The impact of building information modelling on estimating practice: analysis of perspectives from four organizational business models
暂无分享,去创建一个
[1] Markus König,et al. Visual Simulation - An Appropriate Approach to Support Execution Planning in Building Engineering , 2007 .
[2] David Lowe,et al. Human effects in construction contract price forecasting: Experience and experiential learning styles , 2001 .
[3] Tao-chiu Tse. The interoperability of building information models and document models in the Hong Kong construction industry , 2009 .
[4] Franco K.T. Cheung,et al. A study of clients' and estimators' tolerance towards estimating errors , 2008 .
[5] Terje Aven,et al. Foundations of risk analysis : a knowledge and decision-oriented perspective , 2003 .
[6] Shu-Shun Liu,et al. Resource-constrained construction project scheduling model for profit maximization considering cash flow , 2008 .
[7] Frank Bomarius,et al. COBRA: a hybrid method for software cost estimation, benchmarking, and risk assessment , 1998, Proceedings of the 20th International Conference on Software Engineering.
[8] D. Nicholls,et al. Qualitative research. Part 1: Philosophies , 2009 .
[9] Salman Azhar,et al. BIM for Sustainability Analyses , 2009 .
[10] John Messner,et al. Comparing traditional schematic design documentation to a schematic building information model , 2007 .
[11] A. C. Williams,et al. On Competitive Bidding , 1975, Oper. Res..
[12] G. Elwyn,et al. Towards a feasible model for shared decision making: focus group study with general practice registrars , 1999, BMJ.
[13] G. Runeson,et al. Pre-tender and post-tender negotiations in Australia , 1984 .
[14] Y. Engeström,et al. Perspectives on activity theory: Innovative learning in work teams: Analyzing cycles of knowledge creation in practice , 1999 .
[15] G. B. Swartz,et al. Estimation of Weibull Parameters from Two‐Order Statistics , 1975 .
[16] R. Galliers. Strategic information systems planning: myths, reality and guidelines for successful implementation , 1991 .
[17] David Mills. Least‐Cost Planning and Electricity Industry Reform in Australia , 2001 .
[18] Jordi Comas,et al. Connecting Knowledge Management and Experiential Learning to Gain New Insights and Research Perspectives , 2001, ECIS.
[19] D. Buchanan,et al. No Going Back: A Review of the Literature on Sustaining Organizational Change , 2005 .
[20] Alfred E. Thal,et al. Estimation of Cost Contingency for Air Force Construction Projects , 2010 .
[21] Richard J. Smith,et al. Estimating local Lyapunov exponents , 1997 .
[22] Kenneth Lieberthal. Governing China: From Revolution Through Reform , 1995 .
[23] Michael Rosemann,et al. Integrated Process Modeling: An Ontological Evaluation , 2000, Inf. Syst..
[24] David M. Dilts,et al. Automated design-to-cost: integrating costing into the design decision , 1996, Comput. Aided Des..
[25] John Haymaker,et al. Multidisciplinary process integration and design optimization of a classroom building , 2009, J. Inf. Technol. Constr..
[26] Angela Lee,et al. Developing a vision for an nD modelling tool , 2002 .
[27] Ming Sun,et al. Cost and time control of construction projects: inhibiting factors and mitigating measures in practice , 2010 .
[28] Anthony Speaight,et al. Architect's Legal Handbook: The Law for Architects , 2014 .
[29] Roger Flanagan,et al. The accuracy and monitoring of quantity surveyors' price forecasting for building work , 1983 .
[30] Abbas Afshar,et al. A min-max regret approach to unbalanced bidding in construction , 2010 .
[31] Amarjit Singh,et al. Studies on the impact of functional analysis concept design on reduction in change orders , 1999 .
[32] Mahmoud R. Halfawy. Integration of data and processes of AEC projects using the industry foundation classes , 2005 .
[33] Martin Skitmore,et al. A Multivariate Approach to Construction Contract Bidding Mark-up Strategies , 1994 .
[34] Willy Sher,et al. Measuring BIM performance: Five metrics , 2012 .
[35] W. G. Hunter,et al. Experimental Design: Review and Comment , 1984 .
[36] Sten Bonke,et al. Changes in the Danish construction sector: the need for a new focus , 2005 .
[37] David Baccarini,et al. The Use of Bills of Quantities in Construction Projects - An Australian Survey , 2004 .
[38] Tong Yizhe,et al. Unbalanced bidding on contracts with variation trends in client-provided quantities , 1992 .
[39] Symeon E. Christodoulou. Bid mark‐up selection using artificial neural networks and an entropy metric , 2010 .
[40] H. A. Lingstone,et al. The Delphi Method: Techniques and Applications , 1976 .
[41] Thomas Becker,et al. Integrated 3D Modeling of Multi-utility Networks and Their Interdependencies for Critical Infrastructure Analysis , 2011 .
[42] R. Nkado,et al. COMPETENCIES REQUIRED BY QUANTITY SURVEYORS IN SOUTH AFRICA , 2005 .
[43] Theo Haupt,et al. Construction cost variability: does it really matter? An exploratory study , 2008 .
[44] Wen‐Hsien Tsai,et al. Quality cost measurement under activity‐based costing , 1998 .
[45] Shlomo Selinger,et al. Computerized method for quantity surveying , 1983 .
[46] Charles M. Eastman,et al. A database architecture for design collaboration , 1998 .
[47] L. Swaffield,et al. The contractor's use of life cycle costing on PFI projects , 2008 .
[48] A. McAloon,et al. A process model to estimate biodiesel production costs. , 2006, Bioresource technology.
[49] Michael Hoxley. The fee tendering and service quality issue revisited , 2007 .
[50] Andries G. Doree,et al. Collusion in the Dutch construction industry: An industrial organization perspective , 2004 .
[51] R. E. Miles,et al. Causes of Failure in Network Organizations , 1992 .
[52] Richard Fellows,et al. Leadership style and power relations in quantity surveying in Hong Kong , 2003 .
[53] Akintola Akintoye,et al. A survey of current cost estimating practices in the UK , 2000 .
[54] Sangyoon Chin,et al. Automated Building Information Modeling System for Building Interior to Improve Productivity of BIM-based Quantity Take-Off , 2009 .
[55] Reza Abbasnia,et al. Optimization of uncertain construction time-cost trade-off problem , 2008 .
[56] Oluwole Alfred Olatunji,et al. Modelling the costs of corporate implementation of building information modelling , 2011 .
[57] Ghang Lee,et al. Editorial - Case studies of BIM in use , 2008, J. Inf. Technol. Constr..
[58] Pak Yoong,et al. Role of mobile technology in the construction industry - a case study , 2009, Int. J. Bus. Inf. Syst..
[59] Akintola Akintoye,et al. Pricing approaches in the construction industry , 1992 .
[60] David Baccarini. Understanding project cost contingency: A survey , 2005 .
[61] Ghassan Aouad,et al. Performance management in construction: a conceptual framework , 2001 .
[62] Rafael Sacks,et al. Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .
