A modified fuzzy credibility constrained programming approach for agricultural water resources management—A case study in Urumqi, China

In this study, a modified fuzzy credibility constrained programming (MFCCP) model is developed for agricultural irrigation systems management under uncertainty. The developed MFCCP model incorporates fuzzy programming and credibility constrained programming into a modelling framework, which can solve the problems associated with uncertain parameters in fuzzy decision space when their stochastic distribution information are unavailable. Optimal schemes can be obtained in the combination of different credibility levels and various contributions from possibility and necessity to credibility. The MFCCP model is applied to a real case study in the agricultural areas of Wulabo lowland in Urumqi, which is a typical arid region in Northwest China. The results indicate that the credibility level intensely affects system net benefit, especially when it varies from 1 to 0.9. Water allocation to all crops decreases with the increasing credibility level, which is the major reason for the total benefit's shrink. The developed model can effectively specify the variety of uncertainties through provision of additional λ information, which represents the possibility of satisfying the objective and constraints and corresponds to the decision makers’ preference regarding the tradeoffs between system benefits and reliability levels. Moreover, significantly different management strategies exist under various contribution rates of possibility and necessity to credibility, therefore the model can be adjusted according to various considerations, besides, much optimal and applicable management strategies can be expected through identifying the most appropriate contribution rate for possibility and necessity to credibility.

[1]  Li He,et al.  Design of optimal groundwater remediation systems under flexible environmental-standard constraints , 2014, Environmental Science and Pollution Research.

[2]  Risto Lahdelma,et al.  Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production , 2008, Eur. J. Oper. Res..

[3]  Baoding Liu,et al.  Chance constrained programming with fuzzy parameters , 1998, Fuzzy Sets Syst..

[4]  Ajay Singh,et al.  Simulation–optimization modeling for conjunctive water use management , 2014 .

[5]  Hongwei Lu,et al.  An interactive inexact fuzzy bounded programming approach for agricultural water quality management , 2014 .

[6]  Guohe Huang,et al.  Integer fuzzy credibility constrained programming for power system management , 2012 .

[7]  E. Frind,et al.  An integrated approach for addressing uncertainty in the delineation of groundwater management areas. , 2013, Journal of contaminant hydrology.

[8]  Hongwei Lu,et al.  An inexact rough-interval fuzzy linear programming method for generating conjunctive water-allocation strategies to agricultural irrigation systems , 2011 .

[9]  Baoding Liu,et al.  Standby redundancy optimization problems with fuzzy lifetimes , 2005, Comput. Ind. Eng..

[10]  M. B. Beck,et al.  Water quality modeling: A review of the analysis of uncertainty , 1987 .

[11]  Krishna K. Shrestha,et al.  A common-pool resource approach for water quality management: An Australian case study , 2008 .

[12]  Li He,et al.  Simulation-Based Inexact Rough-Interval Programming for Agricultural Irrigation Management: A Case Study in the Yongxin County, China , 2012, Water Resources Management.

[13]  Yian-Kui Liu,et al.  Expected value of fuzzy variable and fuzzy expected value models , 2002, IEEE Trans. Fuzzy Syst..

[14]  Doron Lavee The effect of water supply uncertainty on farmers’ choice of crop portfolio , 2010 .

[15]  S. Simonovic,et al.  Global water resources modeling with an integrated model of the social-economic-environmental system , 2011 .

[16]  Stefano Pallottino,et al.  A DSS for water resources management under uncertainty by scenario analysis , 2005, Environ. Model. Softw..

[17]  P. Zaag,et al.  Water allocation and management in an emerging spate irrigation system in Makanya catchment, Tanzania , 2011 .

[18]  Li He,et al.  A fuzzy inexact two-phase programming approach to solving optimal allocation problems in water resources management , 2014 .

[19]  Ping Guo,et al.  Fuzzy multi-objective linear programming applying to crop area planning , 2010 .

[20]  G. Huang,et al.  A stochastic optimization model under modeling uncertainty and parameter certainty for groundwater remediation design--part I. Model development. , 2010, Journal of hazardous materials.

[21]  Xiaoxia Huang,et al.  Credibility-based chance-constrained integer programming models for capital budgeting with fuzzy parameters , 2006, Inf. Sci..

[22]  D. Dubois,et al.  When upper probabilities are possibility measures , 1992 .

[23]  Guohe Huang,et al.  Fuzzy Robust Credibility-Constrained Programming for Environmental Management and Planning , 2010, Journal of the Air & Waste Management Association.

[24]  Li He,et al.  Stochastic goal programming based groundwater remediation management under human-health-risk uncertainty. , 2014, Journal of hazardous materials.