Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature

This paper uses an econometric meta-regression analysis framework to examine how the mean percentage cost overruns (MPCOs) of transportation projects reported in the literature vary by study specific characteristics, such as whether it is a road or rail project, the world region where the study was conducted; and the year of publication of the study. The motivation of the study is that there are no other studies in the literature on MPCOs of transportation projects using meta-regression analysis; a method well respected in other fields for summarizing findings from different studies. The data used comprise 127 data points retrieved from 48 studies from across the continents. The results show that (1) cost overruns rather than underruns are prevalent across all types of studies, and the typical cost overrun is, on average, 34% regardless of the transportation infrastructure under consideration; (2) recent studies show significantly lower MPCOs as compared to earlier studies; (3) published studies in scientific journals or conference proceedings show higher MPCOs than unpublished reports; (4) in comparison with Asian studies and those of the rest of the world, European and North American studies show significantly lower MPCOs, but Australian studies are not significantly different; (5) road projects show significantly lower MPCOs than rail projects regardless of the region of study; and (6) European and North American roads show higher MPCOs than rails in Asia and the rest of the world. We conclude that the magnitudes of MPCO results from individual studies should not be generalized as the study specific characteristics matter. Insights offered by this study can, therefore, serve as a reference when reporting results from individual studies.

[1]  J. MacKinnon,et al.  Estimation and inference in econometrics , 1994 .

[2]  David J. Edwards,et al.  Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework , 2008, IEEE Transactions on Engineering Management.

[3]  Peter E.D. Love,et al.  Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation , 2016 .

[4]  Bent Flyvbjerg,et al.  Geographical Variation in Project Cost Performance: The Netherlands versus Worldwide , 2012, 1307.2181.

[5]  Ricard Anguera,et al.  The Channel Tunnel – An Ex-post Economic Evaluation , 2006 .

[6]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[7]  Nabil Al-Hazim,et al.  Delay and cost overrun in road construction projects in Jordan , 2015 .

[8]  Jimmie Hinze,et al.  COST OVERRUNS ON STATE OF WASHINGTON CONSTRUCTION CONTRACTS , 1992 .

[9]  Keith R. Molenaar,et al.  Evaluation of Alternative Contracting Techniques on FDOT Construction Projects , 2007 .

[10]  Sebastian Morris,et al.  Cost and Time Overruns in Public Sector Projects , 2005 .

[11]  David Banister,et al.  How to Write a Literature Review Paper? , 2016 .

[12]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[13]  Bent Flyvbjerg,et al.  Cost Overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness , 2010, European Journal of Transport and Infrastructure Research.

[14]  Intan Rohani Endut,et al.  Factors contributing to project time and hence cost overrun in the Malaysian construction industry , 2014 .

[15]  Jeffrey M. Wooldridge,et al.  Introductory Econometrics: A Modern Approach , 1999 .

[16]  Theopisti C. Papadopoulou,et al.  Causes of cost overruns in transport infrastructure projects in Asia : Their significance and relationship with project size , 2012 .

[17]  L. Hedges,et al.  Statistical Methods for Meta-Analysis , 1987 .

[18]  Fernando De la Torre,et al.  Robust Regression , 2016, IEEE Trans. Pattern Anal. Mach. Intell..

[19]  Medhat George Attara Predicting cost overrun of railroad bridge construction , 2015 .

[20]  M. Behera,et al.  PPPs and Project Overruns: Evidence from Road Projects in India , 2014 .

[21]  James Odeck,et al.  Cost overruns in road construction--what are their sizes and determinants? , 2004 .

[22]  Pramen P. Shrestha,et al.  Magnitude of Construction Cost and Schedule Overruns in Public Work Projects , 2013 .

[23]  Morten Skou Nicolaisen,et al.  Forecasts: Fact or Fiction?: Uncertainty and Inaccuracy in Transport Project Evaluation , 2012 .

[24]  Peter E.D. Love,et al.  Overruns in transportation infrastructure projects , 2014 .

[25]  Mette K. Skamris,et al.  Inaccuracy of traffic forecasts and cost estimates on large transport projects , 1997 .

[26]  Polona Tominc,et al.  A cost performance analysis of transport infrastructure construction in Slovenia , 2012 .

[27]  James Odeck,et al.  The Impact of External Quality Assurance of Costs Estimates on Cost Overruns: Empirical Evidence from the Norwegian Road Sector , 2015, European Journal of Transport and Infrastructure Research.

[28]  B. Wee Large Infrastructure Projects: A Review of the Quality of Demand Forecasts and Cost Estimations , 2007 .

[29]  Peter Nijkamp,et al.  How Reliable are Estimates of Infrastructure Costs? A Comparative Analysis. , 1999 .

[30]  James Odeck,et al.  Cost escalations in the front-end of projects – empirical evidence from Norwegian road projects , 2017 .

[31]  Garry D. Creedy,et al.  Risk factors leading to cost overrun in the delivery of highway construction projects , 2006 .

[32]  Qing Wu Transportation infrastructure project cost overrun risk analysis : risk factor analysis models , 2006 .

[33]  Eric Molin,et al.  Characteristics of Cost Overruns for Dutch Transport Infrastructure Projects and the Importance of the Decision to Build and Project Phases , 2012 .

[34]  G. Glass,et al.  Meta-analysis in social research , 1981 .

[35]  James Odeck Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway , 2014 .

[36]  Peter E.D. Love,et al.  Toward a Systemic View to Cost Overrun Causation in Infrastructure Projects: A Review and Implications for Research , 2017 .

[37]  D. Pickrell A Desire Named Streetcar Fantasy and Fact in Rail Transit Planning , 1992 .

[38]  Steven C. Wheelwright,et al.  Forecasting methods and applications. , 1979 .

[39]  J N Chapulut,et al.  The new ex-post evaluation methods for large projects in France , 2005 .

[40]  J Hinze,et al.  ANALYSIS OF WSDOT CONSTRUCTION COST OVERRUNS. FINAL REPORT , 1991 .

[41]  Jin-Kyung Lee,et al.  Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports , 2008 .

[42]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[43]  Matti Siemiatycki,et al.  Academics and Auditors , 2009 .

[44]  Samuel Labi,et al.  An Analysis of Cost Overruns and Time Delays of INDOT Projects , 2004 .

[45]  Bent Flyvbjerg,et al.  Cost Overruns and Demand Shortfalls in Urban Rail and Other Infrastructure , 2007, 1303.7402.

[46]  Dejan Makovšek Public-Private Partnerships, Traditionally Financed Projects, and Their Price , 2013 .

[47]  David A. Mfinanga,et al.  Effect of Inadequate Design on Cost and Time Overrun of Road Construction Projects in Tanzania , 2014 .