Implementation of Input-Process-Output Model for Measuring Information System Project Success

Measurement of the information system (IS) project success has become the interesting topic for researchers and practitioners since the Standish Group published their findings in 1994.  Project success theory is the main concept in this topic, but this theory is still an ambiguous concept and lack in agreement among researchers and practitioners. They are also still tend to focus on single or partial dimension. Therefore, they did not get a clear picture of the system measurements. This study developed an alternative model of the project success measurement based on input-process-output (IPO) model. The development was conducted using comparison, adoption, adaptation, and combination the previous theories and models: Davis's IPO model, the project success theories, Delone and McLean' model, and the project classificatory framework. As indicated in most studies that most of models are developed using the previous theories and models rather than on empirical proofs. The result is a IS project success model consisting of 9 variables and 36 relationships among the variables. Although, the model is only a conceptual model, but it was developed completely and coherently considering three main aspects of project success measurement, namely: processional and causal models, project success theories, and the influence concept of project environment.

[1]  Stephen G. MacDonell,et al.  Factors that affect software systems development project outcomes: A survey of research , 2011, CSUR.

[2]  Yi-Shun Wang Assessing e‐commerce systems success: a respecification and validation of the DeLone and McLean model of IS success , 2008, Inf. Syst. J..

[3]  Robert L. Glass IT Failure Rates--70% or 10-15%? , 2005, IEEE Softw..

[4]  Fred D. Davis Perceived Usefulness, Perceived Ease of Use, and User Acceptance of Information Technology , 1989, MIS Q..

[5]  Anton de Wit,et al.  Measurement of project success , 1988 .

[6]  Richard O. Mason,et al.  Measuring information output: A communication systems approach , 1978, Inf. Manag..

[7]  Clare Chua,et al.  Perception of Quality in Higher Education , 2004 .

[8]  Lavagnon A. Ika Project Success as a Topic in Project Management Journals , 2009 .

[9]  Sundas Rauf,et al.  The Integrated Model to Measure the Impact of E-Banking on Commercial Bank Profitability: Evidence from Pakistan , 2014 .

[10]  Per Runeson,et al.  Guidelines for conducting and reporting case study research in software engineering , 2009, Empirical Software Engineering.

[11]  Ephraim R. McLean,et al.  The DeLone and McLean Model of Information Systems Success: A Ten-Year Update , 2003, J. Manag. Inf. Syst..

[12]  Peter B. Seddon,et al.  A Partial Test and Development of Delone and Mclean's Model of IS Success , 1996, Australas. J. Inf. Syst..

[13]  Robert L. Glass,et al.  The Standish report: does it really describe a software crisis? , 2006, CACM.

[14]  W. Doll,et al.  The development of a tool for measuring the perceived impact of information technology on work , 1999 .

[15]  William H. DeLone,et al.  Global boundaries, task processes and IS project success: a field study , 2006, Inf. Technol. People.

[16]  Juhani Iivari,et al.  An empirical test of the DeLone-McLean model of information system success , 2005, DATB.

[17]  Helail Almutairi,et al.  An Empirical Application of the Delone and Mclean Model in the Kuwaiti Private Sector , 2005, J. Comput. Inf. Syst..

[18]  Keen An Empirical Evaluation of User Information Satisfaction (UIS) Measures for Use with General Ledger Accounting Software I. Introduction , 2002 .

[19]  Chris Verhoef,et al.  The rise and fall of the Chaos report figures , 2010, IEEE Software.

[20]  Guru Prakash Prabhakar,et al.  Projects and Their Management: A Literature Review , 2009 .

[21]  C. S Lim,et al.  Criteria of project success: an exploratory re-examination , 1999 .

[22]  Rajiv Sabherwal,et al.  The Relationship Between Information System Planning Sophistication and Information System Success: An Empirical Assessment* , 1999 .

[23]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[24]  Nils Urbach,et al.  The Updated DeLone and McLean Model of Information Systems Success , 2012 .

[25]  Darshana Sedera,et al.  A Factor and Structural Equation analysis of the Enterprise Systems Success Measurement Model , 2004, AMCIS.

[26]  Arun Rai,et al.  Assessing the Validity of IS Success Models: An Empirical Test and Theoretical Analysis , 2002, Inf. Syst. Res..

[27]  John Wateridge,et al.  How can IS/IT projects be measured for success? , 1998 .

[28]  Kam Jugdev,et al.  A Retrospective look at our Evolving Understanding of Project Success , 2005, IEEE Engineering Management Review.

[29]  Ephraim R. McLean,et al.  Measuring information systems success: models, dimensions, measures, and interrelationships , 2008, Eur. J. Inf. Syst..

[30]  A'ang Subiyakto,et al.  A coherent framework for understanding critical success factors of ICT project environment , 2013, 2013 International Conference on Research and Innovation in Information Systems (ICRIIS).

[31]  David England,et al.  How Standard Are Standards: An Examination of Language Emphasis in Project Management Standards , 2007 .

[32]  Gerold Riempp,et al.  The State of Research on Information Systems Success , 2009, Bus. Inf. Syst. Eng..

[33]  Adnane Belout,et al.  Factors influencing project success: the impact of human resource management , 2004 .

[34]  Tao Xu,et al.  Security Interaction of Web Services in Heterogeneous Platforms , 2014 .

[35]  David Baccarini,et al.  The Logical Framework Method for Defining Project Success , 1999 .

[36]  Richard T. Watson,et al.  Service Quality: A Measure of Information System Effectiveness , 1995, MIS Q..

[37]  Darshana Sedera,et al.  Re-conceptualizing Information System Success: The IS-Impact Measurement Model , 2008, J. Assoc. Inf. Syst..

[38]  James C. Brancheau,et al.  Adoption and Utilization of Commercial Software Packages: Exploring Utilization Equilibria, Transitions, Triggers, and Tracks , 1999, J. Manag. Inf. Syst..

[39]  William R. King,et al.  Measuring the Performance of Information Systems: A Functional Scorecard , 2005, J. Manag. Inf. Syst..

[40]  Magne Jørgensen,et al.  How large are software cost overruns? A review of the 1994 CHAOS report , 2006, Inf. Softw. Technol..

[41]  David Eager,et al.  Understanding project success: The four-level project success framework , 2011, 2011 IEEE International Conference on Industrial Engineering and Engineering Management.

[42]  Shahnawaz Talpur,et al.  Input-Current and Load Voltage Sharing in Input-Parallel Output-Series Connected Boost Half Bridge DC-DC Converter Using Stable Control Scheme , 2014 .