An integrated inventory model for a deteriorating item with allowable shortages and credit linked wholesale price

[1]  Bibhas Chandra Giri,et al.  Lot sizing and unequal-sized shipment policy for an integrated production-inventory system , 2014, Int. J. Syst. Sci..

[2]  Christoph H. Glock,et al.  A closed-loop supply chain for deteriorating products under stochastic container return times , 2014 .

[3]  Christoph H. Glock,et al.  A note on: Optimal ordering policy for stock-dependent demand under progressive payment scheme , 2014, Eur. J. Oper. Res..

[4]  R. Uthayakumar,et al.  Two-echelon inventory model for deteriorating items with credit period dependent demand including shortages under trade credit , 2013, Optim. Lett..

[5]  L. Ouyang,et al.  Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging , 2013 .

[6]  Barun Das,et al.  Integrated supply chain model for a deteriorating item with procurement cost dependent credit period , 2013, Comput. Ind. Eng..

[7]  Chandra K. Jaggi,et al.  Credit financing in economic ordering policies for defective items with allowable shortages , 2013, Appl. Math. Comput..

[8]  Chia-Hsien Su Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit , 2012 .

[9]  Christoph H. Glock,et al.  A comparison of alternative delivery structures in a dual sourcing environment , 2012 .

[10]  Yu-Jen Lin,et al.  A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items , 2012, Appl. Math. Comput..

[11]  C. Glock The joint economic lot size problem: A review , 2012 .

[12]  Victor B. Kreng,et al.  Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy , 2011, Expert Syst. Appl..

[13]  Saeed Zolfaghari,et al.  A review of the extensions of a modified EOQ model for imperfect quality items , 2011 .

[14]  Christoph H. Glock,et al.  A multiple-vendor single-buyer integrated inventory model with a variable number of vendors , 2011, Comput. Ind. Eng..

[15]  Liang-Hsuan Chen,et al.  Integrated inventory models considering permissible delay in payment and variant pricing strategy , 2010 .

[16]  Jun Li,et al.  A replenishment policy with defective products, backlog and delayof payments , 2009 .

[17]  Jinn-Tsair Teng,et al.  An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity , 2009, Eur. J. Oper. Res..

[18]  Zaid T. Balkhi,et al.  On the optimality of a variable parameters inventory model for deteriorating items under trade credit policy , 2008 .

[19]  Yu-Chung Tsao,et al.  Dynamic pricing, promotion and replenishment policies for a deteriorating item under permissible delay in payments , 2008, Comput. Oper. Res..

[20]  B. Maddah,et al.  Economic order quantity for items with imperfect quality: Revisited , 2008 .

[21]  Hui-Ming Wee,et al.  Scheduling and replenishment plan for an integrated deteriorating inventory model with stock-dependent selling rate , 2008 .

[22]  S. Papachristos,et al.  Economic ordering quantity models for items with imperfect quality , 2006 .

[23]  Chao-Kuei Huang An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration , 2004 .

[24]  L. Ouyang,et al.  AN EOQ MODEL FOR DETERIORATING ITEMS UNDER SUPPLIER CREDITS LINKED TO ORDERING QUANTITY , 2003 .

[25]  Hung-Chi Chang,et al.  Fuzzy opportunity cost for EOQ model with quality improvement investment , 2003, Int. J. Syst. Sci..

[26]  M. Javad Paknejad,et al.  Quality improvement and setup reduction in the joint economic lot size model , 2002, Eur. J. Oper. Res..

[27]  Liang-Yuh Ouyang,et al.  Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process , 2002, Comput. Oper. Res..

[28]  S. K. Goyal,et al.  Recent trends in modeling of deteriorating inventory , 2001, Eur. J. Oper. Res..

[29]  S. K. Goyal,et al.  On improving the single-vendor single-buyer integrated production inventory model with a generalized policy , 2000, Eur. J. Oper. Res..

[30]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[31]  Roger M. Hill,et al.  The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .

[32]  B. Sarker,et al.  An ordering policy for deteriorating items with allowable shortage and permissible delay in payment , 1997 .

[33]  R. Hill The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .

[34]  M. Petersen,et al.  Trade Credit: Theories and Evidence , 1996 .

[35]  Suresh Kumar Goyal,et al.  A one-vendor multi-buyer integrated inventory model: A comment , 1995 .

[36]  Lu Lu A one-vendor multi-buyer integrated inventory model , 1995 .

[37]  S. Aggarwal,et al.  Ordering Policies of Deteriorating Items under Permissible Delay in Payments , 1995 .

[38]  Philip M. Wolfe,et al.  An inventory model for deteriorating items , 1991 .

[39]  Xin Zhang,et al.  Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .

[40]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[41]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[42]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[43]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[44]  S. Goyal Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .

[45]  D. W. Kim,et al.  The Price and Production Level of the Deteriorating Inventory System. , 1983 .

[46]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .