The impact of building information modelling on estimating practice: analysis of perspectives from four organizational business models

............................................................................................................ xi SUPPORTING PUBLICATIONS (SELECTED) .................................................. xiii GLOSSARY........................................................................................................... xvi

[1]  Markus König,et al.  Visual Simulation - An Appropriate Approach to Support Execution Planning in Building Engineering , 2007 .

[2]  David Lowe,et al.  Human effects in construction contract price forecasting: Experience and experiential learning styles , 2001 .

[3]  Tao-chiu Tse The interoperability of building information models and document models in the Hong Kong construction industry , 2009 .

[4]  Franco K.T. Cheung,et al.  A study of clients' and estimators' tolerance towards estimating errors , 2008 .

[5]  Terje Aven,et al.  Foundations of risk analysis : a knowledge and decision-oriented perspective , 2003 .

[6]  Shu-Shun Liu,et al.  Resource-constrained construction project scheduling model for profit maximization considering cash flow , 2008 .

[7]  Frank Bomarius,et al.  COBRA: a hybrid method for software cost estimation, benchmarking, and risk assessment , 1998, Proceedings of the 20th International Conference on Software Engineering.

[8]  D. Nicholls,et al.  Qualitative research. Part 1: Philosophies , 2009 .

[9]  Salman Azhar,et al.  BIM for Sustainability Analyses , 2009 .

[10]  John Messner,et al.  Comparing traditional schematic design documentation to a schematic building information model , 2007 .

[11]  A. C. Williams,et al.  On Competitive Bidding , 1975, Oper. Res..

[12]  G. Elwyn,et al.  Towards a feasible model for shared decision making: focus group study with general practice registrars , 1999, BMJ.

[13]  G. Runeson,et al.  Pre-tender and post-tender negotiations in Australia , 1984 .

[14]  Y. Engeström,et al.  Perspectives on activity theory: Innovative learning in work teams: Analyzing cycles of knowledge creation in practice , 1999 .

[15]  G. B. Swartz,et al.  Estimation of Weibull Parameters from Two‐Order Statistics , 1975 .

[16]  R. Galliers Strategic information systems planning: myths, reality and guidelines for successful implementation , 1991 .

[17]  David Mills Least‐Cost Planning and Electricity Industry Reform in Australia , 2001 .

[18]  Jordi Comas,et al.  Connecting Knowledge Management and Experiential Learning to Gain New Insights and Research Perspectives , 2001, ECIS.

[19]  D. Buchanan,et al.  No Going Back: A Review of the Literature on Sustaining Organizational Change , 2005 .

[20]  Alfred E. Thal,et al.  Estimation of Cost Contingency for Air Force Construction Projects , 2010 .

[21]  Richard J. Smith,et al.  Estimating local Lyapunov exponents , 1997 .

[22]  Kenneth Lieberthal Governing China: From Revolution Through Reform , 1995 .

[23]  Michael Rosemann,et al.  Integrated Process Modeling: An Ontological Evaluation , 2000, Inf. Syst..

[24]  David M. Dilts,et al.  Automated design-to-cost: integrating costing into the design decision , 1996, Comput. Aided Des..

[25]  John Haymaker,et al.  Multidisciplinary process integration and design optimization of a classroom building , 2009, J. Inf. Technol. Constr..

[26]  Angela Lee,et al.  Developing a vision for an nD modelling tool , 2002 .

[27]  Ming Sun,et al.  Cost and time control of construction projects: inhibiting factors and mitigating measures in practice , 2010 .

[28]  Anthony Speaight,et al.  Architect's Legal Handbook: The Law for Architects , 2014 .

[29]  Roger Flanagan,et al.  The accuracy and monitoring of quantity surveyors' price forecasting for building work , 1983 .

[30]  Abbas Afshar,et al.  A min-max regret approach to unbalanced bidding in construction , 2010 .

[31]  Amarjit Singh,et al.  Studies on the impact of functional analysis concept design on reduction in change orders , 1999 .

[32]  Mahmoud R. Halfawy Integration of data and processes of AEC projects using the industry foundation classes , 2005 .

[33]  Martin Skitmore,et al.  A Multivariate Approach to Construction Contract Bidding Mark-up Strategies , 1994 .

[34]  Willy Sher,et al.  Measuring BIM performance: Five metrics , 2012 .

[35]  W. G. Hunter,et al.  Experimental Design: Review and Comment , 1984 .

[36]  Sten Bonke,et al.  Changes in the Danish construction sector: the need for a new focus , 2005 .

[37]  David Baccarini,et al.  The Use of Bills of Quantities in Construction Projects - An Australian Survey , 2004 .

[38]  Tong Yizhe,et al.  Unbalanced bidding on contracts with variation trends in client-provided quantities , 1992 .

[39]  Symeon E. Christodoulou Bid mark‐up selection using artificial neural networks and an entropy metric , 2010 .

[40]  H. A. Lingstone,et al.  The Delphi Method: Techniques and Applications , 1976 .

[41]  Thomas Becker,et al.  Integrated 3D Modeling of Multi-utility Networks and Their Interdependencies for Critical Infrastructure Analysis , 2011 .

[42]  R. Nkado,et al.  COMPETENCIES REQUIRED BY QUANTITY SURVEYORS IN SOUTH AFRICA , 2005 .

[43]  Theo Haupt,et al.  Construction cost variability: does it really matter? An exploratory study , 2008 .

[44]  Wen‐Hsien Tsai,et al.  Quality cost measurement under activity‐based costing , 1998 .

[45]  Shlomo Selinger,et al.  Computerized method for quantity surveying , 1983 .

[46]  Charles M. Eastman,et al.  A database architecture for design collaboration , 1998 .

[47]  L. Swaffield,et al.  The contractor's use of life cycle costing on PFI projects , 2008 .

[48]  A. McAloon,et al.  A process model to estimate biodiesel production costs. , 2006, Bioresource technology.

[49]  Michael Hoxley The fee tendering and service quality issue revisited , 2007 .

[50]  Andries G. Doree,et al.  Collusion in the Dutch construction industry: An industrial organization perspective , 2004 .

[51]  R. E. Miles,et al.  Causes of Failure in Network Organizations , 1992 .

[52]  Richard Fellows,et al.  Leadership style and power relations in quantity surveying in Hong Kong , 2003 .

[53]  Akintola Akintoye,et al.  A survey of current cost estimating practices in the UK , 2000 .

[54]  Sangyoon Chin,et al.  Automated Building Information Modeling System for Building Interior to Improve Productivity of BIM-based Quantity Take-Off , 2009 .

[55]  Reza Abbasnia,et al.  Optimization of uncertain construction time-cost trade-off problem , 2008 .

[56]  Oluwole Alfred Olatunji,et al.  Modelling the costs of corporate implementation of building information modelling , 2011 .

[57]  Ghang Lee,et al.  Editorial - Case studies of BIM in use , 2008, J. Inf. Technol. Constr..

[58]  Pak Yoong,et al.  Role of mobile technology in the construction industry - a case study , 2009, Int. J. Bus. Inf. Syst..

[59]  Akintola Akintoye,et al.  Pricing approaches in the construction industry , 1992 .

[60]  David Baccarini Understanding project cost contingency: A survey , 2005 .

