Configuration Management maturation: An empirical investigation

Process capabilities, which are the outcomes of both Critical Success Factors and Barriers, could play an essential part in the implementation and continuous development of a process. This article explores the Configuration Management process capabilities extracted on the basis of semi-structured interviews with Configuration Management professionals and analysis of two highly significant studies in the development of Configuration Management as a researchable topic. The first study investigated the Critical Success Factors for successful Configuration Management development, while the other study looked at the identification of barriers to effective Configuration Management deployment. It is evident that the majority of research studies on process maturity concepts have focused on process capability itself, not the success or failure of Configuration Management. A list of 10 process capabilities and 35 constructs (C1–C35) are established which would provide necessary foundation for the effective implementation of CM practices.

[1]  Jože Tavčar,et al.  Engineering change management in individual and mass production , 2005 .

[2]  Thomas F. Burgess,et al.  Configuration management in the aerospace industry: a review of industry practice , 2005 .

[3]  A Fowler Models and applications of configuration management , 1993 .

[4]  Silvia Inês Dallavalle de Pádua,et al.  Process management tasks and barriers: functional to processes approach , 2012, Bus. Process. Manag. J..

[5]  Alan Fowler Case experience of implementing configuration management in a UK shipbuilding organization , 1996 .

[6]  Francesca Montagna,et al.  Understanding the organizational impact of PLM systems: evidence from an aerospace company , 2012 .

[7]  Zining Guo,et al.  A paradigmatic and methodological examination of knowledge management research: 2000 to 2004 , 2008, Decis. Support Syst..

[8]  Vincent C. Guess CMII of Business Process Infrastructure , 2002 .

[9]  Regine W. Vroom,et al.  An industry approach to shared, cross-organisational engineering change handling - The road towards standards for product data processing , 2011, Comput. Aided Des..

[10]  A. J. Veal Research Methods for Leisure and Tourism: A Practical Guide , 1997 .

[11]  Frank B. Watts Configuration Management Metrics , 2009 .

[12]  Frank B. Watts Engineering Documentation Control Handbook: Configuration Management for Industry , 1993 .

[13]  Usman Ali,et al.  Configuration Management Process Capabilities , 2013 .

[14]  Usman Ali,et al.  Barriers to effective configuration management application in a project context: An empirical investigation , 2014 .

[15]  David D. Lyon Practical CM: Best Configuration Management Practices for the 21st Century , 2000 .

[16]  Mark C. Paulk,et al.  Capability Maturity Model for Software, Version 1.1 , 1993 .

[17]  Cmmi Product Team CMMI for Development, Version 1.2 , 2010 .

[18]  J. Rodney Turner,et al.  The handbook of project-based management : improving the processes for achieving strategic objectives , 1998 .

[19]  Janice Thomas,et al.  Project management maturity models: The silver bullets of competitive advantage. , 2002 .

[20]  Joyce Fortune,et al.  Framing of project critical success factors by a systems model , 2006 .

[21]  Didar Zowghi,et al.  A Maturity Model for the Implementation of Software Process Improvement: an Empirical Study , 2022 .

[22]  Callum Kidd,et al.  Critical success factors for configuration management implementation , 2013, Ind. Manag. Data Syst..

[23]  Kam Jugdev,et al.  2002 Student Paper Award Winner: Project Management Maturity Models: The Silver Bullets of Competitive Advantage? , 2002 .

[24]  Fergal McCaffery,et al.  Developing a configuration management capability model for the medical device industry , 2007, Int. J. Inf. Syst. Chang. Manag..

[25]  Claudia Eckert,et al.  Engineering change: an overview and perspective on the literature , 2011 .

[26]  K T Yeo,et al.  Risk management capability maturity model for complex product systems (CoPS) projects , 2009, Syst. Eng..

[27]  T. F. Burgess,et al.  Making project status visible in complex aerospace projects , 2003 .

[28]  GuoZining,et al.  A paradigmatic and methodological examination of knowledge management research , 2008 .