The impacts on freight train operational performance of new rail infrastructure to segregate passenger and freight traffic

Abstract Rail freight has an important role to play in improving the resource efficiency and sustainability of freight transport within the supply chain. The British rail network has seen considerable growth of both freight and passenger activity in the last 20 years, leading to concerns about its capacity to absorb continued growth. A number of infrastructure initiatives focused on increasing capacity and reducing conflicts have been implemented. This includes the North Doncaster Chord, opened in June 2014 primarily to provide a more direct route from the port of Immingham to the major Aire Valley power stations (i.e. Drax, Eggborough and Ferrybridge). The paper analyses the freight impacts of the new chord, focusing on three key operational measures (i.e. train routing, scheduled journey times and train punctuality) during 10-week survey periods before and after the opening of the chord. The analysis is based on real-time data relating to coal and biomass trains operating between Immingham and the three power stations. This is a novel approach as the data have been made publicly available only recently, allowing a detailed investigation of the flows on this corridor at a highly disaggregated level. The use of this empirical method to assess the detailed rail freight operational impacts is an important element in the process of evaluating the effects of network enhancement. The results demonstrate improvements in each of the three operational measures, but also reveal a situation considerably more complex than that suggested by the published material relating to the justification for this new infrastructure.

[1]  Gregory Rowangould,et al.  Public financing of private freight rail infrastructure to reduce highway congestion: A case study of public policy and decision making in the United States , 2013 .

[2]  Thoroddur Bjarnason,et al.  The effects of road infrastructure improvement on work travel in Northern Iceland , 2014 .

[3]  A. Samimi,et al.  A behavioral analysis of freight mode choice decisions , 2011 .

[4]  Allan G. Woodburn,et al.  Effects of rail network enhancement on port hinterland container activity: a United Kingdom case study , 2013 .

[5]  Zhixiang Fang,et al.  Impacts of high speed rail on railroad network accessibility in China , 2014 .

[6]  Elise Miller-Hooks,et al.  Freight train scheduling with elastic demand , 2010 .

[7]  Elise Miller-Hooks,et al.  Measuring and maximizing resilience of freight transportation networks , 2012, Comput. Oper. Res..

[8]  Alan De Burton Delivering a sustainable railway , 2007 .

[9]  Erhan Kozan,et al.  Optimising a coal rail network under capacity constraints , 2011 .

[10]  Nils O.E. Olsson Impact Analysis of Railway Projects in a Flexibility Perspective , 2006 .

[11]  Paolo Toth,et al.  Scheduling extra freight trains on railway networks , 2010 .

[12]  Camille Morvant,et al.  Challenges Raised by Freight for the Operations Planning of a Shared-Use Rail Network. A French Perspective , 2014 .

[13]  Chase Rainwater,et al.  Vulnerability assessment and re-routing of freight trains under disruptions: A coal supply chain network application , 2014 .

[14]  Franklin Farell Roadmap to a Single European Transport Area: Towards a competitive and resource efficient transport system , 2014 .

[15]  T. T. Narendran,et al.  Freight Train Routing and Scheduling in a passenger rail Network: Computational Complexity and the Stepwise Dispatching Heuristic , 2007, Asia Pac. J. Oper. Res..

[16]  Miguel A. Salido,et al.  An Assessment of Railway Capacity , 2008 .