[61]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[62]  Rafael Sacks,et al.  Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .

[63]  Yongsheng Ma,et al.  Parametric CAD/CAE integration using a common data model , 2011 .

[64]  A. Dainty,et al.  Synthesising emerging issues within key futures study reports in construction , 2006 .

[65]  John S. Gero,et al.  Comparing collaborative co-located and distributed design processes in digital and traditional sketching environments: A protocol study using the function-behaviour-structure coding scheme , 2011 .

[66]  D. R. Ogunsemi,et al.  Time‐cost model for building projects in Nigeria , 2006 .

[67]  Will Hughes,et al.  Understanding construction consortia: Theory, practice and opinions , 2006 .

[68]  Chaomei Chen,et al.  Top 10 Unsolved Information Visualization Problems , 2005, IEEE Computer Graphics and Applications.

[69]  Scott E. Maxwell,et al.  Designing Experiments and Analyzing Data , 1992 .

[70]  Peter Wynn Contracting for Engineering and Construction Projects , 2001 .

[71]  J. M. Daschbach,et al.  Design analysis through techniques of parametric cost estimation , 1988 .

[72]  Marvin Gates GATES' BIDDING MODEL--A MONTE CARLO EXPERIMENT , 1976 .

[73]  Oluwole Alfred Olatunji,et al.  A preliminary review on the legal implications of BIM and model ownership , 2011, J. Inf. Technol. Constr..

[74]  K. T. Odusami,et al.  Perceptions of Construction Professionals Concerning Important Skills of Effective Project Leaders , 2002 .

[75]  Zhi-Long Chen,et al.  A scenario-based stochastic programming approach for technology and capacity planning , 2002, Comput. Oper. Res..

[76]  Stephen L. Kajewski,et al.  ICT in the Australian Construction industry: Status, training and Perspectives , 2004 .

[77]  Javier Monedero,et al.  Parametric Design. A Review and Some Experiences , 2000, Proceedings of the 15th International Conference on Education and Research in Computer Aided Architectural Design in Europe (eCAADe).

[78]  Assem Al-Hajj,et al.  Modelling the running costs of buildings , 1998 .

[79]  Ali Mohammed Alashwal,et al.  Knowledge sharing in a fragmented construction industry: On the hindsight , 2011 .

[80]  Weisheng Lu,et al.  Optimizing construction planning schedules by virtual prototyping enabled resource analysis , 2009 .

[81]  Graham Ive,et al.  A survey of building price indices compiliation methods in Britain , 2006 .

[82]  Hugh Kutz A virtual success , 2006 .

[83]  W. A Bello,et al.  Project variables influencing contingency on construction contract in Nigeria , 2009 .

[84]  Carlos Torres Formoso,et al.  A model for integrating cost management and production planning and control in construction , 2006 .

[85]  Raja R. A. Issa,et al.  Quantitative evaluation of the BIM-assisted construction detailed cost estimates , 2010, J. Inf. Technol. Constr..

[86]  Phuwadol Samphaongoen,et al.  A Visual Approach to Construction Cost Estimating , 2010 .

[87]  Zayyana Shehu,et al.  Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis , 2010 .

[88]  Ruben de Laat,et al.  Integration of BIM and GIS: The Development of the CityGML GeoBIM Extension , 2011 .

[89]  E. Brynjolfsson,et al.  Beyond Computation: Information Technology, Organizational Transformation and Business Performance , 2000 .

[90]  Info Tech Requirements analysis report for transport estimation, preconstruction, construction, decision support and electronic bidding systems , 2009 .

[91]  Ljiljana Brankovic,et al.  BUILDING INFORMATION MODELLING PROJECT DECISION SUPPORT FRAMEWORK , 2008 .

[92]  A. Onwuegbuzie,et al.  Toward a Definition of Mixed Methods Research , 2007 .

[93]  Willy Sher,et al.  Artificial neural network for the selection of buildable structural systems , 2003 .

[94]  Lars Lindkvist,et al.  Project organization : Exploring its adaptation properties , 2008 .

[95]  Tomson Ogwang,et al.  The stochastic approach to price index numbers: An expository note , 1995 .

[96]  Sadi Assaf,et al.  The management of construction company overhead costs , 2001 .

[97]  Radhika Nagpal,et al.  Collective Construction Using Lego Robots , 2006, AAAI.

[98]  Martin Skitmore,et al.  Valuation accuracy and variation: a meta analysis , 2007 .

[99]  Ammar P. Kaka,et al.  The risks of unbalanced bidding , 2010 .

[100]  Matthew W. Sakal Project Alliancing: A Relational Contracting Mechanism for Dynamic Projects , 2005 .

[101]  Henry Odeyinka,et al.  Modelling risk impacts on the budgeted cost of traditionally procured building projects , 2007 .

[102]  David Lowe,et al.  Effective feedback and systematic reflection in design cost estimating , 1998 .

[103]  Tao-chiu Kenny Tse,et al.  A case study of the ISO13567 CAD layering standard for automated quantity measurement in Hong Kong , 2004, J. Inf. Technol. Constr..

[104]  Vishal Singh,et al.  Adopting building information modeling (BIM) as collaboration platform in the design industry , 2008 .

[105]  Angela Clarke,et al.  The development of a best practice model for change management , 1997 .

[106]  Ueli Rutishauser,et al.  Adaptive Building Automation A multi-Agent approach , 2002 .

[107]  John Whittaker,et al.  Managerial Judgement in a Competitive Bidding Model , 1973 .

[108]  Thayaparan Gajendran,et al.  Emerging ICT trends in construction project teams: a Delphi survey , 2009, J. Inf. Technol. Constr..

[109]  Roger J. Rezabek,et al.  Online Focus Groups: Electronic Discussions for Research , 2000 .

[110]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[111]  Turker Bayrak Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge , 2008 .

[112]  Martin Skitmore,et al.  The image of the construction industry: a cross sectional analysis , 1991 .

[113]  Terry Meyer,et al.  Competencies of professional quantity surveyors: A South African perspective , 2001 .

[114]  Ying Jiang,et al.  BIM IN 2007 - ARE WE THERE YET? , 2007 .

[115]  I-Tung Yang,et al.  Simulation-based estimation for correlated cost elements , 2005 .

[116]  Khaled Nassar Assessing Building Information Modeling Estimating Techniques Using Data from the Classroom , 2012 .

[117]  Abbas Tashakkori,et al.  Mixed Methodology: Combining Qualitative and Quantitative Approaches , 1998 .

[118]  Min-Yuan Cheng,et al.  Construction Conceptual Cost Estimates Using Support Vector Machine , 2005 .

[119]  Nancy L. Holland,et al.  Indirect Cost Categorization and Allocation by Construction Contractors , 1999 .

[120]  Marton Marosszeky,et al.  Managing subcontractor supply chain for quality in construction , 2006 .

[121]  Naomi Garnett,et al.  Project modelling in construction: --seeing is believing , 1997 .

[122]  Sai On Cheung,et al.  An integrated regression analysis and time series model for construction tender price index forecasting , 2004 .

[123]  Mustafa Alshawi,et al.  Data and process models for the integration of estimating and valuation , 1997 .

[124]  Radhika Nagpal,et al.  Three-Dimensional Construction with Mobile Robots and Modular Blocks , 2008, Int. J. Robotics Res..

