Uncertainty in life cycle costing for long-range infrastructure. Part I: leveling the playing field to address uncertainties

PurposeLife cycle costing (LCC) is a state-of-the-art method to analyze investment decisions in infrastructure projects. However, uncertainties inherent in long-term planning question the credibility of LCC results. Previous research has not systematically linked sources and methods to address this uncertainty. Part I of this series develops a framework to collect and categorize different sources of uncertainty and addressing methods. This systematization is a prerequisite to further analyze the suitability of methods and levels the playing field for part II.MethodsPast reviews have dealt with selected issues of uncertainty in LCC. However, none has systematically collected uncertainties and linked methods to address them. No comprehensive categorization has been published to date. Part I addresses these two research gaps by conducting a systematic literature review. In a rigorous four-step approach, we first scrutinized major databases. Second, we performed a practical and methodological screening to identify in total 115 relevant publications, mostly case studies. Third, we applied content analysis using MAXQDA. Fourth, we illustrated results and concluded upon the research gaps.Results and discussionWe identified 33 sources of uncertainty and 24 addressing methods. Sources of uncertainties were categorized according to (i) its origin, i.e., parameter, model, and scenario uncertainty and (ii) the nature of uncertainty, i.e., aleatoric or epistemic uncertainty. The methods to address uncertainties were classified into deterministic, probabilistic, possibilistic, and other methods. With regard to sources of uncertainties, lack of data and data quality was analyzed most often. Most uncertainties having been discussed were located in the use stage. With regard to methods, sensitivity analyses were applied most widely, while more complex methods such as Bayesian models were used less frequently. Data availability and the individual expertise of LCC practitioner foremost influence the selection of methods.ConclusionsThis article complements existing research by providing a thorough systematization of uncertainties in LCC. However, an unambiguous categorization of uncertainties is difficult and overlapping occurs. Such a systemizing approach is nevertheless necessary for further analyses and levels the playing field for readers not yet familiar with the topic. Part I concludes the following: First, an investigation about which methods are best suited to address a certain type of uncertainty is still outstanding. Second, an analysis of types of uncertainty that have been insufficiently addressed in previous LCC cases is still missing. Part II will focus on these research gaps.

[1]  Mohammed Kishk,et al.  Combining various facets of uncertainty in whole‐life cost modelling , 2004 .

[2]  M. Anwari,et al.  An evaluation of hybrid wind/diesel energy potential in Pemanggil Island Malaysia , 2012, 2012 International Conference on Power Engineering and Renewable Energy (ICPERE).

[3]  J Walls,et al.  Life-Cycle Cost Analysis in Pavement Design — Interim Technical Bulletin , 1998 .

[4]  David Hunkeler,et al.  Environmental life-cycle costing: a code of practice , 2011 .

[5]  Qunzhan Li New generation traction power supply system and its key technologies for electrified railways , 2015 .

[6]  N. Dalkey,et al.  An Experimental Application of the Delphi Method to the Use of Experts , 1963 .

[7]  Samer Madanat,et al.  Life-Cycle Cost Minimization and Sensitivity Analysis for Mechanistic-Empirical Pavement Design , 2012 .

[8]  M. Huijbregts,et al.  Evaluating uncertainty in environmental life-cycle assessment. A case study comparing two insulation options for a Dutch one-family dwelling. , 2003, Environmental science & technology.

[9]  Tarek Zayed,et al.  Fuzzy-Based Life-Cycle Cost Model for Decision Making under Subjectivity , 2013 .

[10]  Raymond J. Cole,et al.  Reconciling theory and practice of life-cycle costing , 2000 .

[11]  Andreas Jørgensen,et al.  Is LCC relevant in a sustainability assessment? , 2010 .

[12]  Susan L. Tighe,et al.  Guidelines for Probabilistic Pavement Life Cycle Cost Analysis , 2001 .

[13]  Jon C. Helton,et al.  Mathematical representation of uncertainty , 2001 .

[14]  Stefanie Hellweg Time- and site-dependent life cycle assessment of thermal waste treatment processes , 2001 .

[15]  Dimitri V. Val Factors Affecting Life-Cycle Cost Analysis of RC Structures in Chloride Contaminated Environments , 2007 .

[16]  Chan S. Park,et al.  Advanced engineering economics , 1990 .

[17]  Anthony Halog,et al.  An approach to selection of sustainable product improvement alternatives with data uncertainty , 2004 .

[18]  A. Tversky,et al.  Variants of uncertainty , 1982, Cognition.

[19]  Pablo Luis Durango-Cohen,et al.  Using Advanced Inspection Technologies to Support Investments in Maintenance and Repair of Transportation Infrastructure Facilities , 2006 .

[20]  Mark A. J. Huijbregts,et al.  Application of uncertainty and variability in LCA , 1998 .

[21]  Y. K. Wen,et al.  Minimum Building Life-Cycle Cost Design Criteria. II: Applications , 2001 .

[22]  Jose Manuel Cejudo-Lopez,et al.  Uncertainty in peak cooling load calculations , 2010 .

