates in just-in-time systems: A survey☆ , 1993 .
[8] Parviz Fattahi,et al. Sequencing mixed-model assembly lines by considering feeding lines , 2012 .
[9] Robert T. Sumichrast,et al. Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems , 1990 .
[10] Zhenxin Cao,et al. Balancing and Sequencing Optimization of the Mixed Model Assembly Lines , 2008, 2008 International Symposium on Computer Science and Computational Technology.
[11] John Miltenburg,et al. Scheduling mixed-model multi-level just-in-time production systems , 1989 .
[12] Nick T. Thomopoulos,et al. Line Balancing-Sequencing for Mixed-Model Assembly , 1967 .
[13] Serpil Sayin,et al. Assembly line balancing in a mixed-model sequencing environment with synchronous transfers , 2003, Eur. J. Oper. Res..
[14] Katsuhisa Ohno,et al. A sequencing problem for a mixed-model assembly line in a JIT production system , 1994 .
[15] C Merengo,et al. Balancing and sequencing manual mixed-model assembly lines , 1999 .
[16] Maurizio Faccio,et al. Balancing–sequencing procedure for a mixed model assembly system in case of finite buffer capacity , 2009 .
[17] Brahim Hnich,et al. Balancing and scheduling of flexible mixed model assembly lines with parallel stations , 2012, The International Journal of Advanced Manufacturing Technology.
[18] Reza Tavakkoli-Moghaddam,et al. A multi-objective scatter search for a mixed-model assembly line sequencing problem , 2007, Adv. Eng. Informatics.
[19] John Miltenburg,et al. Balancing and Scheduling Mixed-Model U-Shaped Production Lines , 2002 .
[20] Uğur Özcan,et al. Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives , 2007, Appl. Math. Comput..
[21] J. Betts,et al. A method for assembly line balancing , 1989 .
[22] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[23] Ana S. Simaria,et al. Combining heuristic procedures and simulation models for balancing a PC camera assembly line , 2005, Comput. Ind. Eng..
[24] Yeongho Kim,et al. An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines , 2006, Eur. J. Oper. Res..
[25] Yeongho Kim,et al. A genetic alorithm for multiple objective sequencing problems in mixed model assembly lines , 1998 .
[26] Armin Scholl,et al. Pattern Based Vocabulary Building for Effectively Sequencing Mixed-Model Assembly Lines , 1998, J. Heuristics.
[27] Nguyen Van Hop,et al. A heuristic solution for fuzzy mixed-model line balancing problem , 2006, Eur. J. Oper. Res..