[125]  Stephen L. Kajewski,et al.  Improving ICT Integration in Today's AEC Industry: Recommendations & Guidelines , 2001 .

[126]  K. Reeves,et al.  Construction business systems in Japan: general contractors and subcontractors , 2002 .

[127]  Eilif Hjelseth,et al.  OVERVIEW OF CONCEPTS FOR MODEL CHECKING , 2010 .

[128]  Frederic C. Jelen,et al.  Cost and Optimization Engineering , 1970 .

[129]  Peter Edwards,et al.  Risk and risk management in construction: a review and future directions for research , 1998 .

[130]  Rajkumar Roy,et al.  Evolutionary Optimization of Business Process Designs , 2007, Evolutionary Scheduling.

[131]  Osama Moselhi,et al.  Integrating automated data acquisition technologies for progress reporting of construction projects , 2009 .

[132]  Gary David Holt,et al.  Lowest price or value? Investigation of UK construction clients' tender selection process , 2000 .

[133]  Jennifer R. Walton,et al.  Improving Conceptual Estimating Methods Using Historical Cost Data , 1997 .

[134]  Remo Aslak Burkhard,et al.  Towards a Framework and a Model for Knowledge Visualization: Synergies Between Information and Knowledge Visualization , 2005, Knowledge and Information Visualization.

[135]  Kaichang Di,et al.  Rational Functions and Potential for Rigorous Sensor Model Recovery , 2003 .

[136]  Xinan Jiang,et al.  Developments in cost estimating and scheduling in BIM technology , 2011 .

[137]  Chris Baber,et al.  User evaluation of augmented reality systems , 2003, Proceedings on Seventh International Conference on Information Visualization, 2003. IV 2003..

[138]  David Arditi,et al.  Estimating system selection expert , 1991 .

[139]  Edward W. Davis,et al.  Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .

[140]  Symeon E. Christodoulou,et al.  Optimum Bid Markup Calculation Using Neurofuzzy Systems and Multidimensional Risk Analysis Algorithm , 2004 .

[141]  Soonhung Han,et al.  Repairing CAD model errors based on the design history , 2006, Comput. Aided Des..

[142]  William J. Trahant Managing the change process : a field book for change agents, consultants, team leaders, and reengineering managers , 2002 .

[143]  Dermott McMeel,et al.  Unstable Building: virtual environments and real relevance , 2011, J. Inf. Technol. Constr..

[144]  Rizal Sebastian,et al.  Changing roles of the clients, architects and contractors through BIM , 2011 .

[145]  Serge J. Belongie,et al.  Behavior recognition via sparse spatio-temporal features , 2005, 2005 IEEE International Workshop on Visual Surveillance and Performance Evaluation of Tracking and Surveillance.

[146]  Robert M. Stark,et al.  Unbalanced Highway Contract Tendering , 1974 .

[147]  James T. O'Connor,et al.  Preliminary Cost Estimates Using Probabilistic Simulation for Highway Bridge Replacement Projects , 2005 .

[148]  Bernd Heinrich,et al.  Automated Planning of Process Models: The Constructions of Exclusive Choices , 2009, ICIS.

[149]  Martin Skitmore Expenditure Flow Forecasting Models , 1993 .

[150]  Kevin J. Dooley,et al.  A Complex Adaptive Systems Model of Organization Change , 1997 .

[151]  R. Alan Bowman Developing activity duration specification limits for effective project control , 2006, Eur. J. Oper. Res..

[152]  Hisham M. Abdelsalam,et al.  Cost of quality in Dubai: An analytical case study of residential construction projects , 2009 .

[153]  Jennifer Whyte,et al.  Virtual Reality and the Built Environment , 2003, Presence: Teleoperators & Virtual Environments.

[154]  Eiichi Gotoh,et al.  CONSTRUCTION ENGINEERING AND MANAGEMENT , 1991 .

[155]  Y. Engeström,et al.  Studies of expansive learning: Foundations, findings and future challenges , 2010 .

[156]  Francis J. Bromilow The impact of inflation and industrial strife on the construction industry in Australia , 1981 .

[157]  A. A. Ondar,et al.  Graphical method for planning and managing the estimated cost of scientific-research and experimental operations , 1973 .

[158]  Keith Collier Fundamentals of construction estimating and cost accounting , 1974 .

[159]  Kwaku A Tenah Management level as defined and applied within a construction organization by some US contractors and engineers , 1986 .

[160]  Chimay J. Anumba Functional integration in CAD systems , 1996 .

[161]  Oluwole Alfred Olatunji BIM adoption: a conceptual model for managing practice changes in estimating organizations , 2010 .

[162]  Kin Keung Lai,et al.  A general multivariate analysis approach for determining bid mark‐up strategy , 2005 .

[163]  Joseph Ahn,et al.  Military Facility Cost Estimation System Using Case-Based Reasoning in Korea , 2011, J. Comput. Civ. Eng..

[164]  John M. Kamara,et al.  Capturing client requirements in construction projects , 2002 .

[165]  Richard Fellows,et al.  Behaviour of quantity surveyors as organizational citizens , 2008 .

[166]  R. Kennedy,et al.  RE-ENGINEERING THE CONSTRUCTION DELIVERY PROCESS , 2001 .

[167]  Gert-Jan de Vreede,et al.  Collaborative Business Engineering with Animated Electronic Meetings , 1997, J. Manag. Inf. Syst..

[168]  Håkan Norberg,et al.  On-site production synchronisation : improving the resource-flow in construction projects , 2008 .

[169]  Robert Owen,et al.  Interaction of Lean and Building Information Modeling in Construction , 2010 .

[170]  Jaewook Lee,et al.  Conflict resolution in multi-agent based Intelligent Environments , 2010 .

[171]  P Garside,et al.  Organisational context for quality: lessons from the fields of organisational development and change management. , 1998, Quality in health care : QHC.

[172]  David Campbell,et al.  Flexibility in Long-Term Contractual Relationships: The Role of Co-Operation. , 1993, Lean Construction Journal.

[173]  Martin Skitmore,et al.  Ethics in Tendering: A Survey of Australian Opinion and Practice , 1999 .

[174]  J. Gero,et al.  The impact of working memory limitations on the design process during conceptualization , 2007 .

[175]  Can Balkaya,et al.  Finite Element Analysis and Practical Modeling of Reinforced Concrete Multi-Bin Circular Silos , 2006 .

[176]  Oluwole Alfred Olatunji,et al.  The impact of oil price regimes on construction cost in Nigeria , 2010 .

[177]  Anthony Williams,et al.  Heading into new virtual environments: what skills do design team members need? , 2009, J. Inf. Technol. Constr..

[178]  Mustafa Alshawi,et al.  Augmented process model for e-tendering: Towards integrating object models with document management systems , 2010 .

[179]  Shigeomi Nishigaki,et al.  Development of virtual and real-field construction management systems in innovative, intelligent field factory , 2000 .

[180]  R. E. Miles,et al.  Organizations: New Concepts for New Forms , 1986 .

[181]  Willy Sher,et al.  Building information modelling (BIM) system in construction in 2020: opportunities and implications , 2009 .

