Scheduling of runway operations for reduced environmental impact
暂无分享,去创建一个
[1] Douglas P. DuBois,et al. “Fuel Flow Method2” for Estimating Aircraft Emissions , 2006 .
[2] Adib Kanafani,et al. Air, high-speed rail, or highway: A cost comparison in the California corridor , 1999 .
[3] Hamsa Balakrishnan,et al. Queuing Models of Airport Departure Processes for Emissions Reduction , 2009 .
[4] John Black,et al. HUB-AND-SPOKE NETWORKS AND THE INCLUSION OF ENVIRONMENTAL COSTS ON AIRPORT PRICING , 1998 .
[5] Ugur Kesgin,et al. Aircraft emissions at Turkish airports , 2006 .
[6] C.R. Brinton,et al. Collaborative Airport Surface Metering for Efficiency and Environmental Benefits , 2007, 2007 Integrated Communications, Navigation and Surveillance Conference.
[7] John-Paul Clarke,et al. Flight-Test Evaluation of the Tool for Analysis of Separation and Throughput , 2008 .
[8] Stephen Anderson,et al. Evaluating the true cost to airlines of one minute of airborne or ground delay: final report , 2004 .
[9] Jon P. Nelson,et al. META-ANALYSIS OF AIRPORT NOISE AND HEDONIC PROPERTY VALUES : PROBLEMS AND PROSPECTS , 2004 .
[10] Pei-Hui Lin,et al. Performance assessment for airport noise charge policies and airline network adjustment response , 2005 .
[11] Elizabeth Bly. Effects of reduced IFR arrival-arrival wake vortex separation minima and improved runaway operations sequencing on flight delay , 2005 .
[12] Mike Harrison. Integrated communications, navigation and surveillance study , 2010, ICNS 2010.
[13] Yoon C. Jung,et al. Analysis of Environmental Impact of Eliminating Arrival Hold Short Operations for Runway Crossings at Dallas/Ft. Worth Airport , 2008 .