[63] Yongsheng Ma,et al. Parametric CAD/CAE integration using a common data model , 2011 .
[64] A. Dainty,et al. Synthesising emerging issues within key futures study reports in construction , 2006 .
[65] John S. Gero,et al. Comparing collaborative co-located and distributed design processes in digital and traditional sketching environments: A protocol study using the function-behaviour-structure coding scheme , 2011 .
[66] D. R. Ogunsemi,et al. Time‐cost model for building projects in Nigeria , 2006 .
[67] Will Hughes,et al. Understanding construction consortia: Theory, practice and opinions , 2006 .
[68] Chaomei Chen,et al. Top 10 Unsolved Information Visualization Problems , 2005, IEEE Computer Graphics and Applications.
[69] Scott E. Maxwell,et al. Designing Experiments and Analyzing Data , 1992 .
[70] Peter Wynn. Contracting for Engineering and Construction Projects , 2001 .
[71] J. M. Daschbach,et al. Design analysis through techniques of parametric cost estimation , 1988 .
[72] Marvin Gates. GATES' BIDDING MODEL--A MONTE CARLO EXPERIMENT , 1976 .
[73] Oluwole Alfred Olatunji,et al. A preliminary review on the legal implications of BIM and model ownership , 2011, J. Inf. Technol. Constr..
[74] K. T. Odusami,et al. Perceptions of Construction Professionals Concerning Important Skills of Effective Project Leaders , 2002 .
[75] Zhi-Long Chen,et al. A scenario-based stochastic programming approach for technology and capacity planning , 2002, Comput. Oper. Res..
[76] Stephen L. Kajewski,et al. ICT in the Australian Construction industry: Status, training and Perspectives , 2004 .
[77] Javier Monedero,et al. Parametric Design. A Review and Some Experiences , 2000, Proceedings of the 15th International Conference on Education and Research in Computer Aided Architectural Design in Europe (eCAADe).
[78] Assem Al-Hajj,et al. Modelling the running costs of buildings , 1998 .
[79] Ali Mohammed Alashwal,et al. Knowledge sharing in a fragmented construction industry: On the hindsight , 2011 .
[80] Weisheng Lu,et al. Optimizing construction planning schedules by virtual prototyping enabled resource analysis , 2009 .
[81] Graham Ive,et al. A survey of building price indices compiliation methods in Britain , 2006 .
[82] Hugh Kutz. A virtual success , 2006 .
[83] W. A Bello,et al. Project variables influencing contingency on construction contract in Nigeria , 2009 .
[84] Carlos Torres Formoso,et al. A model for integrating cost management and production planning and control in construction , 2006 .
[85] Raja R. A. Issa,et al. Quantitative evaluation of the BIM-assisted construction detailed cost estimates , 2010, J. Inf. Technol. Constr..
[86] Phuwadol Samphaongoen,et al. A Visual Approach to Construction Cost Estimating , 2010 .
[87] Zayyana Shehu,et al. Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis , 2010 .
[88] Ruben de Laat,et al. Integration of BIM and GIS: The Development of the CityGML GeoBIM Extension , 2011 .
[89] E. Brynjolfsson,et al. Beyond Computation: Information Technology, Organizational Transformation and Business Performance , 2000 .
[90] Info Tech. Requirements analysis report for transport estimation, preconstruction, construction, decision support and electronic bidding systems , 2009 .
[91] Ljiljana Brankovic,et al. BUILDING INFORMATION MODELLING PROJECT DECISION SUPPORT FRAMEWORK , 2008 .
[92] A. Onwuegbuzie,et al. Toward a Definition of Mixed Methods Research , 2007 .
[93] Willy Sher,et al. Artificial neural network for the selection of buildable structural systems , 2003 .
[94] Lars Lindkvist,et al. Project organization : Exploring its adaptation properties , 2008 .
[95] Tomson Ogwang,et al. The stochastic approach to price index numbers: An expository note , 1995 .
[96] Sadi Assaf,et al. The management of construction company overhead costs , 2001 .
[97] Radhika Nagpal,et al. Collective Construction Using Lego Robots , 2006, AAAI.
[98] Martin Skitmore,et al. Valuation accuracy and variation: a meta analysis , 2007 .
[99] Ammar P. Kaka,et al. The risks of unbalanced bidding , 2010 .
[100] Matthew W. Sakal. Project Alliancing: A Relational Contracting Mechanism for Dynamic Projects , 2005 .
[101] Henry Odeyinka,et al. Modelling risk impacts on the budgeted cost of traditionally procured building projects , 2007 .
[102] David Lowe,et al. Effective feedback and systematic reflection in design cost estimating , 1998 .
[103] Tao-chiu Kenny Tse,et al. A case study of the ISO13567 CAD layering standard for automated quantity measurement in Hong Kong , 2004, J. Inf. Technol. Constr..
[104] Vishal Singh,et al. Adopting building information modeling (BIM) as collaboration platform in the design industry , 2008 .
[105] Angela Clarke,et al. The development of a best practice model for change management , 1997 .
[106] Ueli Rutishauser,et al. Adaptive Building Automation A multi-Agent approach , 2002 .
[107] John Whittaker,et al. Managerial Judgement in a Competitive Bidding Model , 1973 .
[108] Thayaparan Gajendran,et al. Emerging ICT trends in construction project teams: a Delphi survey , 2009, J. Inf. Technol. Constr..
[109] Roger J. Rezabek,et al. Online Focus Groups: Electronic Discussions for Research , 2000 .
[110] Peter E.D. Love,et al. Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .
[111] Turker Bayrak. Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge , 2008 .
[112] Martin Skitmore,et al. The image of the construction industry: a cross sectional analysis , 1991 .
[113] Terry Meyer,et al. Competencies of professional quantity surveyors: A South African perspective , 2001 .
[114] Ying Jiang,et al. BIM IN 2007 - ARE WE THERE YET? , 2007 .
[115] I-Tung Yang,et al. Simulation-based estimation for correlated cost elements , 2005 .
[116] Khaled Nassar. Assessing Building Information Modeling Estimating Techniques Using Data from the Classroom , 2012 .
[117] Abbas Tashakkori,et al. Mixed Methodology: Combining Qualitative and Quantitative Approaches , 1998 .
[118] Min-Yuan Cheng,et al. Construction Conceptual Cost Estimates Using Support Vector Machine , 2005 .
[119] Nancy L. Holland,et al. Indirect Cost Categorization and Allocation by Construction Contractors , 1999 .
[120] Marton Marosszeky,et al. Managing subcontractor supply chain for quality in construction , 2006 .
[121] Naomi Garnett,et al. Project modelling in construction: --seeing is believing , 1997 .
[122] Sai On Cheung,et al. An integrated regression analysis and time series model for construction tender price index forecasting , 2004 .
[123] Mustafa Alshawi,et al. Data and process models for the integration of estimating and valuation , 1997 .
[124] Radhika Nagpal,et al. Three-Dimensional Construction with Mobile Robots and Modular Blocks , 2008, Int. J. Robotics Res..
