Production planning in a two-level supply chain for production-time-dependent products with dynamic demands

Abstract We consider a two-level supply chain that consists of multiple suppliers and a manufacturing plant. Each supplier produces semi-finished products needed for several types of (finished) products and delivers the semi-finished products to the manufacturing plant, where the products are produced to satisfy dynamic demands. In each supplier, production times of semi-finished products for different product types may be different, but processing should be started at the same time if they are in the same production batch although they may be completed at different times. The problem considered here is to determine production plans of the suppliers with the objective of minimizing the sum of raw material purchasing costs, production costs, setup costs of the suppliers, transportation costs, and costs for outsourcing semi-finished products. We present a mixed integer programming model and develop a two-step heuristic algorithm in which the problem is decomposed into two subproblems and these subproblems are solved sequentially. We also present solution-improvement procedures. Performance of the algorithm is evaluated by comparing its solutions with optimal solutions and good solutions obtained from a simulated annealing algorithm developed in this study, and results are reported.

[1]  Feng Chu,et al.  A cut-and-solve based algorithm for the single-source capacitated facility location problem , 2012, Eur. J. Oper. Res..

[2]  Ting Wu,et al.  A logistics network design model with vendor managed inventory , 2012 .

[3]  Alok Aggarwal,et al.  Improved Algorithms for Economic Lot Size Problems , 1993, Oper. Res..

[4]  Abolfazl Gharaei,et al.  Joint Economic Lot-sizing in Multi-product Multi-level Integrated Supply Chains: Generalized Benders Decomposition , 2020, International Journal of Systems Science: Operations & Logistics.

[5]  Hanan Luss,et al.  A Lagrangian Relaxation Heuristic for Capacitated Facility Location with Single-Source Constraints , 1986 .

[6]  George L. Nemhauser,et al.  The uncapacitated facility location problem , 1990 .

[7]  George O. Wesolowsky,et al.  Dynamic Facility Location , 1973 .

[8]  B. A. Kalaf,et al.  Enhanced Simulated Annealing for Solving Aggregate Production Planning , 2016 .

[9]  Jörg Homberger,et al.  A Parallel Genetic Algorithm for the Multilevel Unconstrained Lot-Sizing Problem , 2008, INFORMS J. Comput..

[10]  Halit Üster,et al.  Dynamic-demand capacitated facility location problems with and without relocation , 2011 .

[11]  Jully Jeunet,et al.  Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm , 2000 .

[12]  Donald Erlenkotter,et al.  A Dual-Based Procedure for Uncapacitated Facility Location , 1978, Oper. Res..

[13]  Yang Fang,et al.  Genetic Algorithm Solution for Multi-Period Two-echelon Integrated Competitive/Uncompetitive Facility Location Problem , 2008, Asia Pac. J. Oper. Res..

[14]  Yeong-Dae Kim,et al.  Design and operation of a two-level supply chain for production-time-dependent products using Lagrangian relaxation , 2016, Comput. Ind. Eng..

[15]  Harvey M. Wagner,et al.  Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..

[16]  Nicos Christofides,et al.  Extensions to a Lagrangean relaxation approach for the capacitated warehouse location problem , 1983 .

[17]  Jörg Homberger,et al.  Decentralized multi-level uncapacitated lot-sizing by automated negotiation , 2010, 4OR.

[18]  Qingwei Li,et al.  Reliable facility location design under disruptions , 2013, Comput. Oper. Res..

[19]  Abolfazl Gharaei,et al.  Modelling and optimal lot-sizing of integrated multi-level multi-wholesaler supply chains under the shortage and limited warehouse space: generalised outer approximation , 2019 .

[20]  Emre A. Veral,et al.  THE PERFORMANCE OF A SIMPLE INCREMENTAL LOT‐SIZING RULE IN A MULTILEVEL INVENTORY ENVIRONMENT , 1985 .

[21]  D. Sweeney,et al.  An Improved Long-Run Model for Multiple Warehouse Location , 1976 .

[22]  William J. Guerrero,et al.  Hybrid heuristic for the inventory location-routing problem with deterministic demand , 2013 .

