Korean high heat flux test facility by using electron beam system for ITER first wall semi-prototype
暂无分享,去创建一个
[1] Dong Won Lee,et al. Fabrication and high heat flux test of large mockups for ITER first wall semi-prototype , 2011 .
[2] Dong Won Lee,et al. Heat flux tests of the ITER first Wall qualification mockups at KoHLT-1 , 2011 .
[3] Y. Jung,et al. Ion-beam assisted deposition of coating interlayers for the joining of Be/CuCrZr , 2010 .
[4] Dong Won Lee,et al. Overview of Korea heat load test facilities for plasma facing components , 2010 .
[5] Dong Won Lee,et al. Experiment and analysis of hypervapotron mock-ups for preparing the 2nd qualification of the ITER blanket first wall , 2010 .
[6] Dong Won Lee,et al. Design evaluation of the semi-prototype for the ITER blanket first wall qualification , 2010 .
[7] Dong Won Lee,et al. High Heat Flux Test with HIP Bonded 50x50 Be/Cu Mock-Ups for the ITER First Wall , 2009 .
[8] Dong Won Lee,et al. Development of a High Heat Flux Test Facility for Plasma Facing Components , 2009 .
[9] Dong Won Lee,et al. Fabrication of Be/CuCrZr/SS mock-ups for ITER first wall , 2009 .
[10] I. Mazul,et al. Development of fabrication technology and investigation of properties of steel-to-bronze joints suggested for ITER HHF components , 2009 .
[11] Dong Won Lee,et al. High heat flux test with HIP bonded Be/Cu mock-ups for the ITER first wall , 2008, 2009 23rd IEEE/NPSS Symposium on Fusion Engineering.
[12] J. M. McDonald,et al. The Sandia Plasma Materials Test Facility in 2007 , 2008 .
[13] R. Duwe,et al. The new electron beam test facility JUDITH II for high heat flux experiments on plasma facing components , 2005 .
[14] F. Escourbiac,et al. Testing of actively cooled mock-ups in several high heat flux facilities—An International Round Robin Test , 2005 .