[125] Stephen L. Kajewski,et al. Improving ICT Integration in Today's AEC Industry: Recommendations & Guidelines , 2001 .
[126] K. Reeves,et al. Construction business systems in Japan: general contractors and subcontractors , 2002 .
[127] Eilif Hjelseth,et al. OVERVIEW OF CONCEPTS FOR MODEL CHECKING , 2010 .
[128] Frederic C. Jelen,et al. Cost and Optimization Engineering , 1970 .
[129] Peter Edwards,et al. Risk and risk management in construction: a review and future directions for research , 1998 .
[130] Rajkumar Roy,et al. Evolutionary Optimization of Business Process Designs , 2007, Evolutionary Scheduling.
[131] Osama Moselhi,et al. Integrating automated data acquisition technologies for progress reporting of construction projects , 2009 .
[132] Gary David Holt,et al. Lowest price or value? Investigation of UK construction clients' tender selection process , 2000 .
[133] Jennifer R. Walton,et al. Improving Conceptual Estimating Methods Using Historical Cost Data , 1997 .
[134] Remo Aslak Burkhard,et al. Towards a Framework and a Model for Knowledge Visualization: Synergies Between Information and Knowledge Visualization , 2005, Knowledge and Information Visualization.
[135] Kaichang Di,et al. Rational Functions and Potential for Rigorous Sensor Model Recovery , 2003 .
[136] Xinan Jiang,et al. Developments in cost estimating and scheduling in BIM technology , 2011 .
[137] Chris Baber,et al. User evaluation of augmented reality systems , 2003, Proceedings on Seventh International Conference on Information Visualization, 2003. IV 2003..
[138] David Arditi,et al. Estimating system selection expert , 1991 .
[139] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[140] Symeon E. Christodoulou,et al. Optimum Bid Markup Calculation Using Neurofuzzy Systems and Multidimensional Risk Analysis Algorithm , 2004 .
[141] Soonhung Han,et al. Repairing CAD model errors based on the design history , 2006, Comput. Aided Des..
[142] William J. Trahant. Managing the change process : a field book for change agents, consultants, team leaders, and reengineering managers , 2002 .
[143] Dermott McMeel,et al. Unstable Building: virtual environments and real relevance , 2011, J. Inf. Technol. Constr..
[144] Rizal Sebastian,et al. Changing roles of the clients, architects and contractors through BIM , 2011 .
[145] Serge J. Belongie,et al. Behavior recognition via sparse spatio-temporal features , 2005, 2005 IEEE International Workshop on Visual Surveillance and Performance Evaluation of Tracking and Surveillance.
[146] Robert M. Stark,et al. Unbalanced Highway Contract Tendering , 1974 .
[147] James T. O'Connor,et al. Preliminary Cost Estimates Using Probabilistic Simulation for Highway Bridge Replacement Projects , 2005 .
[148] Bernd Heinrich,et al. Automated Planning of Process Models: The Constructions of Exclusive Choices , 2009, ICIS.
[149] Martin Skitmore. Expenditure Flow Forecasting Models , 1993 .
[150] Kevin J. Dooley,et al. A Complex Adaptive Systems Model of Organization Change , 1997 .
[151] R. Alan Bowman. Developing activity duration specification limits for effective project control , 2006, Eur. J. Oper. Res..
[152] Hisham M. Abdelsalam,et al. Cost of quality in Dubai: An analytical case study of residential construction projects , 2009 .
[153] Jennifer Whyte,et al. Virtual Reality and the Built Environment , 2003, Presence: Teleoperators & Virtual Environments.
[154] Eiichi Gotoh,et al. CONSTRUCTION ENGINEERING AND MANAGEMENT , 1991 .
[155] Y. Engeström,et al. Studies of expansive learning: Foundations, findings and future challenges , 2010 .
[156] Francis J. Bromilow. The impact of inflation and industrial strife on the construction industry in Australia , 1981 .
[157] A. A. Ondar,et al. Graphical method for planning and managing the estimated cost of scientific-research and experimental operations , 1973 .
[158] Keith Collier. Fundamentals of construction estimating and cost accounting , 1974 .
[159] Kwaku A Tenah. Management level as defined and applied within a construction organization by some US contractors and engineers , 1986 .
[160] Chimay J. Anumba. Functional integration in CAD systems , 1996 .
[161] Oluwole Alfred Olatunji. BIM adoption: a conceptual model for managing practice changes in estimating organizations , 2010 .
[162] Kin Keung Lai,et al. A general multivariate analysis approach for determining bid mark‐up strategy , 2005 .
[163] Joseph Ahn,et al. Military Facility Cost Estimation System Using Case-Based Reasoning in Korea , 2011, J. Comput. Civ. Eng..
[164] John M. Kamara,et al. Capturing client requirements in construction projects , 2002 .
[165] Richard Fellows,et al. Behaviour of quantity surveyors as organizational citizens , 2008 .
[166] R. Kennedy,et al. RE-ENGINEERING THE CONSTRUCTION DELIVERY PROCESS , 2001 .
[167] Gert-Jan de Vreede,et al. Collaborative Business Engineering with Animated Electronic Meetings , 1997, J. Manag. Inf. Syst..
[168] Håkan Norberg,et al. On-site production synchronisation : improving the resource-flow in construction projects , 2008 .
[169] Robert Owen,et al. Interaction of Lean and Building Information Modeling in Construction , 2010 .
[170] Jaewook Lee,et al. Conflict resolution in multi-agent based Intelligent Environments , 2010 .
[171] P Garside,et al. Organisational context for quality: lessons from the fields of organisational development and change management. , 1998, Quality in health care : QHC.
[172] David Campbell,et al. Flexibility in Long-Term Contractual Relationships: The Role of Co-Operation. , 1993, Lean Construction Journal.
[173] Martin Skitmore,et al. Ethics in Tendering: A Survey of Australian Opinion and Practice , 1999 .
[174] J. Gero,et al. The impact of working memory limitations on the design process during conceptualization , 2007 .
[175] Can Balkaya,et al. Finite Element Analysis and Practical Modeling of Reinforced Concrete Multi-Bin Circular Silos , 2006 .
[176] Oluwole Alfred Olatunji,et al. The impact of oil price regimes on construction cost in Nigeria , 2010 .
[177] Anthony Williams,et al. Heading into new virtual environments: what skills do design team members need? , 2009, J. Inf. Technol. Constr..
[178] Mustafa Alshawi,et al. Augmented process model for e-tendering: Towards integrating object models with document management systems , 2010 .
[179] Shigeomi Nishigaki,et al. Development of virtual and real-field construction management systems in innovative, intelligent field factory , 2000 .
[180] R. E. Miles,et al. Organizations: New Concepts for New Forms , 1986 .
[181] Willy Sher,et al. Building information modelling (BIM) system in construction in 2020: opportunities and implications , 2009 .
[182] G. Duelen,et al. Use of CAD-data for the off-line programming of industrial robots , 1987, Robotics.
[183] Weiming Shen,et al. Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review , 2010, Adv. Eng. Informatics.
