Performance evaluation of private universities based on balanced scorecard: empirical study based on Iran
暂无分享,去创建一个
[1] Young-Gul Kim,et al. A CRM performance measurement framework: Its development process and application , 2009 .
[2] Meysam Shaverdi,et al. Combining Fuzzy MCDM with BSC Approach in Performance Evaluation of Iranian Private Banking Sector , 2011, Adv. Fuzzy Syst..
[3] Mark L. Frigo,et al. The Balanced Scorecard for Community Banks: Translating Strategy into Action , 2000 .
[4] Edmundas Kazimieras Zavadskas,et al. Selection of rational dispute resolution method by applying new step‐wise weight assessment ratio analysis (Swara) , 2010 .
[5] Yi-Kuei Lin,et al. Performance evaluation of extension education centers in universities based on the balanced scorecard. , 2011, Evaluation and program planning.
[6] Sherif Ali Mohtady Mohamed,et al. Utilizing the balanced scorecard for IT/IS performance evaluation in construction , 2001 .
[7] Javad Jassbi,et al. A Fuzzy DEMATEL framework for modeling cause and effect relationships of strategy map , 2011, Expert Syst. Appl..
[8] P. Yu. A Class of Solutions for Group Decision Problems , 1973 .
[9] S. G. Deshmukh,et al. Development of a balanced scorecard , 2006 .
[10] D. B. Smith,et al. Managing For Value: Developing A Performance Measurement System Integrating Economic Value Added and The Balanced Scorecard In Strategic Planning , 2004, Journal of Business Strategies.
[11] Thomas L. Albright,et al. An investigation of the effect of Balanced Scorecard implementation on financial performance , 2004 .
[12] R. Kaplan,et al. Using the balanced scorecard as a strategic management system , 1996 .
[13] Ming-Lang Tseng,et al. Implementation and performance evaluation using the fuzzy network balanced scorecard , 2010, Comput. Educ..
[14] K. Timoshenko. Russian public sector reform: The impact on university accounting , 2008 .
[15] W. Hsu,et al. The sustainability balanced scorecard as a framework for selecting socially responsible investment: an effective MCDM model , 2009, J. Oper. Res. Soc..
[16] R. Kaplan,et al. The balanced scorecard--measures that drive performance. , 2015, Harvard business review.
[17] Hao-Chen Huang,et al. Designing a knowledge-based system for strategic planning: A balanced scorecard perspective , 2009, Expert Syst. Appl..
[18] Donald D. Tippett,et al. An Analysis of Team Rewards at the U.S. Army Corps of Engineers Huntsville Center , 2003 .
[19] Zhi-qiang Ma,et al. A New Method for Information System Selection , 2009, 2009 Second International Conference on Future Information Technology and Management Engineering.
[20] A. Gabus,et al. Perceptions of the world problematique: communication procedure, communicating with those bearing collective responsibility , 1973 .
[21] Rajat Bhagwat,et al. Performance measurement of supply chain management: A balanced scorecard approach , 2007, Comput. Ind. Eng..
[22] Mehdi Fasanghari,et al. A Novel Method Combining ORESTE, Fuzzy Set Theory, and TOPSIS Method for Ranking the Information and Communication Technology Research Centers of Iran , 2009, 2009 Sixth International Conference on Information Technology: New Generations.
[23] Gwo-Hshiung Tzeng,et al. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..
[24] Ufuk Cebeci,et al. Fuzzy AHP-based decision support system for selecting ERP systems in textile industry by using balanced scorecard , 2009, Expert Syst. Appl..
[25] Mónica García-Melón,et al. An ANP approach to assess the sustainability of tourist strategies for the coastal national parks of Venezuela , 2010 .
[26] Dennis J. Duquette,et al. A Performance Measurement Model for the Office of Inspector General , 1993 .
[27] S. Deshmukh,et al. Evaluating petroleum supply chain performance , 2008 .
