Use of PC elements for waste minimization in the Sri Lankan construction industry
暂无分享,去创建一个
[1] George Ofori,et al. Building waste assessment score: design-based tool , 2004 .
[2] R. Straatman,et al. Precast construction and environment , 2001 .
[3] Charles J. Kibert,et al. Strategies for successful construction and demolition waste recycling operations , 1997 .
[4] Chi Sun Poon,et al. Reducing building waste at construction sites in Hong Kong , 2004 .
[5] Dilanthi Amaratunga,et al. Attitudes and perceptions of construction workforce on construction waste in Sri Lanka , 2006 .
[6] Chi Sun Poon,et al. Management of construction waste in public housing projects in Hong Kong , 2004 .
[7] George Ofori,et al. CONSTRUCTION MATERIAL WASTE SOURCE EVALUATION , 2000 .
[8] Nashwan Dawood,et al. Development Framework of an Artificial Intelligence Planner Framework for Bespoke Precast Concrete Production , 2003 .
[9] Hjh Jos Brouwers,et al. Construction Waste: Quantification and Source Evaluation , 1996 .
[10] Low Sui Pheng,et al. How 'just-in-time' wastages can be quantified: case study of a private condominium project , 1998 .
[11] Martin Loosemore,et al. A theory of waste behaviour in the construction industry , 2001 .
[12] Evia O.W. Wong,et al. Promoting sustainable construction waste management in Hong Kong , 2004 .
[13] Leonhard E. Bernold,et al. Source evaluation of solid waste in building construction , 1994 .
[14] O. O. Faniran,et al. Minimizing waste on construction project sites , 1998 .
[15] Mark Smithers,et al. Implementing a waste management plan during the construction phase of a project: a case study , 1998 .