[184] Yaxin Bi,et al. A Conceptual Knowledge-Based Cost Model for Optimizing the Selection of Materials and Technology for Building Design , 2008 .
[185] Martin Fischer,et al. Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..
[186] Douglas Gransberga. Construction Management and Economics , 2010 .
[187] Bo-Christer Björk,et al. A scenario for the development and implementation of a building product model standard , 1989 .
[188] Martin Skitmore,et al. Contractor selection using multi criteria utility theory: an additive mode , 1998 .
[189] Vincent Ng,et al. A study of quantity surveyors' ethical behaviour , 2001 .
[190] Sevasti-Melissa Nolas,et al. Pluralism in qualitative research: the impact of different researchers and qualitative approaches on the analysis of qualitative data , 2010 .
[191] J. L. Stimpert. Managerial and Organizational Cognition: Theory, Methods and Research , 1999 .
[192] Bilal Succar,et al. Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .
[193] José L. Fernández-Solís. COBRA 2007-XX 1 Analysis of the Forces in the Exponentialoid Growth in Construction , 2007 .
[194] Weisheng Lu,et al. Competitiveness in construction: a critical review of research , 2007 .
[195] A. Dainty. Methodological pluralism in construction management research , 2008 .
[196] Yozo Fujino,et al. Shared computer-aided structural design model for construction industry (infrastructure) , 2008, Comput. Aided Des..
[197] R. M. Skitmore,et al. Prequalification and c-competitiveness , 1993 .
[198] Christine Pasquire,et al. Applying lean thinking in commercial management , 2011 .
[199] N. Leech,et al. On Becoming a Pragmatic Researcher: The Importance of Combining Quantitative and Qualitative Research Methodologies , 2005 .
[200] Thomas W. Malnight. The Transition from Decentralized to Network-Based MNC Structures: An Evolutionary Perspective , 1996 .
[201] Mehmet Fuat Hergunsel. Benefits of Building Information Modeling for Construction Managers and BIM Based Scheduling , 2011 .
[202] Liu Mao,et al. Analysis of trample disaster and a case study – Mihong bridge fatality in China in 2004 , 2008 .
[203] Jui-Sheng Chou,et al. Cost simulation in an item-based project involving construction engineering and management , 2011 .
[204] Edward J. Jaselskis,et al. PILOT STUDY ON IMPROVING THE EFFICIENCY OF TRANSPORTATION PROJECTS USING LASER SCANNING , 2003 .
[205] Robert M. Stark. UNBALANCED BIDDING MODELS - THEORY , 1968 .
[206] Albert P.C. Chan. Time–cost relationship of public sector projects in Malaysia , 2001 .
[207] Min-Yuan Cheng,et al. Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry , 2010, Expert Syst. Appl..
[208] Ka Chi Lam,et al. The predictive ability of Bromilow's timecost model , 2001 .
[209] Yash P. Gupta,et al. Forecasting of working-capital requirements under capital constraints — A Monte Carlo simulation approach , 1984 .
[210] H. van Meerveld. Reflections on estimating : the effects of project complexity and the use of BIM on the estimating process , 2009 .
[211] Andrew D.F. Price,et al. Modelling global risk factors affecting construction cost performance , 2003 .
[212] Lamine Mahdjoubi,et al. SPATIAL VISUALIZATION OF BUILDING COMPONENTS , 2005 .
[213] Michel Thiollent,et al. Action Research and Participatory Research: An Overview , 2011 .
[214] Martin Fischer. Applications of BIM and Hurdles for Widespread Adoption of BIM 2007 AISC-ACCL eConstruction Roundtable Event Report , 2008 .
[215] Robin Drogemuller. CAN B.I.M BE CIVIL , 2009 .
[216] Miroslaw J. Skibniewski,et al. Object-oriented modeling of construction processes by unified modeling language , 2004 .
[217] S. T Ng,et al. Client and consultant perspectives of prequalification criteria , 1999 .
[218] Susan Bergsten. Using 4D CAD in the Design and Management of Vertical Extensions to Existing Buildings , 2008 .
[219] Leonas Ustinovichius,et al. Classification of the Investment Risk in Construction , 2007, CDVE.
[220] Mohammed Abdel Razek,et al. A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt , 2011, ArXiv.
[221] David B. Ashley,et al. Improved conceptual estimating performance using a knowledge-based approach , 1990 .
[222] Andrew P. Witkin,et al. Free-form shape design using triangulated surfaces , 1994, SIGGRAPH.
[223] James E. Diekmann,et al. Coping with Uncertainty in Unit Price Contracting , 1982 .
[224] Min-Yuan Cheng,et al. Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model , 2009 .
[225] Morten T. Hansen,et al. Knowledge Transfer in Intraorganizational Networks : Effects of Network Position and Absorptive Capacity on Business Unit Innovation and Performance , 2007 .
[226] David Heesom,et al. Trends of 4D CAD applications for construction planning , 2004 .
[227] Bilal Succar,et al. The Five Components of BIM Performance Measurement , 2010 .
[228] P. Lam,et al. A Comparative Study of the Benefits of Applying Target Cost Contracts between South Australia and Hong Kong , 2012 .
[229] Tom Ritchey,et al. Analysis and synthesis: On scientific method – based on a study by bernhard riemann , 1991 .
[230] Anoop Sattineni,et al. Estimating with BIM: A Survey of US Construction Companies , 2011 .
[231] R. Teare,et al. A systems model of effective teamwork , 1997 .
[232] Martin Skitmore,et al. Project management turnover: causes and effects on project performance , 2005 .
[233] Ling Qin,et al. Industry foundation classes based integration of architectural design and structural analysis , 2011 .
[234] Wanda J. Orlikowski,et al. Information Technology and the Structuring of Organizations , 2011 .
[235] Martin Skitmore,et al. The integration between design and maintenance of office building automation : a decision support approach , 2003 .
[236] David Vose,et al. Quantitative Risk Analysis: A Guide to Monte Carlo Simulation Modelling , 1996 .
[237] Paul Teicholz,et al. Pre-Estimate Cash Flow Analysis , 1977 .
[238] K. Brazil,et al. Revisiting the Quantitative-Qualitative Debate: Implications for Mixed-Methods Research , 2002, Quality & quantity.
[239] Zijia Liu. Feasibility Analysis of BIM Based Information System for Facility Management at WPI , 2010 .
[240] Adekunle Sabitu Oyegoke,et al. Specialist task organisations procurement approach for re-engineering construction project processes , 2007 .
[241] Yacine Rezgui,et al. Computer integrated construction: A review and proposals for future direction , 2007, Adv. Eng. Softw..
[242] Ekambaram Palaneeswaran,et al. Recent advances and proposed improvements in contractor prequalification methodologies , 2001 .
[243] John Mingers,et al. Combining IS Research Methods: Towards a Pluralist Methodology , 2001, Inf. Syst. Res..
[244] Martin Fischer,et al. Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .
[245] N. Saraçoğlu. Changing power balance in matrix organizations , 2009 .