[182]  G. Duelen,et al.  Use of CAD-data for the off-line programming of industrial robots , 1987, Robotics.

[183]  Weiming Shen,et al.  Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review , 2010, Adv. Eng. Informatics.

[184]  Yaxin Bi,et al.  A Conceptual Knowledge-Based Cost Model for Optimizing the Selection of Materials and Technology for Building Design , 2008 .

[185]  Martin Fischer,et al.  Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..

[186]  Douglas Gransberga Construction Management and Economics , 2010 .

[187]  Bo-Christer Björk,et al.  A scenario for the development and implementation of a building product model standard , 1989 .

[188]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[189]  Vincent Ng,et al.  A study of quantity surveyors' ethical behaviour , 2001 .

[190]  Sevasti-Melissa Nolas,et al.  Pluralism in qualitative research: the impact of different researchers and qualitative approaches on the analysis of qualitative data , 2010 .

[191]  J. L. Stimpert Managerial and Organizational Cognition: Theory, Methods and Research , 1999 .

[192]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[193]  José L. Fernández-Solís COBRA 2007-XX 1 Analysis of the Forces in the Exponentialoid Growth in Construction , 2007 .

[194]  Weisheng Lu,et al.  Competitiveness in construction: a critical review of research , 2007 .

[195]  A. Dainty Methodological pluralism in construction management research , 2008 .

[196]  Yozo Fujino,et al.  Shared computer-aided structural design model for construction industry (infrastructure) , 2008, Comput. Aided Des..

[197]  R. M. Skitmore,et al.  Prequalification and c-competitiveness , 1993 .

[198]  Christine Pasquire,et al.  Applying lean thinking in commercial management , 2011 .

[199]  N. Leech,et al.  On Becoming a Pragmatic Researcher: The Importance of Combining Quantitative and Qualitative Research Methodologies , 2005 .

[200]  Thomas W. Malnight The Transition from Decentralized to Network-Based MNC Structures: An Evolutionary Perspective , 1996 .

[201]  Mehmet Fuat Hergunsel Benefits of Building Information Modeling for Construction Managers and BIM Based Scheduling , 2011 .

[202]  Liu Mao,et al.  Analysis of trample disaster and a case study – Mihong bridge fatality in China in 2004 , 2008 .

[203]  Jui-Sheng Chou,et al.  Cost simulation in an item-based project involving construction engineering and management , 2011 .

[204]  Edward J. Jaselskis,et al.  PILOT STUDY ON IMPROVING THE EFFICIENCY OF TRANSPORTATION PROJECTS USING LASER SCANNING , 2003 .

[205]  Robert M. Stark UNBALANCED BIDDING MODELS - THEORY , 1968 .

[206]  Albert P.C. Chan Time–cost relationship of public sector projects in Malaysia , 2001 .

[207]  Min-Yuan Cheng,et al.  Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry , 2010, Expert Syst. Appl..

[208]  Ka Chi Lam,et al.  The predictive ability of Bromilow's timecost model , 2001 .

[209]  Yash P. Gupta,et al.  Forecasting of working-capital requirements under capital constraints — A Monte Carlo simulation approach , 1984 .

[210]  H. van Meerveld Reflections on estimating : the effects of project complexity and the use of BIM on the estimating process , 2009 .

[211]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[212]  Lamine Mahdjoubi,et al.  SPATIAL VISUALIZATION OF BUILDING COMPONENTS , 2005 .

[213]  Michel Thiollent,et al.  Action Research and Participatory Research: An Overview , 2011 .

[214]  Martin Fischer Applications of BIM and Hurdles for Widespread Adoption of BIM 2007 AISC-ACCL eConstruction Roundtable Event Report , 2008 .

[215]  Robin Drogemuller CAN B.I.M BE CIVIL , 2009 .

[216]  Miroslaw J. Skibniewski,et al.  Object-oriented modeling of construction processes by unified modeling language , 2004 .

[217]  S. T Ng,et al.  Client and consultant perspectives of prequalification criteria , 1999 .

[218]  Susan Bergsten Using 4D CAD in the Design and Management of Vertical Extensions to Existing Buildings , 2008 .

[219]  Leonas Ustinovichius,et al.  Classification of the Investment Risk in Construction , 2007, CDVE.

[220]  Mohammed Abdel Razek,et al.  A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt , 2011, ArXiv.

[221]  David B. Ashley,et al.  Improved conceptual estimating performance using a knowledge-based approach , 1990 .

[222]  Andrew P. Witkin,et al.  Free-form shape design using triangulated surfaces , 1994, SIGGRAPH.

[223]  James E. Diekmann,et al.  Coping with Uncertainty in Unit Price Contracting , 1982 .

[224]  Min-Yuan Cheng,et al.  Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model , 2009 .

[225]  Morten T. Hansen,et al.  Knowledge Transfer in Intraorganizational Networks : Effects of Network Position and Absorptive Capacity on Business Unit Innovation and Performance , 2007 .

[226]  David Heesom,et al.  Trends of 4D CAD applications for construction planning , 2004 .

[227]  Bilal Succar,et al.  The Five Components of BIM Performance Measurement , 2010 .

[228]  P. Lam,et al.  A Comparative Study of the Benefits of Applying Target Cost Contracts between South Australia and Hong Kong , 2012 .

[229]  Tom Ritchey,et al.  Analysis and synthesis: On scientific method – based on a study by bernhard riemann , 1991 .

[230]  Anoop Sattineni,et al.  Estimating with BIM: A Survey of US Construction Companies , 2011 .

[231]  R. Teare,et al.  A systems model of effective teamwork , 1997 .

[232]  Martin Skitmore,et al.  Project management turnover: causes and effects on project performance , 2005 .

[233]  Ling Qin,et al.  Industry foundation classes based integration of architectural design and structural analysis , 2011 .

[234]  Wanda J. Orlikowski,et al.  Information Technology and the Structuring of Organizations , 2011 .

[235]  Martin Skitmore,et al.  The integration between design and maintenance of office building automation : a decision support approach , 2003 .

[236]  David Vose,et al.  Quantitative Risk Analysis: A Guide to Monte Carlo Simulation Modelling , 1996 .

[237]  Paul Teicholz,et al.  Pre-Estimate Cash Flow Analysis , 1977 .

[238]  K. Brazil,et al.  Revisiting the Quantitative-Qualitative Debate: Implications for Mixed-Methods Research , 2002, Quality & quantity.

[239]  Zijia Liu Feasibility Analysis of BIM Based Information System for Facility Management at WPI , 2010 .

[240]  Adekunle Sabitu Oyegoke,et al.  Specialist task organisations procurement approach for re-engineering construction project processes , 2007 .

[241]  Yacine Rezgui,et al.  Computer integrated construction: A review and proposals for future direction , 2007, Adv. Eng. Softw..

[242]  Ekambaram Palaneeswaran,et al.  Recent advances and proposed improvements in contractor prequalification methodologies , 2001 .

[243]  John Mingers,et al.  Combining IS Research Methods: Towards a Pluralist Methodology , 2001, Inf. Syst. Res..

[244]  Martin Fischer,et al.  Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .

[245]  N. Saraçoğlu Changing power balance in matrix organizations , 2009 .

[246]  Konstantinos P. Anagnostopoulos,et al.  An AHP model for construction contractor prequalification , 2006, Oper. Res..

