A short-term capacity trading method for semiconductor fabs with partnership
暂无分享,去创建一个
[1] Alfredo Vellido,et al. Neural networks in business: a survey of applications (1992–1998) , 1999 .
[2] W. Hopp,et al. Using an optimized queueing network model to support wafer fab design , 2002 .
[3] David D. Yao,et al. A queueing network model for semiconductor manufacturing , 1996 .
[4] S. DeBoo. Block cross processing: an innovative approach to constraint management , 2000, Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130).
[5] Laurene V. Fausett,et al. Fundamentals Of Neural Networks , 1993 .
[6] Navdeep S. Grewal,et al. Integrating targeted cycle-time reduction into the capital planning process , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[7] Muh-Cherng Wu,et al. A tool planning approach considering cycle time constraints and demand uncertainty , 2005 .
[8] Hark Hwang,et al. Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility , 2003 .
[9] Bülent Çatay,et al. Tool capacity planning in semiconductor manufacturing , 2003, Comput. Oper. Res..
[10] Gerald W. Evans,et al. Multicriteria design of manufacturing systems through simulation optimization , 1994 .
[11] Stuart Bermon,et al. Capacity planning under demand uncertainty for semiconductor manufacturing , 2003 .
[12] Wen Lea Pearn,et al. Analytic network process (ANP) approach for product mix planning in semiconductor fabricator , 2005 .
[13] Wen Lea Pearn,et al. Product Mix Optimization for Semiconductor Manufacturing Based on AHP and ANP Analysis , 2005 .
[14] Jayashankar M. Swaminathan. Tool capacity planning for semiconductor fabrication facilities under demand uncertainty , 2000, Eur. J. Oper. Res..
[15] Yon-Chun Chou,et al. A methodology for product mix planning in semiconductor foundry manufacturing , 2000 .
[16] Jayashankar M. Swaminathan,et al. Tool procurement planning for wafer fabrication facilities: a scenario-based approach , 2002 .
[17] Yoshio Iwata,et al. Multi-objective capacity planning for agile semiconductor manufacturing , 2003 .
[18] Jonathan F. Bard,et al. AN OPTIMIZATION APPROACH TO CAPACITY EXPANSION IN SEMICONDUCTOR MANUFACTURING FACILITIES , 1999 .
[19] S. D. Wu,et al. Semiconductor capacity planning: stochastic modelingand computational studies , 2002 .
[20] Liang-Hsuan Chen,et al. An intelligent interface between symbolic and numeric analysis tools required for the development of an integrated CAD system , 1996 .
[21] WALLACE J. HOPP,et al. Using an optimized queueing network model to support wafer fab design , 2002 .
[22] Stuart Bermon,et al. Capacity Optimization Planning System (CAPS) , 1999, Interfaces.
[23] Dorothea Heiss-Czedik,et al. An Introduction to Genetic Algorithms. , 1997, Artificial Life.
[24] Chiuhsiang Joe Lin,et al. Capacity planning with capability for multiple semiconductor manufacturing fabs , 2005, Comput. Ind. Eng..
[25] Oktay Günlük,et al. Robust capacity planning in semiconductor manufacturing , 2005 .
[26] H. Toba,et al. Dynamic load balancing among multiple fabrication lines through estimation of minimum inter-operation time , 2005, IEEE Transactions on Semiconductor Manufacturing.
[27] S. D. Wu,et al. Managing Capacity in the High-Tech Industry: A Review of Literature , 2005 .