Inventory Positioning , Scheduling and Due-Date Quotation in Supply Chains

We consider supply chain networks composed of several centrally managed production facilities as well as external suppliers. We design effective heuristics for inventory positioning, order sequencing, and short and reliable due date quotation for this supply chain. We perform extensive computational testing to assess the effectiveness of our algorithms, and we explore the impact of supply chain topology on inventory costs and effective due date quotation.

[1]  Kenneth F. Simpson In-Process Inventories , 1958 .

[2]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[3]  K. Inderfurth Safety stock optimization in multi-stage inventory systems , 1991 .

[4]  Hau L. Lee,et al.  Material Management in Decentralized Supply Chains , 1993, Oper. Res..

[5]  Sven Axsäter,et al.  Chapter 4 Continuous review policies for multi-level inventory systems with stochastic demand , 1993, Logistics of Production and Inventory.

[6]  Karl Inderfurth Valuation of Leadtime Reduction in Multi-Stage Production Systems , 1993 .

[7]  K. Inderfurth Safety stocks in multistage divergent inventory systems: A survey , 1994 .

[8]  Paul Glasserman,et al.  Sensitivity Analysis for Base-Stock Levels in Multiechelon Production-Inventory Systems , 1995 .

[9]  Eb Erik Diks,et al.  Multi-echelon systems: A service measure perspective , 1996 .

[10]  Stefan Minner,et al.  Dynamic programming algorithms for multi-stage safety stock optimization , 1997 .

[11]  S. Willems,et al.  Strategic Safety Stock Placement In Supply Chains , 1997 .

[12]  Stefan Minner,et al.  Safety stocks in multi-stage inventory systems under different service measures , 1998, Eur. J. Oper. Res..

[13]  David Simchi-Levi,et al.  Probabilistic Analysis and Practical Algorithms for the Flow Shop Weighted Completion Time Problem , 1998, Oper. Res..

[14]  J. George Shanthikumar,et al.  On the Asymptotic Optimality of the SPT Rule for the Flow Shop Average Completion Time Problem , 2000, Oper. Res..

[15]  Sean P. Willems,et al.  Optimizing Strategic Safety Stock Placement in Supply Chains , 2000, Manuf. Serv. Oper. Manag..

[16]  David D. Yao,et al.  A Supply Network Model with Base-Stock Control and Service Requirements , 2000, Oper. Res..

[17]  David Simchi-Levi,et al.  Asymptotic analysis of an on-line algorithm for the single machine completion time problem with release dates , 2001, Oper. Res. Lett..

[18]  Sean P. Willems,et al.  Correspondence: Erratum: Optimizing Strategic Safety Stock Placement in Supply Chains , 2003, Manuf. Serv. Oper. Manag..

[19]  Vineet Padmanabhan,et al.  Comments on "Information Distortion in a Supply Chain: The Bullwhip Effect" , 1997, Manag. Sci..

[20]  Onur Kaya,et al.  MTO-MTS Production Systems in Supply Chains , 2006 .

[21]  David Simchi-Levi,et al.  Inventory placement in acyclic supply chain networks , 2006, Oper. Res. Lett..

[22]  Onur Kaya,et al.  Scheduling and Due-Date Quotation in a MTO Supply Chain , 2007 .