Model for estimation of time and cost based on risk evaluation applied on tunnel projects

[1]  E. T. Brown,et al.  Underground excavations in rock , 1980 .

[2]  Dale F. Cooper,et al.  Model and Situation Specific O.R. Methods: Risk Engineering Reliability Analysis of an L.N.G. Facility , 1984 .

[3]  Francis T. Hartman,et al.  Risk Allocation in Lump-Sum Contracts — Concept of Latent Dispute , 1996 .

[4]  C. Fairhurst,et al.  The elasto-plastic response of underground excavations in rock masses that satisfy the Hoek-Brown failure criterion , 1999 .

[5]  Z. Bieniawski Engineering rock mass classifications , 1989 .

[6]  Herbert H. Einstein,et al.  COMPUTER BASED DECISION SUPPORT SYSTEMS FOR UNDERGROUND CONSTRUCTION. , 1987 .

[7]  Palle Thoft-Christensen,et al.  Structural Reliability Theory and Its Applications , 1982 .

[8]  Claes Alén On Probability in Geotechnics. Random Calculation Models Exemplified on Slope Stability Analysis and Ground-Superstructure Interaction , 1998 .

[9]  Karl-Olof Nylén,et al.  Cost of failure in a major civil engineering project , 1996 .

[10]  Ernest J. Henley,et al.  Reliability engineering and risk assessment , 1981 .

[11]  K Kovari PROBLEME DER GEBIRGSVERFORMUNG BEI DER ANWENDUNG VON VOLLVORTRIEBSMASCHINEN IM FELS , 1986 .

[12]  Hiroyoshi Kasa,et al.  EXPERIMENTAL STUDIES ON MONITORING OBSTACLES IN FRONT OF A SHIELD TUNNELING MACHINE USING AN ACOUSTIC WAVE AND RAYLEIGH WAVE , 1991 .

[13]  F Chiaverio,et al.  RISIKOANALYSE BEIM ADLERTUNNEL. LANGZEITVERHALTEN ALS KRITERIUM FUER DIE WAHL DES BAUVERFAHRENS , 1995 .

[14]  C. Charoenngam,et al.  Contractual risk and liability sharing in hydropower construction , 1999 .

[15]  G Drees,et al.  KALKULATION VON BAUPREISEN , 1993 .

[16]  Karl-Olof Nylén,et al.  Civil Works: Unique projects or a repeatable process? , 1999 .

[17]  Simon French,et al.  Decision Making: Descriptive, Normative, and Prescriptive Interactions , 1990 .

[18]  Kailash C. Kapur,et al.  Reliability in engineering design , 1977 .

[19]  F Moavenzadeh,et al.  TUNNEL COST MODEL , 1974 .

[20]  Bernhard Maidl Handbuch des Tunnel und Stollenbaus , 1984 .

[21]  Christopher M. Gordon,et al.  Choosing Appropriate Construction Contracting Method , 1994 .

[22]  S. Priest Discontinuity Analysis for Rock Engineering , 1992 .

[23]  E. Vanmarcke Probabilistic Modeling of Soil Profiles , 1977 .

[24]  Salazar Ledezma,et al.  Stochastic and economic evaluation of adaptability in tunneling design and construction , 1983 .

[25]  Georg Anagnostou,et al.  The face stability of slurry-shield-driven tunnels , 1994 .

[26]  John Reilly,et al.  OWNER RESPONSIBILITIES IN THE SELECTION OF TUNNEL BORING MACHINES, WITH REFERENCE TO CONTRACTUAL REQUIREMENTS AND CONSTRUCTION CONDITIONS Die Verantwortung des Bauherrn bei der Wahl von Schildmaschinen, mit Bezug auf Vertragsforderungen und bautechnische Verhältnisse , 1996 .

[27]  Nicholas Anthony Lanney,et al.  Statistical description of rock properties and sampling. , 1978 .

[28]  John A. Hudson,et al.  Discontinuity spacings in rock , 1976 .

[29]  Yacov Y. Haimes,et al.  Risk modeling, assessment, and management , 1998 .

[30]  L Martak HOCHDRUCKBODENVERMOERTELUNG AUS GRUNDBAUTECHNISCHER SICHT , 1986 .

[31]  Michael,et al.  Tunnel-construction in Germany: Current experience-report with selected examples , 1998 .

[32]  H. Hagedorn,et al.  Extreme deformation and damage during the construction of large tunnels , 1999 .

[33]  N. Cox Statistical Models in Engineering , 1970 .

[34]  Russell L. Ackoff,et al.  Introduction to operations research , 1957 .

[35]  Craig C. Sherbrooke,et al.  Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .

[36]  D. T. Snow,et al.  The frequency and apertures of fractures in rock , 1970 .

[37]  Amund Bruland,et al.  HARD ROCK TUNNEL BORING , 2000 .

[38]  Robert Sturk,et al.  Engineering geological information : its value and impact on tunnelling , 1998 .

[39]  P. Nelson,et al.  Uncertainty in the geologic environment : from theory to practice : proceedings of Uncertainty '96, July 31-August 3, 1996, Madison, Wisconsin , 1996 .

[40]  R. J. Robbins The Application Of Tunnel Boring Machines To Bad Rock Conditions , 1982 .

[41]  Nick Barton,et al.  Engineering classification of rock masses for the design of tunnel support , 1974 .

[42]  Walter Steiner,et al.  Face support for a large Mix-Shield in heterogeneous ground conditions , 1994 .

[43]  Hid N. Grouni,et al.  Reliability based design in civil engineering , 1988 .

[44]  F Quellmelz DIE NEUE OESTERREICHISCHE TUNNELBAUWEISE. TECHNISCHE UND WIRTSCHAFTLICHE EINSATZKRITERIEN FUER AUSGEWAEHLTE BETRIEBSMITTEL, SICHERUNGSELEMENTE UND BAUVERFAHREN , 1987 .

[45]  Georg Anagnostou,et al.  Face stability conditions with earth-pressure-balanced shields , 1996 .

[46]  Lawrence L. Kupper,et al.  Probability, statistics, and decision for civil engineers , 1970 .

[47]  J M Anderson WORLD WIDE RESEARCH POINTS TO THE NEED FOR NEW APPROACHES TO CONTROL TUNNELLING RISKS , 1997 .