[246] Konstantinos P. Anagnostopoulos,et al. An AHP model for construction contractor prequalification , 2006, Oper. Res..
[247] Ayodeji Emmanuel Oke,et al. AN EXAMINATION OF PROJECT MANAGEMENT LEADERSHIP STYLES OF NIGERIAN QUANTITY SURVEYORS , 2010 .
[248] Tapio Niemi. Methods for Logical OLAP Design , 2001 .
[249] F. J. Newland,et al. A study of solar radiation models for the coastal region of South China , 1989 .
[250] Salman T. Al-Sedairy. A change management model for Saudi construction industry , 2001 .
[251] Owen D. Wilson,et al. A construction project cash flow model—an idiographic approach , 1986 .
[252] Brian Eggleston,et al. The NEC 3 Engineering and Construction Contract , 2006 .
[253] Terry Lyons,et al. Project risk management in the Queensland engineering construction industry : a survey , 2004 .
[254] Simon Smith,et al. Stochastic analysis of cyclic construction processes , 1998 .
[255] Zayyana Shehu,et al. Construction programme management theory and practice: Contextual and pragmatic approach , 2009 .
[256] Alan Griffith. Integrated management systems: a single management system solution for project control? , 2000 .
[257] Tamara Munzner,et al. A Nested Model for Visualization Design and Validation , 2009, IEEE Transactions on Visualization and Computer Graphics.
[258] R. Hack,et al. Evaluation , and management of unstable rock slopes by 3-D laser scanning , 2006 .
[259] Henry Odeyinka,et al. An Analysis of the Impacts of Risks and Uncertainties on Construction Cash Flow Forecast , 2001 .
[260] S. Thomas Ng,et al. Forecast models for actual construction time and cost , 2003 .
[261] Mario Piattini,et al. Data Model Metrics , 2002 .
[262] Hamideh Afsarmanesh,et al. Collaborative networked organizations - Concepts and practice in manufacturing enterprises , 2009, Comput. Ind. Eng..
[263] Nigel Fielding,et al. Triangulation and Mixed Methods Designs , 2012 .
[264] Koleola T. Odusami,et al. Factors Affecting the Accuracy of a Pre-Tender Cost Estimate in Nigeria , 2008 .
[265] Juan David García Bacca. De magia a técnica: ensayo de teatro filosófico-literario-técnico , 1989 .
[266] Maged Georgy,et al. Using genetic algorithms in optimizing construction material delivery schedules , 2008 .
[267] Kees Dorst. Building for the visual age , 2007 .
[268] Aminah Robinson Fayek,et al. A decision support system for contractor prequalification for surety bonding , 2012 .
[269] Robert A. Burgelman. A Model of the Interaction of Strategic Behavior, Corporate Context, and the Concept of Strategy , 1983 .
[270] Xinping Liu,et al. Equitable financial evaluation method for public-private partnership projects , 2008 .
[271] Tao-chiu Kenny Tse,et al. The utilisation of building information models in nD modelling: A study of data interfacing and adoption barriers , 2005, J. Inf. Technol. Constr..
[272] M Skitmore. Graphical method for identifying high outliers in construction contract auctions , 2001, J. Oper. Res. Soc..
[273] Essam Shehab,et al. An Intelligent Knowledge-Based System for Product Cost Modelling , 2002 .
[274] David G. Woodward,et al. Life cycle costing—Theory, information acquisition and application , 1997 .
[275] Linqin Cai,et al. Risk behavior simulation in virtual environment , 2010, 2010 3rd International Conference on Computer Science and Information Technology.
[276] John E. Taylor,et al. Integrating Agent-Based Simulation with Game Theory to Investigate the Hold-Up Problem in Project Networks , 2009 .
[277] J. Ivey. Focus groups. , 2011, Pediatric nursing.
[278] Brian Graham,et al. AN ACTION RESEARCH APPROACH TO SHARING SPECIALIST CONSTRUCTION KNOWLEDGE , 2008 .
[279] S. Elmaghraby,et al. Optimal Time-Cost Trade-Offs in GERT Networks , 1972 .
[280] M. Skitmore,et al. Subjective and objective stress in construction cost estimation , 2007 .
[281] Mansour Nasser Jadid,et al. Cost estimation of structural skeleton using an interactive automation algorithm: A conceptual approach , 2007 .
[282] Yang Zhu,et al. Project Finance in Construction: A Structured Guide to Assessment , 2010 .
[283] H. Ashcraft. Building Information Modeling : A Framework for Collaboration , 2008 .
[284] Carlos Balaguer,et al. Trends in Robotics and Automation in Construction , 2008 .
[285] M. Oostra. Building manufacturing architecture. Whatever you thought, think again , 2007 .
[286] Steven C. Currall,et al. Combining Qualitative and Quantitative Methodologies to Study Group Processes:An Illustrative Study of Acorporate Board of Directors , 1999 .
[287] Robert Amor,et al. Misconceptions About Integrated Project Databases , 2001, J. Inf. Technol. Constr..
[288] Karen E. Watkins,et al. The construct of the learning organization: Dimensions, measurement, and validation , 2004 .
[289] James C. Taylor,et al. Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline , 2007 .
[290] Darius Migilinskas,et al. The use of a virtual building design and construction model for developing an effective project concept in 5D environment , 2010 .
[291] Giovanna Sansoni,et al. State-of-The-Art and Applications of 3D Imaging Sensors in Industry, Cultural Heritage, Medicine, and Criminal Investigation , 2009, Sensors.
[292] Karen Manley,et al. The quantity surveyor’s role in innovation generation, adoption and diffusion in the Australian construction industry , 2005 .
[293] David Scott. Web-based construction information management systems , 2003 .
[294] Vishal Singh,et al. Building information modelling : an issue of adoption and change management , 2007 .
[295] Anoop Sattenini,et al. Preparing A Buindling Information Model For Facility Maintenance And Management , 2011 .
[296] J. S. Kim,et al. Effectiveness of OLAP-based cost data management in construction cost estimate , 2007 .
[297] Willy Sher,et al. Modelling outcomes of collaboration in building information modelling through gaming theory lenses , 2010 .
[298] Akintola Akintoye,et al. Macro models of UK construction contract prices , 1993 .
[299] Jun Miura,et al. Collaboration work for nuclear power building using 3D CAD information , 2006 .
[300] Antony W. Pelosi. ARCHITECTURAL HYPER-MODEL: CHANGING ARCHITECTURAL CONSTRUCTION DOCUMENTATION , 2007 .
[301] Lyman W. Porter,et al. Factors Affecting the Context for Motivation in Public Organizations1 , 1982 .
[302] A. Kaka,et al. Review of Unbalanced Bidding Models in Construction , 2007 .
[303] Martin Betts. Methods and data used by large building contractors in preparing tenders , 1990 .
[304] Ogunsemi,et al. The impact of building information modelling system on construction cost estimating , 2010 .
[305] Joy A. Frechtling,et al. Characteristics of the Discussion in Online and Face-to-Face Focus Groups , 2002 .
