Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds

Abstract As modern methods of construction progressively incorporate more facets of manufacturing, design optimization tools used in manufacturing can be adopted into construction to solve complex challenges. The specification and control of dimensions and geometry of construction assemblies is one such challenge that can be solved using tools from manufacturing. Even with building information models (BIM) to assist with clash detection for identifying potential dimensional problems, or the use of tolerances to control critical features in an assembly, dimensional variability is still a complex challenge to address in construction. This paper explores the use of a dimensional variation analysis (DVA), which is a design optimization tool from the manufacturing industry. This paper presents a DVA approach which is based on kinematics theory in robotics to define the assembly equation (how components are dimensionally related to each other). A case study is used to validate the proposed framework through two distinct approaches: (1) an as-designed (model-based) DVA and (2) an as-built (laser-based) DVA. Comparison of these two methods resulted in a percent difference less than 1% which demonstrates the reliability of using the model-based method for designing critical construction components.

[1]  Burcu Akinci,et al.  Analysis of modeling effort and impact of different levels of detail in building information models , 2011 .

[2]  Makarand Hastak,et al.  Integration of the Construction Knowledge and Expertise in Front-End Planning , 2016 .

[3]  David Kent Ballast Handbook of construction tolerances , 1990 .

[4]  Carl T. Haas,et al.  Automatic Realignment of Defective Assemblies Using an Inverse Kinematics Analogy , 2016, J. Comput. Civ. Eng..

[5]  Anne Landin,et al.  Use of cognitive mapping in the diagnosis of tolerance failure , 2011 .

[6]  Carl T. Haas,et al.  Parallel Systems and Structural Frames Realignment Planning and Actuation Strategy , 2016, J. Comput. Civ. Eng..

[7]  Iris D. Tommelein,et al.  APPLICATION OF TOLERANCE MAPPING IN AEC SYSTEMS , 2005 .

[8]  Tapas Acharjee Investigating Accumulation of Tolerances and its Impact on Reliability of Job Site Installation , 2007 .

[9]  Fritz Scholz Tolerance Stack Analysis Methods , 1995 .

[10]  Atanas A. Popov,et al.  Dimensional variation propagation analysis in straight-build mechanical assemblies using a probabilistic approach , 2013 .

[11]  Anne Landin,et al.  Industrializing the construction sector through innovation – Tolerance Dilemma , 2007 .

[12]  Kenneth W. Chase,et al.  A survey of research in the application of tolerance analysis to the design of mechanical assemblies , 1991 .

[13]  S. V. Sreenivasan,et al.  Position error modeling for automated construction manipulators , 2004 .

[14]  Y. S. Hong,et al.  A comprehensive review of tolerancing research , 2002 .

[15]  Salman Azhar,et al.  Building information modelling (BIM): now and beyond , 2012 .

[16]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[17]  J. Reich,et al.  Methodology for dimensional variation analysis of ITER integrated systems , 2016 .

[18]  J.S. Goulding,et al.  New offsite production and business models in construction: priorities for the future research agenda , 2015 .

[19]  Michael J. Horman,et al.  Organizing Constructability Knowledge for Design , 2005 .

[20]  Pingbo Tang,et al.  A Spatial‐Context‐Based Approach for Automated Spatial Change Analysis of Piece‐Wise Linear Building Elements , 2016, Comput. Aided Civ. Infrastructure Eng..

[21]  Jean-Jacques Cordier,et al.  Status of ITER dimensional tolerance studies , 2013 .

[22]  Matt Lombard,et al.  Dimensioning and Tolerancing , 2013 .

[23]  Iris D. Tommelein,et al.  Tolerance and Constructability of Soldier Piles in Slurry Walls , 2010 .

[24]  P. G. Leaney,et al.  The Use of a Kinematic Constraint Map to Prepare the Structure for a Dimensional Variation Analysis Model , 2013 .

[25]  Anne Landin,et al.  Identifying causes of additional costs in tolerance compliances failure in buildings , 2010 .

[26]  Clifton B. Farnsworth,et al.  Application, Advantages, and Methods Associated with Using BIM in Commercial Construction , 2015 .

[27]  Martin Fischer,et al.  Supporting the constructability review with 3D/4D models , 2007 .

[28]  Carl T. Haas,et al.  Automated assembly discrepancy feedback using 3D imaging and forward kinematics , 2015 .

[29]  Carl T. Haas,et al.  Automated 3D compliance checking in pipe spool fabrication , 2014, Adv. Eng. Informatics.

[30]  Yong Xiao,et al.  Vision guided autonomous robotic assembly and as-built scanning on unstructured construction sites , 2015 .

[31]  J. Denavit,et al.  A kinematic notation for lower pair mechanisms based on matrices , 1955 .