Establishment of a maintenance plan based on quantitative analysis in the context of RCM in a JIT production scenario

This paper presents a quantitative method for supporting the preparation or review of an equipment maintenance plan in a Just-in-time production scenario. The proposed method includes the following steps: (i) identifying the parts that influence reliability; (ii) surveying the failure rates and times to repair the parts; (iii) classification of parts according to the effect of their failures; (iv) surveying the line occupation parameters; (v) identifying the probability distributions for time to failure, time to repair, and line occupation; (vi) simulating the production and maintenance using the Monte Carlo approach; (vii) conducting a sensitivity analysis concerning variations in demand, MTTF, and MTTR; and (viii) establishing optimized intervals for preventive maintenance. The method is illustrated through an application in a labeling and filling gallons line at a paints and dyes production company. This method allowed the identification of critical parts as it relates to the productive scenario in question. The results can support companies in their decision making regarding the need and/or type of maintenance investment that would best fit an expected demand scenario.

[1]  Adel A. Ghobbar,et al.  Optimizing inspection intervals - Reliability and availability in terms of a cost model: A case study on railway carriers , 2013, Reliab. Eng. Syst. Saf..

[2]  Jesús Carretero,et al.  Applying RCM in large scale systems: a case study with railway networks , 2003, Reliab. Eng. Syst. Saf..

[3]  A. C. Márquez,et al.  The maintenance management framework : A practical view to maintenance management , 2008 .

[4]  Wagner Baracho dos Santos,et al.  Tempo ótimo entre manutenções preventivas para sistemas sujeitos a mais de um tipo de evento aleatório , 2007 .

[5]  R. Billinton,et al.  A Comprehensive Scheme for Reliability Centered Maintenance in Power Distribution Systems—Part I: Methodology , 2013, IEEE Transactions on Power Delivery.

[6]  Marvin Rausand,et al.  Reliability centered maintenance , 1998 .

[7]  Miguel J. Bagajewicz,et al.  New Tool for the Evaluation of the Scheduling of Preventive Maintenance for Chemical Process Plants , 2008 .

[8]  G. S. Yadava,et al.  Reliability‐centred maintenance applied to power plant auxiliaries , 1996 .

[9]  Marcello Braglia,et al.  Monte Carlo simulation approach for a modified FMECA in a power plant , 2000 .

[10]  J. P. Modak,et al.  Application of RCM to a medium scale industry , 2002, Reliab. Eng. Syst. Saf..

[11]  J. P. Modak,et al.  Maintenance strategy for tilting table of rolling mill based on reliability considerations , 2003, Reliab. Eng. Syst. Saf..

[12]  R. S. Lashkari,et al.  Machine reliability and preventive maintenance planning for cellular manufacturing systems , 2007, Eur. J. Oper. Res..

[13]  Anthony M. Smith,et al.  Reliability-Centered Maintenance , 1992 .

[14]  Luca Fumagalli,et al.  Maintenance management of railway infrastructures based on reliability analysis , 2012, Reliab. Eng. Syst. Saf..

[15]  Zeng Ming,et al.  Application of reliability-centered stochastic approach and FMECA to conditional maintenance of electric power plants in China , 2004, 2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings.

[16]  Laura Guitart Tarrés,et al.  Optimization of replacement stocks using a maintenance programme derived from reliability studies of production systems , 2002, Ind. Manag. Data Syst..

[17]  Helder Leite,et al.  Applying Reliability Centered Maintenance to a digital protective relay , 2012, 2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe).

[18]  Enrico A. Colosimo,et al.  Optimal Maintenance Time for Repairable Systems , 2007 .