[23]  G. O. Wesolowsky,et al.  The Multiperiod Location-Allocation Problem with Relocation of Facilities , 1975 .

[24]  George Q. Huang,et al.  A bi-objective model for supply chain design of dispersed manufacturing in China , 2013 .

[25]  Reza Ghanbari,et al.  An Efficient and Practically Robust Hybrid Metaheuristic Algorithm for Solving Fuzzy Bus Terminal Location Problems , 2012, Asia Pac. J. Oper. Res..

[26]  Louis E. Yelle Materials requirements lot sizing: a multi-level approach , 1979 .

[27]  Abolfazl Gharaei,et al.  Modeling and optimization of four-level integrated supply chain with the aim of determining the optimum stockpile and period length: sequential quadratic programming , 2017 .

[28]  Daniel Aloise,et al.  A simple and effective genetic algorithm for the two-stage capacitated facility location problem , 2014, Comput. Ind. Eng..

[29]  J. Barceló,et al.  A heuristic lagrangean algorithm for the capacitated plant location problem , 1984 .

[30]  Albert P. M. Wagelmans,et al.  Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case , 1992, Oper. Res..

[31]  Seyed Hessameddin Zegordi,et al.  A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain , 2010, Comput. Ind. Eng..

[32]  Tony J. Van Roy,et al.  A Dual-Based Procedure for Dynamic Facility Location , 1982 .

[33]  C. Canel,et al.  Multi-period international facilities location: An algorithm and application , 1997 .

[34]  Justo Puerto,et al.  The multi-period incremental service facility location problem , 2009, Comput. Oper. Res..

[35]  Yao Zhao,et al.  Planning for demand failure: A dynamic lot size model for clinical trial supply chains , 2011, Eur. J. Oper. Res..

[36]  Feng Chu,et al.  Lower and upper bounds for a two-stage capacitated facility location problem with handling costs , 2014, Eur. J. Oper. Res..

[37]  Abolfazl Gharaei,et al.  An optimal integrated lot sizing policy of inventory in a bi-objective multi-level supply chain with stochastic constraints and imperfect products , 2018 .

[38]  Abolfazl Gharaei,et al.  Inventory model in a four-echelon integrated supply chain: modeling and optimization , 2017 .

[39]  Hasan Hosseini Nasab,et al.  Solving the dynamic capacitated location-routing problem with fuzzy demands by hybrid heuristic algorithm , 2014, Eur. J. Oper. Res..

[40]  Nicolas Jonard,et al.  A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs , 2000 .

[41]  Zvi Drezner,et al.  New heuristic algorithms for solving the planar p-median problem , 2015, Comput. Oper. Res..

[42]  Yeong-Dae Kim,et al.  Search heuristics for a parallel machine scheduling problem with ready times and due dates , 1997 .

[43]  A. M. Geoffrion,et al.  Lagrangean Relaxation Applied to Capacitated Facility Location Problems , 1978 .

[44]  M. R. Rao,et al.  An Algorithm for the Fixed-Charge Assigning Users to Sources Problem , 1983 .

[45]  P. Chardaire,et al.  Solving the dynamic facility location problem , 1996 .

[46]  A. Federgruen,et al.  A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0n log n or 0n Time , 1991 .

[47]  Cem Canel,et al.  International facilities location: A heuristic procedure for the dynamic uncapacitated problem , 2001 .

[48]  Hesham K. Alfares,et al.  Lot sizing and supplier selection with multiple items, multiple periods, quantity discounts, and backordering , 2018, Comput. Ind. Eng..

[49]  Seyed Taghi Akhavan Niaki,et al.  Optimization of a multiproduct economic production quantity problem with stochastic constraints using sequential quadratic programming , 2015, Knowl. Based Syst..

[50]  Ou Tang,et al.  Simulated annealing in lot sizing problems , 2004 .

[51]  Abolfazl Gharaei,et al.  Four-Echelon Integrated Supply Chain Model with Stochastic Constraints Under Shortage Condition , 2017 .