Fabrication of a 1/6-Scale Mock-Up for the Korea TBM First Wall in ITER
暂无分享,去创建一个
[1] Dong Won Lee,et al. Fabrication and high heat flux test of large mockups for ITER first wall semi-prototype , 2011 .
[2] J. Park,et al. HIP joining of RAFM/RAFM steel and beryllium/RAFM steel for fabrication of the ITER TBM first wall , 2009 .
[3] Dong Won Lee,et al. High Heat Flux Test with HIP Bonded 50x50 Be/Cu Mock-Ups for the ITER First Wall , 2009 .
[4] Bong Guen Hong,et al. Fabrication and high heat flux test of the first wall mock-ups for the Korean He Cooled Test Blanket (KO HCML TBM) , 2009 .
[5] Dong Won Lee,et al. High heat flux test with HIP bonded Be/Cu mock-ups for the ITER first wall , 2008, 2009 23rd IEEE/NPSS Symposium on Fusion Engineering.
[6] Bong Guen Hong,et al. Design and preliminary safety analysis of a helium cooled molten lithium test blanket module for the ITER in Korea , 2008 .
[7] Kyung Ho Yoon,et al. Helium Cooled Molten Lithium TBM for the ITER in Korea , 2007 .
[8] Dong Won Lee,et al. Basic concepts of DEMO and a design of a helium-cooled molten lithium blanket for a testing in ITER , 2007 .
[9] Kyung Ho Yoon,et al. Preliminary design of a helium cooled molten lithium test blanket module for the ITER test in Korea , 2007 .
[10] B. G. Hong,et al. Current Status and R & D Plan on ITER TBMs of Korea , 2006 .