A short-term capacity trading method for semiconductor fabs with partnership

This paper presents a capacity trading method for two semiconductor fabs that have established a capacity-sharing partnership. A fab that is predicted to have insufficient capacity at some workstations in a short-term period (e.g. one week) could purchase tool capacity from its partner fab. The population of such a capacity-trading portfolio may be quite huge. The proposed method involves three modules. We first use discrete-event simulation to identify the trading population. Secondly, some randomly sampled trading portfolios with their performance measured by simulation are used to develop a neural network, which can efficiently evaluate the performance of a trading portfolio. Thirdly, a genetic algorithm (GA) embedded with the developed neural network is used to find a near-optimal trading portfolio from the huge trading population. Experiment results indicate that the proposed trading method outperforms two other benchmarked methods in terms of number of completed operations, number of wafer outs, and mean cycle time.

[1]  Alfredo Vellido,et al.  Neural networks in business: a survey of applications (1992–1998) , 1999 .

[2]  W. Hopp,et al.  Using an optimized queueing network model to support wafer fab design , 2002 .

[3]  David D. Yao,et al.  A queueing network model for semiconductor manufacturing , 1996 .

[4]  S. DeBoo Block cross processing: an innovative approach to constraint management , 2000, Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130).

[5]  Laurene V. Fausett,et al.  Fundamentals Of Neural Networks , 1993 .

[6]  Navdeep S. Grewal,et al.  Integrating targeted cycle-time reduction into the capital planning process , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[7]  Muh-Cherng Wu,et al.  A tool planning approach considering cycle time constraints and demand uncertainty , 2005 .

[8]  Hark Hwang,et al.  Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility , 2003 .

[9]  Bülent Çatay,et al.  Tool capacity planning in semiconductor manufacturing , 2003, Comput. Oper. Res..

[10]  Gerald W. Evans,et al.  Multicriteria design of manufacturing systems through simulation optimization , 1994 .

[11]  Stuart Bermon,et al.  Capacity planning under demand uncertainty for semiconductor manufacturing , 2003 .

[12]  Wen Lea Pearn,et al.  Analytic network process (ANP) approach for product mix planning in semiconductor fabricator , 2005 .

[13]  Wen Lea Pearn,et al.  Product Mix Optimization for Semiconductor Manufacturing Based on AHP and ANP Analysis , 2005 .

[14]  Jayashankar M. Swaminathan Tool capacity planning for semiconductor fabrication facilities under demand uncertainty , 2000, Eur. J. Oper. Res..

[15]  Yon-Chun Chou,et al.  A methodology for product mix planning in semiconductor foundry manufacturing , 2000 .

[16]  Jayashankar M. Swaminathan,et al.  Tool procurement planning for wafer fabrication facilities: a scenario-based approach , 2002 .

[17]  Yoshio Iwata,et al.  Multi-objective capacity planning for agile semiconductor manufacturing , 2003 .

[18]  Jonathan F. Bard,et al.  AN OPTIMIZATION APPROACH TO CAPACITY EXPANSION IN SEMICONDUCTOR MANUFACTURING FACILITIES , 1999 .

[19]  S. D. Wu,et al.  Semiconductor capacity planning: stochastic modelingand computational studies , 2002 .

[20]  Liang-Hsuan Chen,et al.  An intelligent interface between symbolic and numeric analysis tools required for the development of an integrated CAD system , 1996 .

[21]  WALLACE J. HOPP,et al.  Using an optimized queueing network model to support wafer fab design , 2002 .

[22]  Stuart Bermon,et al.  Capacity Optimization Planning System (CAPS) , 1999, Interfaces.

[23]  Dorothea Heiss-Czedik,et al.  An Introduction to Genetic Algorithms. , 1997, Artificial Life.

[24]  Chiuhsiang Joe Lin,et al.  Capacity planning with capability for multiple semiconductor manufacturing fabs , 2005, Comput. Ind. Eng..

[25]  Oktay Günlük,et al.  Robust capacity planning in semiconductor manufacturing , 2005 .

[26]  H. Toba,et al.  Dynamic load balancing among multiple fabrication lines through estimation of minimum inter-operation time , 2005, IEEE Transactions on Semiconductor Manufacturing.

[27]  S. D. Wu,et al.  Managing Capacity in the High-Tech Industry: A Review of Literature , 2005 .