A real option approach to determine optimal intervention windows for multi-national rail corridors

In this paper, a real option approach to determine the optimal time to execute interventions on rail infrastructure, when it is not known for certain which intervention is to be executed, is presented (i.e. the optimal intervention window). Such an approach is useful in the management of rail infrastructure that belongs to a multi-national rail corridor where multiple railway organizations, ideally, should coordinate their maintenance interventions, years in advance, to minimize service disruptions. The approach is based on an adaptation of the Black and Scholes differential equation model used to value European call options in financial engineering. It is demonstrated by determining the optimal intervention window for infrastructure in a fictive rail corridor.

[1]  Nikolaos Georgiopoulos Real Options , 2006 .

[2]  Janjaap Semeijn,et al.  Rail Freight in Europe: Different Perspectives on Archieving Higher Service Levels , 2007, Transportation Journal.

[3]  Sakdirat Kaewunruen,et al.  Dynamic properties of railway track and its components : a state-of-the-art review , 2008 .

[4]  Hakan Guler,et al.  Modelling railway track geometry deterioration , 2011 .

[5]  Krishna B. Misra,et al.  Handbook of Performability Engineering , 2008 .

[6]  Luca Fumagalli,et al.  Maintenance management of railway infrastructures based on reliability analysis , 2012, Reliab. Eng. Syst. Saf..

[7]  F. Black,et al.  The Pricing of Options and Corporate Liabilities , 1973, Journal of Political Economy.

[8]  Ambika Prasad Patra,et al.  Maintenance decision support models for railway infrastructure using RAMS and LCC analyses , 2009 .

[9]  S. Iacus Option Pricing and Estimation of Financial Models with R , 2011 .

[10]  Luca Podofillini,et al.  Risk-informed optimisation of railway tracks inspection and maintenance procedures , 2006, Reliab. Eng. Syst. Saf..

[11]  Yves Crozet,et al.  European railway infrastructures: towards a convergence of infrastructure , 2003 .

[12]  Jianmin Zhao,et al.  Optimizing Policies of Railway Ballast Tamping and Renewal , 2006 .

[13]  Christopher P. L. Barkan,et al.  Cost-Effectiveness of Railway Infrastructure Renewal Maintenance , 2006 .

[14]  David N. Ford,et al.  A real options approach to valuing strategic flexibility in uncertain construction projects , 2002 .

[15]  Han T. J. Smit,et al.  Infrastructure Investment as a Real Options Game: The Case of European Airport Expansion , 2003 .

[16]  Ph. Bressolette,et al.  Reliability analysis of maintenance operations for railway tracks , 2013, Reliab. Eng. Syst. Saf..

[17]  Michael J. Garvin,et al.  Valuing Simple Multiple-Exercise Real Options in Infrastructure Projects , 2007 .

[18]  José Azevedo-Pereira,et al.  High Speed Rail Transport Valuation and Policy Decisions , 2008 .

[19]  John D. Andrews,et al.  Optimal Scheduling of Track Maintenance on a Railway Network , 2013, Qual. Reliab. Eng. Int..

[20]  Per Hokstad,et al.  RAMS Management of Railway Tracks , 2008 .

[21]  Buyung Agusdinata Exploratory analysis to support real options analysis , 2005 .

[22]  Arjen Zoeteman,et al.  Life cycle cost analysis for managing rail infrastructure Concept of a decision support system for railway design and maintenance , 2001 .

[23]  Ernesto Heredia-Zavoni,et al.  Maintenance and decommissioning real options models for life-cycle cost-benefit analysis of offshore platforms , 2011 .

[24]  Gualter Couto,et al.  High-speed rail transport valuation , 2010 .

[25]  Chung-Li Tseng,et al.  Highway Development Decision-Making under Uncertainty: A Real Options Approach , 2004 .

[26]  Paulo Fonseca Teixeira,et al.  Availability Approach to Optimizing Railway Track Renewal Operations , 2013 .

[27]  Chung-Li Tseng,et al.  Valuing Flexibility in Infrastructure Expansion , 2003 .

[28]  Luis Ferreira,et al.  Scheduling rail track maintenance to minimise overall delays , 1999 .

[29]  J. Hull Options, Futures, and Other Derivatives , 1989 .

[30]  Natalia Ramirez,et al.  Valuing flexibility in infrastructure developments : the Bogota water supply expansion plan. , 2002 .