[23]  Mark G. Stewart,et al.  Life-Cycle Cost Assessment of Maintenance Strategies for RC Structures in Chloride Environments , 2012 .

[24]  A. Kiureghian,et al.  Aleatory or epistemic? Does it matter? , 2009 .

[25]  F. Johnsson,et al.  Cost-effective retrofitting of Swedish residential buildings: effects of energy price developments and discount rates , 2015 .

[26]  M Hinow,et al.  Substation Maintenance Strategy Adaptation for Life-Cycle Cost Reduction Using Genetic Algorithm , 2011, IEEE Transactions on Power Delivery.

[27]  W. Walker,et al.  Defining Uncertainty: A Conceptual Basis for Uncertainty Management in Model-Based Decision Support , 2003 .

[28]  A. Saari,et al.  Renewable vs. traditional energy management solutions – A Finnish hospital facility case , 2013 .

[29]  S. Kvale The Social Construction of Validity , 1995 .

[30]  Seung-Woo Han,et al.  Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels , 2007 .

[31]  Shabbir H. Gheewala,et al.  Sustainability assessment of municipal solid waste management in Sri Lanka: problems and prospects , 2012, Journal of Material Cycles and Waste Management.

[32]  Weng Tat Chan,et al.  ROAD-MAINTENANCE PLANNING USING GENETIC ALGORITHMS. II: ANALYSIS , 1994 .

[33]  C. A. Bernardo,et al.  Integrating environmental and economic life cycle analysis in product development: a material selection case study , 2013, The International Journal of Life Cycle Assessment.

[34]  Alec C Danaher Incorporating Externalities and Uncertainty into Life-Cycle Cost Analysis , 2012 .

[35]  Pernilla Gluch,et al.  The life cycle costing (LCC) approach: a conceptual discussion of its usefulness for environmental decision-making , 2004 .

[36]  J. O'Sullivan,et al.  A decision support tool for sustainable planning of urban water systems: presenting the Dynamic Urban Water Simulation Model. , 2013, Water research.

[37]  Robert J. Budnitz,et al.  Recommendations for probabilistic seismic hazard analysis: Guidance on uncertainty and use of experts , 1997 .

[38]  L. Aye,et al.  Engineering reliability analysis in risk management framework: Development and application in infrastructure project , 2013 .

[39]  Ettore Settanni,et al.  Applying a non‐deterministic conceptual life cycle costing model to manufacturing processes , 2010 .

[40]  A. Chateauneuf,et al.  Cost model for optimum thicknesses of insulated walls considering indirect impacts and uncertainties , 2014 .

[41]  Paolo Gardoni,et al.  Effect of cumulative seismic damage and corrosion on the life‐cycle cost of reinforced concrete bridges , 2009 .

[42]  David Lewis,et al.  Life-cycle cost in a highly uncertain economic environment: The case of managing the U.S. Department of Energy's nuclear waste legacy , 2004 .

[43]  Halim A. Boussabaine,et al.  Whole Life Risk Analysis Techniques , 2008 .

[44]  Bert Bras,et al.  AN ACTIVITY-BASED LIFE-CYCLE ASSESSMENT METHOD , 1997 .

[45]  Yuchun Xu,et al.  Cost Engineering for manufacturing: Current and future research , 2012, Int. J. Comput. Integr. Manuf..

[46]  Mahendra P. Singh,et al.  Minimum failure cost-based energy dissipation system designs for buildings in three seismic regions – Part I: Elements of failure cost analysis , 2014 .

[47]  Anna Björklund,et al.  Survey of approaches to improve reliability in lca , 2002 .

[48]  René von Schomberg,et al.  Controversies and Political Decision Making , 1993 .

[49]  Lotfi A. Zadeh,et al.  Outline of a New Approach to the Analysis of Complex Systems and Decision Processes , 1973, IEEE Trans. Syst. Man Cybern..

[50]  J. H. Wilkinson,et al.  Error analysis , 2003 .

[51]  Zongzhi Li,et al.  Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study , 2009 .

[52]  Uday Kumar,et al.  Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration , 2009 .

[53]  Gang Liu,et al.  Development of a general sustainability indicator for renewable energy systems: A review , 2014 .

[54]  Eva Sterner,et al.  Life-cycle costing and its use in the Swedish building sector , 2000 .

[55]  Rajkumar Roy,et al.  Cost engineering: why, what and how? , 2003 .

[56]  Jan Emblemsvåg,et al.  Activity-based life-cycle costing in long-range planning , 2007 .

[57]  Petri Suomala,et al.  Learning by costing , 2007 .

[58]  Susanna Horn,et al.  Evaluating the Sustainability SWOT as a streamlined tool for life cycle sustainability assessment , 2013, The International Journal of Life Cycle Assessment.

[59]  Y. Asiedu,et al.  Product life cycle cost analysis: State of the art review , 1998 .

[60]  Patrick Ilg,et al.  High-performance materials in infrastructure: a review of applied life cycle costing and its drivers – the case of fiber-reinforced composites , 2016 .

