Snapshot of Personnel Productivity Assessment in Indian IT Industry

Measuring the productivity of employees has been one of the concerns of IT organisations globally. It is indispensable to calculate the cost of the project vis-a-vis the time estimate. While calculating the lines of coding Loc has generally been the common criteria for programmers, it is not always considered an effective measure of the actual work done. The time spent on activities like attending training programmes, participating in meetings, co-coordinating with colleagues, or conceptualising, is presumably unaccounted. Questions lurking unanswered relate to the effective criteria and international benchmarks. Amusingly most companies have their own home-grown productivity calculators to track the progress of their projects. Productivity measurement is equally important for an organisation as well as an IT worker. Awareness of productivity paves way-for mutual progress-self and the organization. This paper, through illustrative-case examples, provides a holistic perspective of personnel productivity assessment methods used in Indian IT industry.

[1]  James S. Pepitone A case for humaneering , 2002 .

[2]  A. Bakker,et al.  Job demands, job resources, and their relationship with burnout and engagement: a multi‐sample study , 2004 .

[3]  J S Elbaz,et al.  [The expert's opinion]. , 2000, Annales de chirurgie plastique et esthetique.

[4]  Andrew Martin,et al.  What drives the configuration of information technology projects? Exploratory research in 10 organizations , 2003, J. Inf. Technol..

[5]  Eerikki Mäki,et al.  RESEARCH ON KNOWLEDGE PROCESSES IN KNOWLEDGE-INTENSIVE ORGANIZATIONS , 2008 .

[6]  Christopher Chung,et al.  A methodology for measuring engineering knowledge worker productivity , 2006, IEEE Engineering Management Review.

[7]  D. Armstrong,et al.  Managing distances and differences in geographically distributed work groups. , 2002 .

[8]  Harold Koontz,et al.  Management: A Global Perspective , 1993 .

[9]  Gary Klein,et al.  The Role of User Review on Information System Project Outcomes: A Control Theory Perspective , 2010, Int. J. Inf. Technol. Proj. Manag..

[10]  Janice C. Sipior,et al.  An Empirical Evaluation of E-Government Inclusion Among the Digitally Disadvantaged in the United States , 2010, Inf. Resour. Manag. J..

[11]  A. Neely,et al.  The performance prism in practice , 2001 .

[12]  Petra Bosch-Sijtsema,et al.  Knowledge work productivity in distributed teams , 2009, J. Knowl. Manag..

[13]  Pasi Pyöriä,et al.  Knowledge Workers in the Information Society : Evidence from Finland , 2005 .

[14]  Gary N. McLean,et al.  Best Employer Studies: A Conceptual Model from a Literature Review and a Case Study , 2006 .

[15]  Blake Ives,et al.  Virtual teams: a review of current literature and directions for future research , 2004, DATB.

[16]  Bruce Marsh A Consolidated Approach to Productivity Assessment , 2002 .

[17]  David A. Nembhard,et al.  Measuring knowledge worker productivity , 2004 .

[18]  Norbert Gronau,et al.  A Procedure Model for a SoA-Based Integration of Enterprise Systems , 2008, Int. J. Enterp. Inf. Syst..

[19]  Karen J. Pettingell,et al.  Measuring Productivity of Software Projects: A Data Envelopment Analysis Approach , 1996 .

[20]  Mehdi Khosrow-Pour,et al.  Printed at: , 2011 .

[21]  Pasi Pyöriä,et al.  The concept of knowledge work revisited , 2005, J. Knowl. Manag..

[22]  T. Davenport,et al.  Just-in-time delivery comes to knowledge management. , 2002, Harvard business review.

[23]  Bongsug Chae,et al.  Knowledge management enablers within an IT department , 2003 .

[24]  Steve McConnell,et al.  Professional Software Development: Shorter Schedules, Higher Quality Products, More Successful Projects, Enhanced Careers , 2003 .

[25]  Gad Vitner,et al.  Multidimensional project control system implementation methodology , 2010 .

[26]  Dorothy G. Dologite,et al.  Enabling B2B marketplaces: the case of GE global exchange services , 2003 .

[27]  David O'Sullivan,et al.  Collaborative Innovation for the Management of Information Technology Resources , 2010, Int. J. Hum. Cap. Inf. Technol. Prof..

[28]  P. Drucker Knowledge-Worker Productivity: The Biggest Challenge , 1999, IEEE Engineering Management Review.

[29]  Evon M. O. Abu-Taieh,et al.  A Road Map for the Validation, Verification and Testing of Discrete Event Simulation , 2009 .

[30]  Barbara A. Kitchenham,et al.  An empirical analysis of software productivity over time , 2005, 11th IEEE International Software Metrics Symposium (METRICS'05).

[31]  Anne Marie F. Bagadion Innovative Retailing: Uplifting the Lives of Basic Ecclesial Community in Camarines Sur, Philippines , 2013, Int. J. Asian Bus. Inf. Manag..

[32]  Peter F. Drucker,et al.  The new productivity challenge. , 1991 .

[33]  Mette Asmild,et al.  Using Data Envelopment Analysis in software development productivity measurement , 2006, Softw. Process. Improv. Pract..

[34]  David Mason,et al.  Advanced Topics in Information Resources Management , 2003 .

[35]  Stefan Wagner,et al.  A Structured Review of Productivity Factors in Software Development , 2008 .

[36]  Ricardo Colomo Palacios,et al.  Software Project Managers under the Team Software Process: A Study of Competences , 2010, Int. J. Inf. Technol. Proj. Manag..

[37]  Patricia Scott,et al.  Knowledge workers: social, task and semantic network analysis , 2005 .