Scheduling economic lot sizes in deteriorating production systems
暂无分享,去创建一个
Ilkyeong Moon | Won Young Yun | B. C. Giri | B. Giri | W. Yun | I. Moon
[1] Robin O. Roundy,et al. Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .
[2] Fred Hanssmann. Operations research in production and inventory control , 1962 .
[3] J. Bert Keats,et al. Statistical Methods for Reliability Data , 1999 .
[4] E. Silver. Deliberately slowing down output in a family production context , 1990 .
[5] L. J. Thomas,et al. Lot Sizing and Sequencing for N Products on One Facility , 1977 .
[6] Moutaz Khouja. A note on 'deliberately slowing down output in a family production context' , 1999 .
[7] Zbigniew Michalewicz,et al. The use of genetic algorithms to solve the economic lot size scheduling problem , 1998, Eur. J. Oper. Res..
[8] Chul Lee,et al. The effect of the stabilization period on the economic lot scheduling problem , 1998 .
[9] Robert W. Haessler,et al. Note---A Note on the Single-Machine Multi-Product Lot Scheduling Problem , 1976 .
[10] Mohamed Ben-Daya,et al. Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .
[11] D. Simchi-Levi,et al. Controllable production rates in a family production context , 1991 .
[12] Gordon Johnston,et al. Statistical Models and Methods for Lifetime Data , 2003, Technometrics.
[13] William L. Maxwell,et al. The scheduling of economic lot sizes , 1964 .
[14] Paul H. Zipkin. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..
[15] M Ben-Daya,et al. Economic lot scheduling problem with imperfect production processes , 2000, J. Oper. Res. Soc..
[16] I. Moon. Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions , 1994 .
[17] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[18] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[19] G. Gallego,et al. The economic lot scheduling problem with finite backorder costs , 1992 .
[20] 문일경. Multiproduct Economic Lot Size Models with Investment Costs for Setup Reduction and Quality Improvement , 1994 .
[21] Gregory Dobson,et al. The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..
[22] G. Gallego,et al. Strategic investment to reduce setup times in the economic lot scheduling problem , 1995 .
[23] Elsayed A. Elsayed,et al. Reliability Engineering , 1996 .
[24] P. C. Jones,et al. When Is The Economic Lot Scheduling Problem Easy , 1989 .
[25] Guillermo Gallego. An Extension to the Class of Easy Economic Lot Scheduling Problems , 1990 .
[26] Ilkyeong Moon,et al. The Effect of Externalizing Setups in the Economic Lot Scheduling Problem , 1992, Oper. Res..
[27] W. Nelson. Statistical Methods for Reliability Data , 1998 .
[28] W. Hsu. On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .
[29] Robin O. Roundy,et al. The Extended Economic Lot Scheduling Problem , 1988 .
[30] Edward A. Silver,et al. Hybrid genetic algorithm for the economic lot-scheduling problem , 2002 .
[31] Fayez F. Boctor. The G-group heuristic for single machine lot scheduling , 1987 .
[32] Guillermo Gallego. Reduced production rates in the economic lot scheduling problem , 1993 .
[33] Moutaz Khouja,et al. The scheduling of economic lot sizes on volume flexible production systems , 1997 .
[34] Dong X. Shaw,et al. Complexity of the ELSP with general cyclic schedules , 1997 .