[247]  A. E. Oke AN EXAMINATION OF PROJECT MANAGEMENT LEADERSHIP STYLES OF NIGERIAN QUANTITY SURVEYORS , 2010 .

[248]  Tapio Niemi Methods for Logical OLAP Design , 2001 .

[249]  F. J. Newland,et al.  A study of solar radiation models for the coastal region of South China , 1989 .

[250]  Salman T. Al-Sedairy A change management model for Saudi construction industry , 2001 .

[251]  Owen D. Wilson,et al.  A construction project cash flow model—an idiographic approach , 1986 .

[252]  Brian Eggleston,et al.  The NEC 3 Engineering and Construction Contract , 2006 .

[253]  Terry Lyons,et al.  Project risk management in the Queensland engineering construction industry : a survey , 2004 .

[254]  Simon Smith,et al.  Stochastic analysis of cyclic construction processes , 1998 .

[255]  Zayyana Shehu,et al.  Construction programme management theory and practice: Contextual and pragmatic approach , 2009 .

[256]  Alan Griffith Integrated management systems: a single management system solution for project control? , 2000 .

[257]  Tamara Munzner,et al.  A Nested Model for Visualization Design and Validation , 2009, IEEE Transactions on Visualization and Computer Graphics.

[258]  R. Hack,et al.  Evaluation , and management of unstable rock slopes by 3-D laser scanning , 2006 .

[259]  Henry Odeyinka,et al.  An Analysis of the Impacts of Risks and Uncertainties on Construction Cash Flow Forecast , 2001 .

[260]  S. Thomas Ng,et al.  Forecast models for actual construction time and cost , 2003 .

[261]  Mario Piattini,et al.  Data Model Metrics , 2002 .

[262]  Hamideh Afsarmanesh,et al.  Collaborative networked organizations - Concepts and practice in manufacturing enterprises , 2009, Comput. Ind. Eng..

[263]  Nigel Fielding,et al.  Triangulation and Mixed Methods Designs , 2012 .

[264]  Koleola T. Odusami,et al.  Factors Affecting the Accuracy of a Pre-Tender Cost Estimate in Nigeria , 2008 .

[265]  Juan David García Bacca De magia a técnica: ensayo de teatro filosófico-literario-técnico , 1989 .

[266]  Maged Georgy,et al.  Using genetic algorithms in optimizing construction material delivery schedules , 2008 .

[267]  Kees Dorst Building for the visual age , 2007 .

[268]  Aminah Robinson Fayek,et al.  A decision support system for contractor prequalification for surety bonding , 2012 .

[269]  Robert A. Burgelman A Model of the Interaction of Strategic Behavior, Corporate Context, and the Concept of Strategy , 1983 .

[270]  Xinping Liu,et al.  Equitable financial evaluation method for public-private partnership projects , 2008 .

[271]  Tao-chiu Kenny Tse,et al.  The utilisation of building information models in nD modelling: A study of data interfacing and adoption barriers , 2005, J. Inf. Technol. Constr..

[272]  M Skitmore Graphical method for identifying high outliers in construction contract auctions , 2001, J. Oper. Res. Soc..

[273]  Essam Shehab,et al.  An Intelligent Knowledge-Based System for Product Cost Modelling , 2002 .

[274]  David G. Woodward,et al.  Life cycle costing—Theory, information acquisition and application , 1997 .

[275]  Linqin Cai,et al.  Risk behavior simulation in virtual environment , 2010, 2010 3rd International Conference on Computer Science and Information Technology.

[276]  John E. Taylor,et al.  Integrating Agent-Based Simulation with Game Theory to Investigate the Hold-Up Problem in Project Networks , 2009 .

[277]  J. Ivey Focus groups. , 2011, Pediatric nursing.

[278]  Brian Graham,et al.  AN ACTION RESEARCH APPROACH TO SHARING SPECIALIST CONSTRUCTION KNOWLEDGE , 2008 .

[279]  S. Elmaghraby,et al.  Optimal Time-Cost Trade-Offs in GERT Networks , 1972 .

[280]  M. Skitmore,et al.  Subjective and objective stress in construction cost estimation , 2007 .

[281]  Mansour Nasser Jadid,et al.  Cost estimation of structural skeleton using an interactive automation algorithm: A conceptual approach , 2007 .

[282]  Yang Zhu,et al.  Project Finance in Construction: A Structured Guide to Assessment , 2010 .

[283]  H. Ashcraft Building Information Modeling : A Framework for Collaboration , 2008 .

[284]  Carlos Balaguer,et al.  Trends in Robotics and Automation in Construction , 2008 .

[285]  M. Oostra Building manufacturing architecture. Whatever you thought, think again , 2007 .

[286]  Steven C. Currall,et al.  Combining Qualitative and Quantitative Methodologies to Study Group Processes:An Illustrative Study of Acorporate Board of Directors , 1999 .

[287]  Robert Amor,et al.  Misconceptions About Integrated Project Databases , 2001, J. Inf. Technol. Constr..

[288]  Karen E. Watkins,et al.  The construct of the learning organization: Dimensions, measurement, and validation , 2004 .

[289]  James C. Taylor,et al.  Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline , 2007 .

[290]  Darius Migilinskas,et al.  The use of a virtual building design and construction model for developing an effective project concept in 5D environment , 2010 .

[291]  Giovanna Sansoni,et al.  State-of-The-Art and Applications of 3D Imaging Sensors in Industry, Cultural Heritage, Medicine, and Criminal Investigation , 2009, Sensors.

[292]  Karen Manley,et al.  The quantity surveyor’s role in innovation generation, adoption and diffusion in the Australian construction industry , 2005 .

[293]  David Scott Web-based construction information management systems , 2003 .

[294]  Vishal Singh,et al.  Building information modelling : an issue of adoption and change management , 2007 .

[295]  Anoop Sattenini,et al.  Preparing A Buindling Information Model For Facility Maintenance And Management , 2011 .

[296]  J. S. Kim,et al.  Effectiveness of OLAP-based cost data management in construction cost estimate , 2007 .

[297]  Willy Sher,et al.  Modelling outcomes of collaboration in building information modelling through gaming theory lenses , 2010 .

[298]  Akintola Akintoye,et al.  Macro models of UK construction contract prices , 1993 .

[299]  Jun Miura,et al.  Collaboration work for nuclear power building using 3D CAD information , 2006 .

[300]  Antony W. Pelosi ARCHITECTURAL HYPER-MODEL: CHANGING ARCHITECTURAL CONSTRUCTION DOCUMENTATION , 2007 .

[301]  Lyman W. Porter,et al.  Factors Affecting the Context for Motivation in Public Organizations1 , 1982 .

[302]  A. Kaka,et al.  Review of Unbalanced Bidding Models in Construction , 2007 .

[303]  Martin Betts Methods and data used by large building contractors in preparing tenders , 1990 .

[304]  Ogunsemi,et al.  The impact of building information modelling system on construction cost estimating , 2010 .

[305]  Joy A. Frechtling,et al.  Characteristics of the Discussion in Online and Face-to-Face Focus Groups , 2002 .

[306]  Stephen Olu Ogunlana Accuracy in design cost estimating , 1989 .