[306] Stephen Olu Ogunlana. Accuracy in design cost estimating , 1989 .
[307] Erik Brynjolfsson,et al. The Matrix of Change: A Tool for Business Process Reengineering , 1996 .
[308] Peter Samuel Jensen. The Use of Building Information Modeling in Generating Hard Bid Estimates , 2010 .
[309] Stuart D. Green,et al. Tendering: optimization and rationality , 1989 .
[310] Katharina J. Srnka,et al. From Words to Numbers: How to Transform Qualitative Data into Meaningful Quantitative Results , 2007 .
[311] Keith Hogg,et al. Willis's Practice and Procedure for the Quantity Surveyor , 2002 .
[312] Peter E.D. Love,et al. Stakeholder Management during Project Inception: Strategic Needs Analysis , 2004 .
[313] Robert M. Stark,et al. Some Multi-Contract Decision-Theoretic Competitive Bidding Models , 1971, Oper. Res..
[314] N. Ellemers,et al. SOCIAL IDENTITY IN INDUSTRIAL AND ORGANIZATIONAL PSYCHOLOGY: CONCEPTS, CONTROVERSIES AND CONTRIBUTIONS , 2006 .
[315] Albert Boonstra,et al. Essential competencies for technochange management: Towards an assessment model , 2009, Int. J. Inf. Manag..
[316] Thomas S. Ng,et al. CP-DSS: Decision support system for contractor prequalification , 1995 .
[317] Y. Arayici,et al. Digital Construction through BIM Systems will Drive the Re-engineering of Construction Business Practices , 2008, 2008 International Conference Visualisation.
[318] A. Onwuegbuzie,et al. Mixed Methods Research: A Research Paradigm Whose Time Has Come , 2004 .
[319] Simon A. Burtonshaw-Gunn and Bob Ritchie. Developments in construction supply chain management: The impact on people and cultural change , 2007 .
[320] Dominic Holzer,et al. ARE YOU TALKING TO ME? WHY BIM ALONE IS NOT THE ANSWER , 2007 .
[321] Ghassan Aouad,et al. Investigating the Role of Building Information Models as a Part of an Integrated Data Layer: A Fire Response Management Case , 2007 .
[322] Ellen Yi-Luen Do,et al. Collaboration and coordination in architectural design: approaches to computer mediated team work , 1998 .
[323] Kwong Wing Chau,et al. Monte Carlo simulation of construction costs using subjective data , 1995 .
[324] Russell Kenley. The predictive ability of Bromilow's timecost model: a comment , 2001 .
[325] Leman Figen Gül,et al. Virtual worlds as a constructivist learning platform: evaluations of 3D virtual worlds on design teaching and learning , 2008, J. Inf. Technol. Constr..
[326] Martin Skitmore,et al. Analytical and Approximate Variance of Total Project Cost , 2002 .
[327] Norma G. Sutcliffe,et al. Leadership behavior and business process reengineering (BPR) outcomes: An empirical analysis of 30 BPR projects , 1999, Inf. Manag..
[328] Roger Flanagan,et al. Life cycle costing and risk management , 1987 .
[329] Lilia Gzara,et al. Towards a knowledge repository for collaborative design process: focus on conflict management , 2004, Comput. Ind..
[330] Steven J. Peterson. Construction Accounting and Financial Management , 2004 .
[331] G. Singh,et al. The development of a rational bill of quantities , 1990 .
[332] E. Mishler. Validation in Inquiry-Guided Research: The Role of Exemplars in Narrative Studies , 1990 .
[333] John A. A. Sillince,et al. Organizational Context and the Discursive Construction of Organizing , 2007 .
[334] J.S. Carson,et al. Model verification and validation , 2002, Proceedings of the Winter Simulation Conference.
[335] Massimiliano Lo Turco,et al. BIM Use in the Construction Process , 2009, 2009 International Conference on Management and Service Science.
[336] U. Flick,et al. “I Can’t Prescribe Something Just Because Someone Asks for It . . .” , 2012 .
[337] G. E. Younis. Minimizing construction disputes , 2010 .
[338] Vivian W. Y Tam,et al. Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice , 2010 .
[339] Jeffrey S. Russell,et al. Long-Term Entropy and Profitability Change of United States Public Construction Firms , 2005 .
[340] D. Mudd,et al. Estimating and tendering for construction work , 1984 .
[341] Nashwan Dawood,et al. A structured methodology for enterprise modeling: a case study for modeling the operation of a british organization , 2011, J. Inf. Technol. Constr..
[342] Martin Skitmore,et al. Data Pooling for Early-Stage Price Forecasts , 2005 .
[343] S. Thomas Foster. An examination of the relationship between conformance and quality‐related costs , 1996 .
[344] D. Olson,et al. Circumplex Model VII: validation studies and FACES III. , 1986, Family process.
[345] Peter C. M. Molenaar,et al. The New Person-Specific Paradigm in Psychology , 2009 .
[346] Muzani Mustapa,et al. BILLS OF QUANTITIES - ARE THEY STILL USEFUL AND RELEVANT TODAY? , 2006 .
[347] Martin Skitmore,et al. The Use of Formal Project Management Processes in the Procurement of Queensland Aged Care Facilities , 2007 .
[348] Ghassan Aouad,et al. Rethinking construction: the Generic Design and Construction Process Protocol , 2000 .
[349] William C. Regli,et al. A Collaborative 3D Environment for Authoring Design Semantics , 2002, IEEE Computer Graphics and Applications.
[350] R. Mlinga,et al. Collaboration between formal and informal enterprises in the construction sector in Tanzania , 2002 .
[351] Peter E.D. Love,et al. Modelling the dynamics of design error induced rework in construction , 2000 .
[352] David A. Ameen. A computer assisted PERT simulation , 1987 .
[353] Kurt Lewin,et al. Resolving social conflicts : selected papers on group dynamics , 1948 .
[354] Ani Raiden,et al. Understanding employee resourcing in construction organizations , 2008 .
[355] Abid Nadeem,et al. Improving existing delay analysis techniques for the establishment of delay liabilities , 2004 .
[356] B. McKelvey. Guidelines for the Empirical Classification of Organizations. , 1975 .
[357] Eber A. Schmitz,et al. Structured construction and simulation of nondeterministic stochastic activity networks , 2009, Eur. J. Oper. Res..
[358] K. Runeson,et al. Methodology and method for price-level forecasting in the building industry , 1988 .
[359] Min-Yuan Cheng,et al. Construction management process reengineering: Organizational human resource planning for multiple projects , 2006 .
[360] Rogier Jongeling. A Process Model for Work-Flow Management in Construction , 2006 .
[361] Roland Wagner,et al. A VR based safety training in a petroleum refinery , 1999, Eurographics.
[362] I. Mitroff,et al. Organizational Symbolism: A Topic To Expand Organizational Analysis , 1980 .
[363] Stephan Klamert. Are construction cost escalations a natural law , 2011 .
[364] Darshana Sedera,et al. Does Size Matter ? Enterprise System Performance in Small , Medium and Large Organizations , 2008 .
