Capacity assignment of the production lines with consideration of equilibrium requirement in iron & steel complex
暂无分享,去创建一个
[1] D. A. Wismer,et al. A mixed integer programming model for scheduling orders in a steel mill , 1974 .
[2] Lixin Tang,et al. A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex , 2007, Eur. J. Oper. Res..
[3] Lixin Tang,et al. A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..
[4] Colin L. Moodie,et al. Hierarchical production planning for a modern steel manufacturing system , 1989 .
[5] S. Rajagopalan,et al. Make to Order or Make to Stock: Model and Application , 2002, Manag. Sci..
[6] Lixin Tang,et al. A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex , 2000, Eur. J. Oper. Res..
[7] Fariborz Jolai,et al. Hierarchical production planning and scheduling in make-to-order environments: reaching short and reliable delivery dates , 2009 .
[8] Reza Tavakkoli-Moghaddam,et al. A new decision-making structure for the order entry stage in make-to-order environments , 2008 .