[28] Gwo-Hshiung Tzeng,et al. Extended VIKOR method in comparison with outranking methods , 2007, Eur. J. Oper. Res..
[29] T. Saaty. The Analytic Network Process , 2001 .
[30] Y. L. Chan. An Analytic Hierarchy Framework for Evaluating Balanced Scorecards of Healthcare Organizations , 2009 .
[31] Karen S. Cravens,et al. Prioritizing Performance Measures Within the Balanced Scorecard Framework , 2003 .
[32] L. C. Leung,et al. Implementing the balanced scorecard using the analytic hierarchy process & the analytic network process , 2006, J. Oper. Res. Soc..
[33] Heydar Amiran,et al. A fuzzy MCDM approach for evaluating steel industry performance based on balanced scorecard: A case in Iran , 2011, 2011 2nd IEEE International Conference on Emergency Management and Management Sciences.
[34] Tauno Palva,et al. Pages 26-35 , 2001 .
[35] Wen-Chin Chen,et al. A fuzzy AHP and BSC approach for evaluating performance of IT department in the manufacturing industry in Taiwan , 2008, Expert Syst. Appl..
[36] Cheng-Wei Lin,et al. Multi-criteria analysis of alternative-fuel buses for public transportation , 2005 .
[37] Tan Miller,et al. A FRAMEWORK FOR INTEGRATING ACTIVITY-BASED COSTING AND THE BALANCED SCORECARD INTO THE LOGISTICS STRATEGY DEVELOPMENT AND MONITORING PROCESS. , 1998 .
[38] Edmundas Kazimieras Zavadskas,et al. Ranking the strategies of mining sector through anp and topsis in a swot framework , 2011 .
[39] Gwo-Hshiung Tzeng,et al. Evaluating intertwined effects in e-learning programs: A novel hybrid MCDM model based on factor analysis and DEMATEL , 2007, Expert Syst. Appl..
[40] R Terry,et al. ADDRESSING BALANCED SCORECARD TRADE-OFF ISSUES BETWEEN PERFORMANCE METRICS USING MULTIATTRIBUTE UTILITY THEORY , 2003 .
[41] Huan-Jyh Shyur,et al. COTS evaluation using modified TOPSIS and ANP , 2006, Appl. Math. Comput..
[42] Edmundas Kazimieras Zavadskas,et al. An integrated model for prioritizing strategies of the iranian mining sector , 2011 .
[43] Yanan Wang,et al. A Fuzzy AHP and BSC Approach for Evaluating Performance of a Software Company Based on Knowledge Management , 2009, 2009 First International Conference on Information Science and Engineering.
[44] Gwo-Hshiung Tzeng,et al. Multicriteria Planning of Post‐Earthquake Sustainable Reconstruction , 2002 .
[45] Grzegorz Ginda,et al. Identification of building repair policy choice criteria role , 2009 .
[46] Yonggui He,et al. The Performance Evaluation of ERP Application Based on TOPSIS and Vague Set , 2009, 2009 Second International Conference on Intelligent Computation Technology and Automation.
[47] Sarfaraz Hashemkhani Zolfani,et al. Application of MCDM methods in short-term planning for private universities based on balanced scorecard: a case study from Iran , 2012 .
[48] Hao-Chen Huang,et al. Developing strategic measurement and improvement for the biopharmaceutical firm: Using the BSC hierarchy , 2011, Expert Syst. Appl..
[49] Gwo-Hshiung Tzeng,et al. Building an effective safety management system for airlines , 2008 .
[50] Yi-Hsuan Chen,et al. A fuzzy MCDM approach for evaluating banking performance based on Balanced Scorecard , 2009, Expert Syst. Appl..
[51] Metin Dagdeviren,et al. Using the fuzzy analytic network process (ANP) for Balanced Scorecard (BSC): A case study for a manufacturing firm , 2010, Expert Syst. Appl..