Design of post-installed reinforcing bars as end anchorage or as bonded anchor
暂无分享,去创建一个
Rolf Eligehausen | Christoph Mahrenholtz | Hans-Wolf Reinhardt | H. Reinhardt | C. Mahrenholtz | R. Eligehausen
[1] Rolf Eligehausen,et al. Simulation of Tests on Cast-In and Postinstalled Column-to-Foundation Connections to Quantify the Effect of Cyclic Loading , 2016 .
[2] Kang Su Kim,et al. Shear Database for Reinforced Concrete Members without Shear Reinforcement , 2003 .
[3] J Schlaich,et al. TOWARD A CONSISTENT DESIGN OF STRUCTURAL CONCRETE , 1987 .
[4] R. Eligehausen,et al. Bewehrungsanschlüsse mit nachträglich eingemörtelten Bewehrungsstäben , 2002 .
[5] Ronald A. Cook,et al. Behavior and Design of Adhesive Bonded Anchors , 2006 .
[6] Youth,et al. Guide to good practice , 1993 .
[7] Norbert Randl,et al. Post-installed reinforcement connections at ultimate and serviceability limit states , 2014 .
[8] Stefano Pampanin,et al. Bridging the Gap between Design Provisions for Connections Using Anchorage or Strut- And Tie Models , 2014 .
[9] Christoph Mahrenholtz. Seismic bond model for concrete reinforcement and the application to column-to-foundation connections , 2012 .
[10] Aurelio Muttoni,et al. Fédération Internationale du Béton (fib), Model Code 2010 - First complete draft, chapters 7.3 and 7.13 , 2010 .
[11] Stefano Pampanin,et al. NEW DESIGN METHODOLOGY FOR SEISMIC COLUMN-TO-FOUNDATION ANCHORAGE CONNECTIONS , 2014 .