Fuzzy logic-based scheduling of rail vehicles under reduced traffic flow conditions
暂无分享,去创建一个
[1] Gaurav Yadav,et al. Decision Support Model for Automated Railway Level Crossing System Using Fuzzy Logic Control , 2015 .
[2] Martin Lowson,et al. Sustainable personal transport , 2002 .
[3] Mohamed B. Trabia,et al. A two-stage fuzzy logic controller for traffic signals , 1999 .
[4] Hirokazu Ihara,et al. A Fuzzy Control for Train Automatic Stop Control , 1983 .
[5] James P. Denier,et al. An Introduction to Programming and Numerical Methods in MATLAB , 2005 .
[6] P ? ? ? ? ? ? ? % ? ? ? ? , 1991 .
[7] Bart De Schutter,et al. Freeway Traffic Management and Control , 2009, Encyclopedia of Complexity and Systems Science.
[8] Annegret H. Thieken,et al. Risk reduction partnerships in railway transport infrastructure in an alpine environment , 2019, International Journal of Disaster Risk Reduction.
[9] T. Lakshmi prasanna,et al. Multi- Sensor Fuzzy Logic Based Train Collision Avoidance System , 2017 .
[10] Chih-Hsun Chou,et al. A fuzzy logic controller for traffic junction signals , 2002, Inf. Sci..
[11] Robert Hoyer,et al. An advanced fuzzy controller for traffic lights , 1994 .
[12] D. Branston. Models of Single Lane Time Headway Distributions , 1976 .
[13] Piotr Muszynski,et al. Conceptual Design and Accomplishment of a Steel Guideway for the Personal Rapid Transit at Heathrow Airport in London, UK , 2011 .
[14] Martin Lowson,et al. PERSONAL PUBLIC TRANSPORT. , 1999 .
[15] L K Siu. A Review of Alternative and Innovative Transit Systems , 2006 .
[16] Martin Lowson. New Approach to Effective and Sustainable Urban Transport , 2003 .
[17] Pratibha Mishra,et al. Advanced Engineering Mathematics , 2013 .