Prediction of Long-Term Deflections for High-Speed Railway Prestressed Concrete Beams
暂无分享,去创建一个
[1] L D Martin. RATIONAL METHOD FOR ESTIMATING CAMBER AND DEFLECTION OF PRECAST PRESTRESSED MEMBERS , 1977 .
[3] N. J. Gardner,et al. Design Provisions for Drying Shrinkage and Creep of Normal-Strength Concrete , 2001 .
[4] Wolfgang Markus,et al. Slab Track Gets to the Root of Stability , 2006 .
[5] P. Zou. Theoretical Study on Short-Term and Long-Term Deflections of Fiber Reinforced Polymer Prestressed Concrete Beams , 2003 .
[6] S. Parivallal,et al. Long-Term Prestress Loss and Camber of Box-Girder Bridge , 2014, ACI Structural Journal.
[7] Comite Euro-International du Beton,et al. CEB-FIP Model Code 1990 , 1993 .
[8] A F Shaikh,et al. NON-TENSIONED STEEL IN PRESTRESSED CONCRETE BEAMS , 1970 .
[9] Masatoshi Hatoko,et al. Reevaluation of Japanese high-speed rail construction - Recent situation of the north corridor Shinkansen and its way to completion , 2007 .
[10] K. M. Kripanarayanan,et al. LOSS OF PRESTRESS, CAMBER AND DEFLECTION OF NON-COMPOSITE AND COMPOSITE PRESTRESSED CONCRETE STRUCTURES , 1971 .
[11] Weiqi Wang,et al. Creep Behavior of High-Speed Railway Prestressed Concrete Girders for 500 Days , 2011 .