[365] Scott Moss,et al. Alternative Approaches to the Empirical Validation of Agent-Based Models , 2007, J. Artif. Soc. Soc. Simul..
[366] Michael Spearpoint,et al. Sharing fire engineering simulation data using the IFC building information model , 2007 .
[367] Jason Underwood,et al. Going BIM in a commercial world , 2008 .
[368] Martin Skitmore,et al. Estimating processes of smaller builders , 1994 .
[369] P. Bazeley. Issues in Mixing Qualitative and Quantitative Approaches to Research , 2004 .
[370] David J. Edwards,et al. Modelling the magnitude of plant downtime: a tool for improving plant operations management , 2001 .
[371] Olubola Babalola,et al. An appraisal of the factors affecting production of cost estimate for electrical services in Nigeria , 2008 .
[372] L. Friedman. A Competitive-Bidding Strategy , 1956 .
[373] Chimay J. Anumba,et al. An integrated system for change management in construction , 2007 .
[374] Martin Skitmore,et al. The accuracy of construction price forecasts , 1990 .
[375] Stephen O. Ogunlana,et al. The nature of estimating accuracy: Developing correct associations , 1991 .
[376] Chung-Wei Feng,et al. An effective simulation mechanism for construction operations , 2003 .
[377] Ulf R. Andersson,et al. Balancing subsidiary influence in the federative MNC: a business network view , 2007 .
[378] A. I. Kovacs. Matrix Management , 1978 .
[379] Ricardo Jardim-Goncalves,et al. Challenging electronic procurement in the AEC sector: A BIM-based integrated perspective , 2011 .
[380] Ronald M. Harstad,et al. Modeling Competitive Bidding: A Critical Essay , 1994 .
[381] Robert Larsson,et al. ICT for whole life optimisation of residential buildings , 2007 .
[382] Koen Vanhoof,et al. A knowledge-based SWOT-analysis system as an instrument for strategic planning in small and medium sized enterprises , 1999, Decis. Support Syst..
[383] J. Poon,et al. Cross-cultural comparison of construction professionals' view on professional ethics , 2005 .
[384] Franco K.T. Cheung,et al. Application of cross validation techniques for modelling construction costs during the very early design stage , 2006 .
[385] Athman Bouguettaya,et al. Managing Changes to Virtual Enterprises on the Semantic Web , 2004, WISE.
[386] Amer Momani,et al. Material Handling Equipment Selection using Hybrid Monte Carlo Simulation and Analytic Hierarchy Process , 2011 .
[387] J. Davidson Frame,et al. The New Project Management: Tools for an Age of Rapid Change, Complexity, and Other Business Realities , 1994 .
[388] Anthony Williams,et al. A proposed framework to investigate building information modelling through knowledge elicitation and visual models , 2007 .
[389] David Lowe,et al. Experiential learning in cost estimating , 1994 .
[390] Tim Cornick,et al. A study of the contractor's quantity surveying practice during the construction process , 1994 .
[391] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[392] S. Hesse-Biber,et al. Triangulation and Mixed Methods Research , 2012 .
[393] Ho Man-Fong Christabel,et al. Quantity surveyors' background and training, and their ethical concepts, conceptions and interests considerations , 2003 .
[394] Jeffrey S. Russell,et al. Cash Flow Forecasting Model for General Contractors Using Moving Weights of Cost Categories , 2005 .
[395] Simon Smith,et al. A new earthworks estimating methodology , 2000 .
[396] Simon Guy,et al. Making morality: sustainable architecture and the pragmatic imagination , 2010 .
[397] Narendra Shriniwas Nigudkar. Effectiveness of 4D construction modeling in detecting time-space conflicts of construction sites , 2005 .
[398] Willy Sher,et al. The applications of building information modelling in facilities management , 2010 .
[399] K. Howe,et al. Mixed Methods, Triangulation, and Causal Explanation , 2012 .
[400] Toni E Farah. Review of Current Estimating Capabilities of the 3d Building Information Model Software to Support Design for Production/Construction , 2005 .
[401] Zakaria Harun,et al. Cost Analysis and Formulation of Cost Models for Two-Storey Buildings Construction in Malaysia , 2000 .
[402] William J. Cosgrove. Simplifying PERT Network Simulation with ARENA , 2008 .
[403] Tahir Celik,et al. Knowledge based-system for alternative design, cost estimating and scheduling , 2002, Knowl. Based Syst..
[404] Clayton Reeser,et al. Some Potential Human Problems of the Project Form of Organization , 1969 .
[405] Angela Lee,et al. A roadmap for nD-enabled construction , 2006 .
[406] Symeon E. Christodoulou,et al. A bid‐unbalancing method for lowering a contractor's financial risk , 2008 .
[407] Zedan Hatush,et al. Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .
[408] Randall Deutsch,et al. BIM and Integrated Design: Strategies for Architectural Practice , 2011 .
[409] Thomas Froese,et al. PRACTICE NOTE Building information modelling demystified: does it make business sense to adopt BIM? , 2009, ICIT 2008.
[410] David A. Hensher,et al. Transacting under a performance-based contract: The role of negotiation and competitive tendering , 2007 .
[411] Gilbert A. Churchill. A Paradigm for Developing Better Measures of Marketing Constructs , 1979 .
[412] N. Ankrah,et al. Construction Cost Management: Learning from Case Studies , 2008 .
[413] Akintola Akintoye,et al. An analysis of success factors and benefits of partnering in construction , 2000 .
[414] Mohan Siriwardena,et al. Construction cost management: An analytical taxonomy for critical literature review , 2010 .
[415] Raymond C. Miller,et al. On Becoming a Social Scientist by Shulamit Reinharz: A Critical Review , 1984 .
[416] Henry Mintzberg,et al. Structure in 5's: A Synthesis of the Research on Organization Design , 1980, Management Science.
[417] Anthony Mills,et al. A needs based methodology for classifying construction clients and selecting contractors : comment , 1999 .
[418] Ammar Peter Kaka. Contractors’ financial budgeting using computer simulation , 1994 .
[419] H-J. Son,et al. An integrated system for automated construction progress visualization using IFC-Based BIM , 2012 .
[420] Mary Lou Maher,et al. Dynamic Designs of 3D Virtual Worlds Using Generative Design Agents , 2005 .
[421] Paul. Olomolaiye,et al. Attributes of UK construction clients influencing project consultants' performance , 1994 .
[422] Young Hoon Kwak,et al. Conceptual estimating tool for technology-driven projects: exploring parametric estimating technique , 2005 .
[423] Sheryl Staub-French,et al. Practical and Research Issues in using Industry Foundation Classes for Construction Cost Estimating , 2000 .
[424] Alberto Raposo,et al. AUGMENTED REALITY TO AID CONSTRUCTION MANAGEMENT , 2007 .
[425] Tarek M Hegazy. Integrated bid preparation with emphases on risk assessment using neural networks , 1993 .
[426] Martin Skitmore,et al. Pricing construction work: a marketing viewpoint , 2007 .