[307]  Erik Brynjolfsson,et al.  The Matrix of Change: A Tool for Business Process Reengineering , 1996 .

[308]  Peter Samuel Jensen The Use of Building Information Modeling in Generating Hard Bid Estimates , 2010 .

[309]  Stuart D. Green,et al.  Tendering: optimization and rationality , 1989 .

[310]  Katharina J. Srnka,et al.  From Words to Numbers: How to Transform Qualitative Data into Meaningful Quantitative Results , 2007 .

[311]  Keith Hogg,et al.  Willis's Practice and Procedure for the Quantity Surveyor , 2002 .

[312]  Peter E.D. Love,et al.  Stakeholder Management during Project Inception: Strategic Needs Analysis , 2004 .

[313]  Robert M. Stark,et al.  Some Multi-Contract Decision-Theoretic Competitive Bidding Models , 1971, Oper. Res..

[314]  N. Ellemers,et al.  SOCIAL IDENTITY IN INDUSTRIAL AND ORGANIZATIONAL PSYCHOLOGY: CONCEPTS, CONTROVERSIES AND CONTRIBUTIONS , 2006 .

[315]  Albert Boonstra,et al.  Essential competencies for technochange management: Towards an assessment model , 2009, Int. J. Inf. Manag..

[316]  Thomas S. Ng,et al.  CP-DSS: Decision support system for contractor prequalification , 1995 .

[317]  Y. Arayici,et al.  Digital Construction through BIM Systems will Drive the Re-engineering of Construction Business Practices , 2008, 2008 International Conference Visualisation.

[318]  A. Onwuegbuzie,et al.  Mixed Methods Research: A Research Paradigm Whose Time Has Come , 2004 .

[319]  Simon A. Burtonshaw-Gunn and Bob Ritchie Developments in construction supply chain management: The impact on people and cultural change , 2007 .

[320]  Dominic Holzer,et al.  ARE YOU TALKING TO ME? WHY BIM ALONE IS NOT THE ANSWER , 2007 .

[321]  Ghassan Aouad,et al.  Investigating the Role of Building Information Models as a Part of an Integrated Data Layer: A Fire Response Management Case , 2007 .

[322]  Ellen Yi-Luen Do,et al.  Collaboration and coordination in architectural design: approaches to computer mediated team work , 1998 .

[323]  Kwong Wing Chau,et al.  Monte Carlo simulation of construction costs using subjective data , 1995 .

[324]  Russell Kenley The predictive ability of Bromilow's timecost model: a comment , 2001 .

[325]  Leman Figen Gül,et al.  Virtual worlds as a constructivist learning platform: evaluations of 3D virtual worlds on design teaching and learning , 2008, J. Inf. Technol. Constr..

[326]  Martin Skitmore,et al.  Analytical and Approximate Variance of Total Project Cost , 2002 .

[327]  Norma G. Sutcliffe,et al.  Leadership behavior and business process reengineering (BPR) outcomes: An empirical analysis of 30 BPR projects , 1999, Inf. Manag..

[328]  Roger Flanagan,et al.  Life cycle costing and risk management , 1987 .

[329]  Lilia Gzara,et al.  Towards a knowledge repository for collaborative design process: focus on conflict management , 2004, Comput. Ind..

[330]  Steven J. Peterson Construction Accounting and Financial Management , 2004 .

[331]  G. Singh,et al.  The development of a rational bill of quantities , 1990 .

[332]  E. Mishler Validation in Inquiry-Guided Research: The Role of Exemplars in Narrative Studies , 1990 .

[333]  John A. A. Sillince,et al.  Organizational Context and the Discursive Construction of Organizing , 2007 .

[334]  J.S. Carson,et al.  Model verification and validation , 2002, Proceedings of the Winter Simulation Conference.

[335]  Massimiliano Lo Turco,et al.  BIM Use in the Construction Process , 2009, 2009 International Conference on Management and Service Science.

[336]  U. Flick,et al.  “I Can’t Prescribe Something Just Because Someone Asks for It . . .” , 2012 .

[337]  G. E. Younis Minimizing construction disputes , 2010 .

[338]  Vivian W. Y Tam,et al.  Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice , 2010 .

[339]  Jeffrey S. Russell,et al.  Long-Term Entropy and Profitability Change of United States Public Construction Firms , 2005 .

[340]  D. Mudd,et al.  Estimating and tendering for construction work , 1984 .

[341]  Nashwan Dawood,et al.  A structured methodology for enterprise modeling: a case study for modeling the operation of a british organization , 2011, J. Inf. Technol. Constr..

[342]  Martin Skitmore,et al.  Data Pooling for Early-Stage Price Forecasts , 2005 .

[343]  S. Thomas Foster An examination of the relationship between conformance and quality‐related costs , 1996 .

[344]  D. Olson,et al.  Circumplex Model VII: validation studies and FACES III. , 1986, Family process.

[345]  Peter C. M. Molenaar,et al.  The New Person-Specific Paradigm in Psychology , 2009 .

[346]  Muzani Mustapa,et al.  BILLS OF QUANTITIES - ARE THEY STILL USEFUL AND RELEVANT TODAY? , 2006 .

[347]  Martin Skitmore,et al.  The Use of Formal Project Management Processes in the Procurement of Queensland Aged Care Facilities , 2007 .

[348]  Ghassan Aouad,et al.  Rethinking construction: the Generic Design and Construction Process Protocol , 2000 .

[349]  William C. Regli,et al.  A Collaborative 3D Environment for Authoring Design Semantics , 2002, IEEE Computer Graphics and Applications.

[350]  R. Mlinga,et al.  Collaboration between formal and informal enterprises in the construction sector in Tanzania , 2002 .

[351]  Peter E.D. Love,et al.  Modelling the dynamics of design error induced rework in construction , 2000 .

[352]  David A. Ameen A computer assisted PERT simulation , 1987 .

[353]  Kurt Lewin,et al.  Resolving social conflicts : selected papers on group dynamics , 1948 .

[354]  Ani Raiden,et al.  Understanding employee resourcing in construction organizations , 2008 .

[355]  Abid Nadeem,et al.  Improving existing delay analysis techniques for the establishment of delay liabilities , 2004 .

[356]  B. McKelvey Guidelines for the Empirical Classification of Organizations. , 1975 .

[357]  Eber A. Schmitz,et al.  Structured construction and simulation of nondeterministic stochastic activity networks , 2009, Eur. J. Oper. Res..

[358]  K. Runeson,et al.  Methodology and method for price-level forecasting in the building industry , 1988 .

[359]  Min-Yuan Cheng,et al.  Construction management process reengineering: Organizational human resource planning for multiple projects , 2006 .

[360]  Rogier Jongeling A Process Model for Work-Flow Management in Construction , 2006 .

[361]  Roland Wagner,et al.  A VR based safety training in a petroleum refinery , 1999, Eurographics.

[362]  I. Mitroff,et al.  Organizational Symbolism: A Topic To Expand Organizational Analysis , 1980 .

[363]  Stephan Klamert Are construction cost escalations a natural law , 2011 .

[364]  Darshana Sedera,et al.  Does Size Matter ? Enterprise System Performance in Small , Medium and Large Organizations , 2008 .

[365]  Scott Moss,et al.  Alternative Approaches to the Empirical Validation of Agent-Based Models , 2007, J. Artif. Soc. Soc. Simul..

