Planning, scheduling and dispatching tasks in production control

Abstract"What is the difference between planning and scheduling?" Production control encompasses many tasks performed by humans, three of which are planning, scheduling, and dispatching. In the past, the only criterion that could distinguish between the tasks was that planning is usually on a higher level than scheduling and scheduling is on a higher level than dispatching. Hence, the tasks are often ambiguous, unclear, and subject to speculation. There are few formal studies on the actual tasks of planning, scheduling, and dispatching, and there are no known studies that compare or discuss all three. In this paper it is argued that it is important to understand the differences between the tasks. An action science and ethnographic case study is presented as the empirical basis for the discussion, and the implications for decision support systems in production control tasks are presented.

[1]  Reha Uzsoy,et al.  Measuring the Quality of Manufacturing Schedules , 1995 .

[2]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[3]  K. E. Thurley,et al.  THE SUPERVISOR'S ROLE IN PRODUCTION CONTROL , 1961 .

[4]  E. Gerald Hurst,et al.  Heuristic Scheduling in a Woolen Mill , 1967 .

[5]  Jc Johan Wortmann Flexibility of standard software packages for production/inventory control , 1992 .

[6]  P. Norman,et al.  A Comparison of Expert System and Human Operator Performance for Cement Kiln Operation , 1990 .

[7]  Oliver W. Wight,et al.  Production and Inventory Control , 1985 .

[8]  James H. Greene,et al.  Production and Inventory Control Handbook , 1970 .

[9]  Charles Augustus Koepke,et al.  Plant production control , 1949 .

[10]  Jwm Will Bertrand,et al.  Production Control: A Structural and Design Oriented Approach , 1990 .

[11]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[12]  Vcs Vincent Wiers Human-computer interaction in production scheduling : analysis and design of decision support systems for production scheduling tasks , 1997 .

[13]  Kenneth N. McKay,et al.  Decision support for production scheduling tasks in shops with much uncertainty and little autonomous flexibility , 2001 .

[14]  John M. Dutton,et al.  SIMULATION OF AN ACTUAL PRODUCTION SCHEDULING AND WORK FLOW CONTROL SYSTEM , 1961 .

[15]  Vincent C. S. Wiers,et al.  A case study on the integration of APS and ERP in a steel processing plant , 2002 .

[16]  Peter Duchessi,et al.  A Knowledge-based Approach to Production Planning , 1990 .

[17]  Kenneth N. McKay,et al.  Schedulers & Planners: What and How Can We Learn From Them , 1995 .

[18]  F. Robert Jacobs,et al.  MANUFACTURING PLANNING AND CONTROL SYSTEMS FOR SUPPLY CHAIN MANAGEMENT , 2004 .

[19]  D. Jorgensen Participant Observation: A Methodology for Human Studies , 1989 .

[20]  E. Hutchins Cognition in the wild , 1995 .

[21]  Penelope M. Sanderson,et al.  The Human Planning and Scheduling Role in Advanced Manufacturing Systems: An Emerging Human Factors Domain , 1989 .

[22]  Pierre Lopez,et al.  Cooperative system design in scheduling , 1998 .

[23]  Scott Grills Doing ethnographic research : fieldwork settings , 1998 .

[24]  X. Chao,et al.  Operations scheduling with applications in manufacturing and services , 1999 .

[25]  Ppm Paul Stoop Performance management in manufacturing : a method for short term performance evaluation and diagnosis , 1996 .

[26]  M. Easterby-Smith,et al.  Management Research: An Introduction , 1991 .

[27]  Gavriel Salvendy,et al.  An approach to knowledge elicitation in scheduling FMS: Toward a hybrid intelligent system , 1988 .

[28]  M. Markus,et al.  The Enterprise System Experience— From Adoption to Success , 2000 .

[29]  Arjen A. A. den Boer Decision support for material planners , 1994 .

[30]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[31]  Penelope M. Sanderson,et al.  Towards the model human scheduler , 1991 .

[32]  John F. Magee,et al.  Production planning and inventory control , 1958 .

[33]  Kenneth N. McKay,et al.  Integrated decision support for planning, scheduling, and dispatching tasks in a focused factory , 2003, Comput. Ind..

[34]  R. Yin Case Study Research: Design and Methods , 1984 .

[35]  John M. Dutton,et al.  PRODUCTION SCHEDULING—A BEHAVIORAL MODEL , 1964 .

[36]  Vcs Vincent Wiers,et al.  A framework for decision support in production scheduling tasks , 1997 .

[37]  Vcs Vincent Wiers Design of a knowledge-based scheduling system for a sheet material manufacturer , 2001 .

[38]  Edward Toomer,et al.  Qualitative Methods in Management Research , 1989 .

[39]  Kenneth N. McKay,et al.  ‘Common sense’ realities of planning and scheduling in printed circuit board production , 1995 .

[40]  C. H. Kriebel,et al.  AN EMPIRICAL STUDY OF SCHEDULING DECISION BEHAVIOR. , 1965 .

[41]  Stephen Roth,et al.  Biology of developing systems by P. Grant. New York: Holt, Rinehart & Winston. 736 pp. $19.95 , 1979, Cell.

[42]  Kenneth N. McKay,et al.  The application of computerized production control systems in job shop environments , 2000 .