Implementing an AGV System to Transport Finished Goods to the Warehouse

Article history: Received: 01 January, 2020 Accepted: 22 February, 2020 Online: 20 March, 2020 This work describes a case study carried out in an automotive company. The main objective was to increase the productivity of the last workstation of an assembly line by implementing an AGV System to transport finished goods to the warehouse. A comprehensive analysis of Value Added and Non-Value Added activities were performed to understand the current state of the workstation. By using the Spaghetti Diagram, the worker's movements were mapped and quantified. To eliminate motion and material transport and therefore increase productivity, an AGV system was implemented. To design this particular system, it was necessary to determine the required number of AGVs and their capacity, picking and delivery locations and the flow path. Activities such as transporting the containers and moving around to pick up the same containers were eliminated, thus contributing to a better ergonomics and an increase in safety. The Cycle Time was also reduced and therefore productivity was increased.

[1]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[2]  Brian H. Maskell,et al.  Performance Measurement for World Class Manufacturing: A Model for American Companies , 1991 .

[3]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[4]  Oliver Ilic,et al.  Analysis of the number of automated guided vehicles required in flexible manufacturing systems , 1994 .

[5]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[6]  Fred E. Meyers Motion and Time Study for Lean Manufacturing , 1998 .

[7]  William E. Youngdahl,et al.  “Lean” service: in defense of a production‐line approach , 1998 .

[8]  Richard J. Tersine,et al.  Customer‐aligned inventory strategies: agility maxims , 2000 .

[9]  Bing Jiang,et al.  An innovative scheme for product and process design , 2002 .

[10]  Vincent G. Duffy,et al.  Development of an Internet virtual layout system for improving workplace safety , 2003, Comput. Ind..

[11]  A. Graves,et al.  Implementing Lean in aerospace-challenging the assumptions and understanding the challenges , 2003 .

[12]  Philip Atkinson Creating and Implementing Lean Strategies , 2004 .

[13]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[14]  Jeffrey K. Liker,et al.  The Toyota way fieldbook : a practical guide for implementing Toyota's 4Ps , 2004 .

[15]  Henry C. W. Lau,et al.  An intelligent forward quality enhancement system to achieve product customization , 2005, Ind. Manag. Data Syst..

[16]  John P. S. Verver,et al.  Lean Six Sigma in Healthcare , 2006, Journal for healthcare quality : official publication of the National Association for Healthcare Quality.

[17]  M. Koster,et al.  A Review Of Design And Control Of Automated Guided Vehicle Systems , 2004 .

[18]  Saadettin Erhan Kesen,et al.  Simulation of automated guided vehicle (AGV) systems based on just-in-time (JIT) philosophy in a job-shop environment , 2007, Simul. Model. Pract. Theory.

[19]  John R. Miller David Black,et al.  The Toyota Way to Healthcare Excellence: Increase Efficiency and Improve Quality with Lean , 2008 .

[20]  D. Rogers,et al.  A framework of sustainable supply chain management: moving toward new theory , 2008 .

[21]  Abhijit Gosavi,et al.  Simulation-based optimization for determining AGV capacity in a manufacturing system , 2009 .

[22]  Ye Li,et al.  From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study , 2010 .

[23]  Pauline Found,et al.  The Journey to Lean , 2011 .

[24]  Harry Geerlings,et al.  A new method for assessing CO2-emissions from container terminals: a promising approach applied in Rotterdam , 2011 .

[25]  Vikas Rastogi,et al.  Implementation of 5S practices: A review , 2014 .

[26]  Anneke Fitzgerald,et al.  Applying lean flows in pathology laboratory remodelling. , 2014, Journal of health organization and management.

[27]  Jose Arturo Garza-Reyes,et al.  The impact of lean methods and tools on the operational performance of manufacturing organisations , 2014 .

[28]  Jeffrey S. Smith,et al.  Simulation for manufacturing system design and operation: Literature review and analysis , 2014 .

[29]  Gordon Wilmsmeier,et al.  Energy efficiency in maritime logistics chains , 2015 .

[30]  Hans-Otto Günther,et al.  The time-to-sustainability optimization strategy for sustainable supply network design , 2015 .

[31]  Hamed Fazlollahtabar,et al.  Mathematical optimization for earliness/tardiness minimization in a multiple automated guided vehicle manufacturing system via integrated heuristic algorithms , 2015, Robotics Auton. Syst..

[32]  R Pandey,et al.  Utilization of AGVs and Machines in FMS Environment , 2016 .

[33]  Huaqing Wu,et al.  Measuring performance of sustainable manufacturing with recyclable wastes: A case from China’s iron and steel industry , 2017 .