[366]  Michael Spearpoint,et al.  Sharing fire engineering simulation data using the IFC building information model , 2007 .

[367]  Jason Underwood,et al.  Going BIM in a commercial world , 2008 .

[368]  Martin Skitmore,et al.  Estimating processes of smaller builders , 1994 .

[369]  P. Bazeley Issues in Mixing Qualitative and Quantitative Approaches to Research , 2004 .

[370]  David J. Edwards,et al.  Modelling the magnitude of plant downtime: a tool for improving plant operations management , 2001 .

[371]  Olubola Babalola,et al.  An appraisal of the factors affecting production of cost estimate for electrical services in Nigeria , 2008 .

[372]  L. Friedman A Competitive-Bidding Strategy , 1956 .

[373]  Chimay J. Anumba,et al.  An integrated system for change management in construction , 2007 .

[374]  Martin Skitmore,et al.  The accuracy of construction price forecasts , 1990 .

[375]  Stephen O. Ogunlana,et al.  The nature of estimating accuracy: Developing correct associations , 1991 .

[376]  Chung-Wei Feng,et al.  An effective simulation mechanism for construction operations , 2003 .

[377]  Ulf R. Andersson,et al.  Balancing subsidiary influence in the federative MNC: a business network view , 2007 .

[378]  A. I. Kovacs Matrix Management , 1978 .

[379]  Ricardo Jardim-Goncalves,et al.  Challenging electronic procurement in the AEC sector: A BIM-based integrated perspective , 2011 .

[380]  Ronald M. Harstad,et al.  Modeling Competitive Bidding: A Critical Essay , 1994 .

[381]  Robert Larsson,et al.  ICT for whole life optimisation of residential buildings , 2007 .

[382]  Koen Vanhoof,et al.  A knowledge-based SWOT-analysis system as an instrument for strategic planning in small and medium sized enterprises , 1999, Decis. Support Syst..

[383]  J. Poon,et al.  Cross-cultural comparison of construction professionals' view on professional ethics , 2005 .

[384]  Franco K.T. Cheung,et al.  Application of cross validation techniques for modelling construction costs during the very early design stage , 2006 .

[385]  Athman Bouguettaya,et al.  Managing Changes to Virtual Enterprises on the Semantic Web , 2004, WISE.

[386]  Amer Momani,et al.  Material Handling Equipment Selection using Hybrid Monte Carlo Simulation and Analytic Hierarchy Process , 2011 .

[387]  J. Davidson Frame,et al.  The New Project Management: Tools for an Age of Rapid Change, Complexity, and Other Business Realities , 1994 .

[388]  Anthony Williams,et al.  A proposed framework to investigate building information modelling through knowledge elicitation and visual models , 2007 .

[389]  David Lowe,et al.  Experiential learning in cost estimating , 1994 .

[390]  Tim Cornick,et al.  A study of the contractor's quantity surveying practice during the construction process , 1994 .

[391]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[392]  S. Hesse-Biber,et al.  Triangulation and Mixed Methods Research , 2012 .

[393]  Ho Man-Fong Christabel,et al.  Quantity surveyors' background and training, and their ethical concepts, conceptions and interests considerations , 2003 .

[394]  Jeffrey S. Russell,et al.  Cash Flow Forecasting Model for General Contractors Using Moving Weights of Cost Categories , 2005 .

[395]  Simon Smith,et al.  A new earthworks estimating methodology , 2000 .

[396]  Simon Guy,et al.  Making morality: sustainable architecture and the pragmatic imagination , 2010 .

[397]  Narendra Shriniwas Nigudkar Effectiveness of 4D construction modeling in detecting time-space conflicts of construction sites , 2005 .

[398]  Willy Sher,et al.  The applications of building information modelling in facilities management , 2010 .

[399]  K. Howe,et al.  Mixed Methods, Triangulation, and Causal Explanation , 2012 .

[400]  Toni E Farah Review of Current Estimating Capabilities of the 3d Building Information Model Software to Support Design for Production/Construction , 2005 .

[401]  Zakaria Harun,et al.  Cost Analysis and Formulation of Cost Models for Two-Storey Buildings Construction in Malaysia , 2000 .

[402]  William J. Cosgrove Simplifying PERT Network Simulation with ARENA , 2008 .

[403]  Tahir Celik,et al.  Knowledge based-system for alternative design, cost estimating and scheduling , 2002, Knowl. Based Syst..

[404]  Clayton Reeser,et al.  Some Potential Human Problems of the Project Form of Organization , 1969 .

[405]  Angela Lee,et al.  A roadmap for nD-enabled construction , 2006 .

[406]  Symeon E. Christodoulou,et al.  A bid‐unbalancing method for lowering a contractor's financial risk , 2008 .

[407]  Zedan Hatush,et al.  Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .

[408]  Randall Deutsch,et al.  BIM and Integrated Design: Strategies for Architectural Practice , 2011 .

[409]  Thomas Froese,et al.  PRACTICE NOTE Building information modelling demystified: does it make business sense to adopt BIM? , 2009, ICIT 2008.

[410]  David A. Hensher,et al.  Transacting under a performance-based contract: The role of negotiation and competitive tendering , 2007 .

[411]  Gilbert A. Churchill A Paradigm for Developing Better Measures of Marketing Constructs , 1979 .

[412]  N. Ankrah,et al.  Construction Cost Management: Learning from Case Studies , 2008 .

[413]  Akintola Akintoye,et al.  An analysis of success factors and benefits of partnering in construction , 2000 .

[414]  Mohan Siriwardena,et al.  Construction cost management: An analytical taxonomy for critical literature review , 2010 .

[415]  Raymond C. Miller,et al.  On Becoming a Social Scientist by Shulamit Reinharz: A Critical Review , 1984 .

[416]  Henry Mintzberg,et al.  Structure in 5's: A Synthesis of the Research on Organization Design , 1980, Management Science.

[417]  Anthony Mills,et al.  A needs based methodology for classifying construction clients and selecting contractors : comment , 1999 .

[418]  Ammar Peter Kaka Contractors’ financial budgeting using computer simulation , 1994 .

[419]  H-J. Son,et al.  An integrated system for automated construction progress visualization using IFC-Based BIM , 2012 .

[420]  Mary Lou Maher,et al.  Dynamic Designs of 3D Virtual Worlds Using Generative Design Agents , 2005 .

[421]  Paul. Olomolaiye,et al.  Attributes of UK construction clients influencing project consultants' performance , 1994 .

[422]  Young Hoon Kwak,et al.  Conceptual estimating tool for technology-driven projects: exploring parametric estimating technique , 2005 .

[423]  Sheryl Staub-French,et al.  Practical and Research Issues in using Industry Foundation Classes for Construction Cost Estimating , 2000 .

[424]  Alberto Raposo,et al.  AUGMENTED REALITY TO AID CONSTRUCTION MANAGEMENT , 2007 .

[425]  Tarek M Hegazy Integrated bid preparation with emphases on risk assessment using neural networks , 1993 .

[426]  Martin Skitmore,et al.  Pricing construction work: a marketing viewpoint , 2007 .

[427]  Robert Woodbury,et al.  Visual sensitivity analysis of parametric design models: Improving agility in design , 2009 .

