Heuristics for operator allocation and sequencing in just-in-time flow line manufacturing cell
暂无分享,去创建一个
[1] Augustine O. Esogbue,et al. Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approach , 1974 .
[2] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[3] Joel P. Stinson,et al. A heuristic proǵramminǵ procedure for sequencinǵ the static flowshop , 1982 .
[4] J. Gupta. FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES , 1986 .
[5] Taeho Park,et al. Analysis of heuristics for job sequencing in manufacturing flow line work-cells , 1991 .
[6] Katsundo Hitomi,et al. Optimal Two-Stage Production Scheduling with Setup Times Separated , 1979 .
[7] Soumen Ghosh,et al. A MILP model for the n-job, M-stage flowshop with sequence dependent set-up times , 1986 .