[427] Robert Woodbury,et al. Visual sensitivity analysis of parametric design models: Improving agility in design , 2009 .
[428] Blake Ives,et al. The Global Network Organization of the Future: Information Management Opportunities and Challenges , 1994, J. Manag. Inf. Syst..
[429] Martin Skitmore,et al. Developments in contract price forecasting and bidding techniques , 1990 .
[430] D. S. Thorpe,et al. Responding to global issues: sustainability and innovation in the Australian SME residential building construction sector , 2007 .
[431] Willy Sher,et al. Building information modeling and quantity surveying practice , 2010 .
[432] Zeljko Popovic. Implementation of data mining techniques in construction estimating , 2004, Neural Parallel Sci. Comput..
[433] Hannu Penttilä,et al. Describing the changes in architectural information technology to understand design complexity and free-form architectural expression , 2006, J. Inf. Technol. Constr..
[434] F. F. Ng,et al. A FRAMEWORK FOR INTELLIGENT CHANGE MANAGEMENT IN THE CONSTRUCTION PROCESS , 2004 .
[435] Rudolf Kruse,et al. Fuzzy neural network , 2008, Scholarpedia.
[436] Df Cooper,et al. Risk analysis of a construction cost estimate , 1985 .
[437] Martin Skitmore,et al. Construction virtual prototyping : a survey of use , 2009 .
[438] Kevan Buckley,et al. A decision support tool for the valuation of variations on civil engineering projects , 2005 .
[439] Mohammed Abdullah Eben Saleh. Automation of Quantity Surveying in Construction Projects , 1999 .
[440] Argia M. Sbordone. Prices and unit labor costs: a new test of price stickiness $ , 2002 .
[441] Ming Sun,et al. A change management maturity model for construction projects , 2009 .
[442] George Ofori,et al. New Aspects of Quantity Surveying Practice , 2012 .
[443] Paul Bowen,et al. Value management practice by South African quantity surveyors , 2010 .
[444] Ka Erlaluopeizidepuertuo,et al. Enhancing SafEty throughout conStruction uSing BiM/VDc , 2012 .
[445] Aj Marshall-Ponting,et al. An nD modelling approach to improve communication processes for construction , 2005 .
[446] Franco K.T. Cheung,et al. Refinement of Storey Enclosure Forecasting Method , 2005 .
[447] Thomas H. Kolbe,et al. Conceptual Requirements for the Automatic Reconstruction of Building Information Models from Uninterpreted 3D Models , 2009 .
[448] Roger Flanagan,et al. Whole Life Appraisal for Construction , 2005 .
[449] William R. Sherman,et al. Understanding Virtual RealityInterface, Application, and Design , 2002, Presence: Teleoperators & Virtual Environments.
[450] Ramón Queraltó. Technology As a New Condition of the Possibility of Scientific Knowledge , 1998 .
[451] J. Poon,et al. Professional ethics for surveyors and construction project performance: what we need to know , 2003 .
[452] Brodie McAdam,et al. Building information modelling: the UK legal context , 2010 .
[453] Konstantinos Nasios,et al. Improving chemical plant safety training using virtual reality , 2002 .
[454] Richard Kirkham,et al. Re‐engineering the whole life cycle costing process , 2005 .
[455] P. Luciani,et al. An investigation into the cycle and prediction of organisation facility management procurement , 2007 .
[456] D. Gann,et al. Innovation in project-based, service-enhanced firms: the construction of complex products and systems , 2000 .
[457] M. Gates. Bidding Strategies and Probabilities , 1967 .
[458] James T. O'Connor,et al. Optimizing Implementation of Value Management Processes for Capital Projects , 2005 .
[459] Elcin Tas,et al. A building cost estimation model based on functional elements , 2007 .
[460] John Mitchell,et al. Collaborative design using a shared IFC building model—Learning from experience , 2007 .
[461] P. Liston,et al. Contract costing in outsourcing enterprises: Exploring the benefits of discrete-event simulation , 2007 .
[462] Mike Kagioglou,et al. Application of Lean Construction Principles in Product Development Process Modelling , 2003 .
[463] Yong K. Cho,et al. BIM-Driven Economic Analysis for Zero Net Energy Test Home , 2010 .
[464] D. J. Rasbash. Major fire disasters involving flashover , 1991 .
[465] Martin Skitmore,et al. Decision Support System for Construction Prequalification , 1994 .
[466] James M. Utterback,et al. A dynamic model of process and product innovation , 1975 .
[467] Martin Skitmore,et al. Marketing and pricing strategy , 2009 .
[468] P. G. Ioannou. Bidding Models — Symmetry and State of Information , 1988 .
[469] Yimin Zhu,et al. Applying metadata models to unstructured content of construction documents: A view-based approach , 2007 .
[470] Anthony N. Pettitt,et al. Gates' bidding model , 2007 .
[471] Yusuf Arayici,et al. Building information modelling (BIM) implementation and remote construction projects: Issues, Challenges and Critiques , 2012, J. Inf. Technol. Constr..
[472] William A. Donaldson. The Estimation of the Mean and Variance of a PERT Activity Time , 1965 .
[473] S. Albers,et al. Crisis Construction and Organizational Learning: Capability Building in Catching-Up at Hyundai Motor , 1998 .
[474] Zahir Irani,et al. An exploratory study of information technology evaluation and benefits management practices of SMEs in the construction industry , 2004, Inf. Manag..
[475] Martin Skitmore,et al. The effect of client and type and size of construction work on a contractor's bidding strategy , 2001 .
[476] Martin Skitmore,et al. First and second price independent values sealed bid procurement auctions: some scalar equilibrium results , 2008 .
[477] Simone Clemhout. The Impact of Housing Cyclicality on the Construction of Residential Units and Housing Costs , 1981 .
[478] Bo-Christer Björk,et al. A model integrating the facilities management process with the building end user’s business process (ProFacil) , 2004 .
[479] Daniel W. Halpin,et al. Simulation experiment for improving construction processes , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..
[480] I. O. Aje,et al. A model for contractors’ selection in Nigeria , 2006 .
[481] Hugo Priemus,et al. Dutch contracting fraud and governance issues , 2004 .
[482] Jane Hunter,et al. Scientific Models: A User-oriented Approach to the Integration of Scientific Data and Digital Libraries , 2006 .
[483] A. H. Christer,et al. O.R. modelling of the deterioration and maintenance of concrete structures , 1997 .
[484] Ashraf El-Hamalawi,et al. An XML based standard to enable bulk project data transfer between heterogeneous systems , 2008, J. Inf. Technol. Constr..
[485] Colin Sharp. Qualitative Research and Evaluation Methods (3rd ed.) , 2003 .
[486] Oluwole Alfred Olatunji,et al. Modelling organizations' structural adjustment to BIM adoption: a pilot study on estimating organizations , 2011, J. Inf. Technol. Constr..
[487] Edward A. Lee. Cyber Physical Systems: Design Challenges , 2008, 2008 11th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC).
[488] Chris I. Goodier,et al. The futures of construction: a critical review of construction future studies , 2007 .