[428]  Blake Ives,et al.  The Global Network Organization of the Future: Information Management Opportunities and Challenges , 1994, J. Manag. Inf. Syst..

[429]  Martin Skitmore,et al.  Developments in contract price forecasting and bidding techniques , 1990 .

[430]  D. S. Thorpe,et al.  Responding to global issues: sustainability and innovation in the Australian SME residential building construction sector , 2007 .

[431]  Willy Sher,et al.  Building information modeling and quantity surveying practice , 2010 .

[432]  Zeljko Popovic Implementation of data mining techniques in construction estimating , 2004, Neural Parallel Sci. Comput..

[433]  Hannu Penttilä,et al.  Describing the changes in architectural information technology to understand design complexity and free-form architectural expression , 2006, J. Inf. Technol. Constr..

[434]  F. F. Ng,et al.  A FRAMEWORK FOR INTELLIGENT CHANGE MANAGEMENT IN THE CONSTRUCTION PROCESS , 2004 .

[435]  Rudolf Kruse,et al.  Fuzzy neural network , 2008, Scholarpedia.

[436]  Df Cooper,et al.  Risk analysis of a construction cost estimate , 1985 .

[437]  Martin Skitmore,et al.  Construction virtual prototyping : a survey of use , 2009 .

[438]  Kevan Buckley,et al.  A decision support tool for the valuation of variations on civil engineering projects , 2005 .

[439]  Mohammed Abdullah Eben Saleh Automation of Quantity Surveying in Construction Projects , 1999 .

[440]  Argia M. Sbordone Prices and unit labor costs: a new test of price stickiness $ , 2002 .

[441]  Ming Sun,et al.  A change management maturity model for construction projects , 2009 .

[442]  George Ofori,et al.  New Aspects of Quantity Surveying Practice , 2012 .

[443]  Paul Bowen,et al.  Value management practice by South African quantity surveyors , 2010 .

[444]  Ka Erlaluopeizidepuertuo,et al.  Enhancing SafEty throughout conStruction uSing BiM/VDc , 2012 .

[445]  Aj Marshall-Ponting,et al.  An nD modelling approach to improve communication processes for construction , 2005 .

[446]  Franco K.T. Cheung,et al.  Refinement of Storey Enclosure Forecasting Method , 2005 .

[447]  Thomas H. Kolbe,et al.  Conceptual Requirements for the Automatic Reconstruction of Building Information Models from Uninterpreted 3D Models , 2009 .

[448]  Roger Flanagan,et al.  Whole Life Appraisal for Construction , 2005 .

[449]  William R. Sherman,et al.  Understanding Virtual RealityInterface, Application, and Design , 2002, Presence: Teleoperators & Virtual Environments.

[450]  Ramón Queraltó Technology As a New Condition of the Possibility of Scientific Knowledge , 1998 .

[451]  J. Poon,et al.  Professional ethics for surveyors and construction project performance: what we need to know , 2003 .

[452]  Brodie McAdam,et al.  Building information modelling: the UK legal context , 2010 .

[453]  Konstantinos Nasios,et al.  Improving chemical plant safety training using virtual reality , 2002 .

[454]  Richard Kirkham,et al.  Re‐engineering the whole life cycle costing process , 2005 .

[455]  P. Luciani,et al.  An investigation into the cycle and prediction of organisation facility management procurement , 2007 .

[456]  D. Gann,et al.  Innovation in project-based, service-enhanced firms: the construction of complex products and systems , 2000 .

[457]  M. Gates Bidding Strategies and Probabilities , 1967 .

[458]  James T. O'Connor,et al.  Optimizing Implementation of Value Management Processes for Capital Projects , 2005 .

[459]  Elcin Tas,et al.  A building cost estimation model based on functional elements , 2007 .

[460]  John Mitchell,et al.  Collaborative design using a shared IFC building model—Learning from experience , 2007 .

[461]  P. Liston,et al.  Contract costing in outsourcing enterprises: Exploring the benefits of discrete-event simulation , 2007 .

[462]  Mike Kagioglou,et al.  Application of Lean Construction Principles in Product Development Process Modelling , 2003 .

[463]  Yong K. Cho,et al.  BIM-Driven Economic Analysis for Zero Net Energy Test Home , 2010 .

[464]  D. J. Rasbash Major fire disasters involving flashover , 1991 .

[465]  Martin Skitmore,et al.  Decision Support System for Construction Prequalification , 1994 .

[466]  James M. Utterback,et al.  A dynamic model of process and product innovation , 1975 .

[467]  Martin Skitmore,et al.  Marketing and pricing strategy , 2009 .

[468]  P. G. Ioannou Bidding Models — Symmetry and State of Information , 1988 .

[469]  Yimin Zhu,et al.  Applying metadata models to unstructured content of construction documents: A view-based approach , 2007 .

[470]  Anthony N. Pettitt,et al.  Gates' bidding model , 2007 .

[471]  Yusuf Arayici,et al.  Building information modelling (BIM) implementation and remote construction projects: Issues, Challenges and Critiques , 2012, J. Inf. Technol. Constr..

[472]  William A. Donaldson The Estimation of the Mean and Variance of a PERT Activity Time , 1965 .

[473]  S. Albers,et al.  Crisis Construction and Organizational Learning: Capability Building in Catching-Up at Hyundai Motor , 1998 .

[474]  Zahir Irani,et al.  An exploratory study of information technology evaluation and benefits management practices of SMEs in the construction industry , 2004, Inf. Manag..

[475]  Martin Skitmore,et al.  The effect of client and type and size of construction work on a contractor's bidding strategy , 2001 .

[476]  Martin Skitmore,et al.  First and second price independent values sealed bid procurement auctions: some scalar equilibrium results , 2008 .

[477]  Simone Clemhout The Impact of Housing Cyclicality on the Construction of Residential Units and Housing Costs , 1981 .

[478]  Bo-Christer Björk,et al.  A model integrating the facilities management process with the building end user’s business process (ProFacil) , 2004 .

[479]  Daniel W. Halpin,et al.  Simulation experiment for improving construction processes , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..

[480]  I. O. Aje,et al.  A model for contractors’ selection in Nigeria , 2006 .

[481]  Hugo Priemus,et al.  Dutch contracting fraud and governance issues , 2004 .

[482]  Jane Hunter,et al.  Scientific Models: A User-oriented Approach to the Integration of Scientific Data and Digital Libraries , 2006 .

[483]  A. H. Christer,et al.  O.R. modelling of the deterioration and maintenance of concrete structures , 1997 .

[484]  Ashraf El-Hamalawi,et al.  An XML based standard to enable bulk project data transfer between heterogeneous systems , 2008, J. Inf. Technol. Constr..

[485]  Colin Sharp Qualitative Research and Evaluation Methods (3rd ed.) , 2003 .

[486]  Oluwole Alfred Olatunji,et al.  Modelling organizations' structural adjustment to BIM adoption: a pilot study on estimating organizations , 2011, J. Inf. Technol. Constr..

[487]  Edward A. Lee Cyber Physical Systems: Design Challenges , 2008, 2008 11th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC).

[488]  Chris I. Goodier,et al.  The futures of construction: a critical review of construction future studies , 2007 .