Performance Comparison of Some Classes of Flexible Flow Shops and Job Shops
暂无分享,去创建一个
[1] Linda Hendry. Flexible Manufacturing Systems – The Technology and Management , 1993 .
[2] Chris N. Potts,et al. Scheduling a two-stage hybrid flow shop with parallel machines at the first stage , 1997, Ann. Oper. Res..
[3] J. Gupta,et al. Schedules for a two-stage hybrid flowshop with parallel machines at the second stage , 1991 .
[4] George L. Vairaktarakis,et al. Flowshops with processing flexibility across production stages , 1998 .
[5] Kathryn E. Stecke,et al. Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, held at the University of Michigan, Ann Arbor, MI, U.S.A., August 12-15, 1986 , 1986 .
[6] Kathryn E. Stecke,et al. Planning and scheduling approaches to operate a particular FMS , 1992 .
[7] Chelliah Sriskandarajah,et al. Scheduling algorithms for flexible flowshops: Worst and average case performance , 1988 .
[8] Reza A. Maleki. Flexible Manufacturing Systems , 1990 .
[9] J. Erschler,et al. Steady state scheduling of a flexible manufacturing system with periodic releasing and flow time constraints , 1985 .
[10] Michael A. Langston,et al. Interstage Transportation Planning in the Deterministic Flow-Shop Environment , 1987, Oper. Res..
[11] Upendra Dave,et al. Heuristic Scheduling Systems , 1993 .
[12] Kathryn E. Stecke,et al. Design, planning, scheduling, and control problems of flexible manufacturing systems , 1985 .
[13] Marius M. Solomon,et al. A computational study of heuristics for two-stage flexible flowshops , 1996 .
[14] Jatinder N. D. Gupta,et al. Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .
[15] Chelliah Sriskandarajah,et al. Some no-wait shops scheduling problems: Complexity aspect , 1986 .
[16] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[17] Michael H. Rothkopf. Scheduling with Random Service Times , 1966 .
[18] George L. Vairaktarakis,et al. Minimizing makespan in hybrid flowshops , 1994, Oper. Res. Lett..
[19] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[20] Seetuarma L. Narastmhan,et al. Scheduling in a two-stage manufacturing process , 1984 .
[21] R. J. Paul. A Production Scheduling Problem in the Glass-Container Industry , 1979, Oper. Res..
[22] Kripa Shanker,et al. A loading and dispatching problem in a random flexible manufacturing system , 1985 .
[23] T.C.E. Cheng,et al. A state-of-the-art review of parallel-machine scheduling research , 1990 .
[24] M. Solomon,et al. Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time , 1996 .
[25] Cheryl Gaimon,et al. Routing flexibility and production scheduling in a flexible manufacturing system , 1992 .
[26] Robert J. Wittrock,et al. An Adaptable Scheduling Algorithm for Flexible Flow Lines , 1988, Oper. Res..