[61]  Wulf-Peter Schmidt,et al.  Life Cycle costing as part of design for environment environmental business cases , 2003 .

[62]  Constantine Samaras,et al.  Incorporating uncertainty analysis into life cycle estimates of greenhouse gas emissions from biomass production , 2011 .

[63]  Sanna Syri,et al.  Electrical energy storage systems: A comparative life cycle cost analysis , 2015 .

[64]  Tamer E. El-Diraby,et al.  Framework for Managing Life-Cycle Cost of Smart Infrastructure Systems , 2004 .

[65]  Thomas Stützle,et al.  MAX-MIN Ant System , 2000, Future Gener. Comput. Syst..

[66]  K. Hungerbühler,et al.  Uncertainty Analysis in Life Cycle Assessment (LCA): Case Study on Plant - Protection Products and Implications for Decision Making (3 pp) , 2005 .

[67]  Y. Asiedu,et al.  Simulation-based cost estimation under economic uncertainty using kernel estimators , 2000 .

[68]  Z. Lounis,et al.  Probabilistic modeling of chloride-induced corrosion in concrete structures using first- and second-order reliability methods , 2012 .

[69]  Tak Hur,et al.  Life cycle cost analysis to examine the economical feasibility of hydrogen as an alternative fuel , 2009 .

[70]  Réjean Landry,et al.  Lessons from Innovation Empirical Studies in the Manufacturing Sector: A Systematic Review of the Literature from 1993-2003 , 2006 .

[71]  Stefanie Hellweg,et al.  Uncertainty Analysis in Life Cycle Assessment (LCA): Case Study on Plant-Protection Products and Implications for Decision Making (9 pp + 3 pp) , 2005 .

[72]  Louis Gosselin,et al.  New methodology to design ground coupled heat pump systems based on total cost minimization , 2014 .

[73]  Manolis Papadrakakis,et al.  Life-cycle cost assessment of optimally designed reinforced concrete buildings under seismic actions , 2011, Reliab. Eng. Syst. Saf..

[74]  Balbir S. Dhillon Life cycle cost: A survey , 1981 .

[75]  Aiqun Li,et al.  Pavement Rehabilitation Strategy Selection for Steel Suspension Bridges Based on Probabilistic Life-Cycle Cost Analysis , 2012 .

[76]  Ronald L. Iman,et al.  A FORTRAN-77 PROGRAM AND USER'S GUIDE FOR THE GENERATION OF LATIN HYPERCUBE AND RANDOM SAMPLES FOR USE WITH COMPUTER MODELS , 1984 .

[77]  Patrick Ilg,et al.  Uncertainty in life cycle costing for long-range infrastructure. Part II: guidance and suitability of applied methods to address uncertainty , 2016, The International Journal of Life Cycle Assessment.

[78]  António Ramos Andrade,et al.  A Bayesian model to assess rail track geometry degradation through its life-cycle , 2012 .

[79]  Mohan V. Tatikonda,et al.  Technology novelty, project complexity, and product development project execution success: a deeper look at task uncertainty in product innovation , 2000, IEEE Trans. Engineering Management.

[80]  Karen Allacker,et al.  Environmental and economic optimisation of the floor on grade in residential buildings , 2012, The International Journal of Life Cycle Assessment.

[81]  D. Tranfield,et al.  Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review , 2003 .

[82]  Reinout Heijungs,et al.  A review of approaches to treat uncertainty in LCA , 2004 .

[83]  David Hunkeler,et al.  Environmental Life Cycle Costing , 2008 .

[84]  Harold E. Marshall,et al.  The economics of new-technology materials:: a case study of FRP bridge decking , 1996 .

[85]  Sergio Cavalieri,et al.  Parametric vs. neural network models for the estimation of production costs: A case study in the automotive industry , 2004 .

[86]  Alan D. Russell Economic risks in energy conservation strategies , 1981 .

[87]  Rabi G. Mishalani,et al.  Optimal Sampling of Infrastructure Condition: Motivation, Formulation, and Evaluation , 2009 .

[88]  T. Bedford,et al.  Probabilistic Risk Analysis: Foundations and Methods , 2001 .

[89]  Patrick Hofstetter,et al.  Perspectives in life cycle impact assessment , 1998 .

[90]  Adolfo Crespo Márquez,et al.  Life Cycle Cost Analysis , 2012 .

[91]  M. Reich,et al.  Economic assessment of municipal waste management systems—case studies using a combination of life cycle assessment (LCA) and life cycle costing (LCC) , 2005 .

[92]  Chen Chen Soft Computing-based Life-Cycle Cost Analysis Tools for Transportation Infrastructure Management , 2007 .

[93]  David T. Butry,et al.  Economic Performance of Residential Fire Sprinkler Systems , 2009 .

[94]  Mads Troldborg,et al.  Assessing the sustainability of renewable energy technologies using multi-criteria analysis: Suitability of approach for national-scale assessments and associated uncertainties , 2014 .

[95]  George Mavrotas,et al.  Energy planning of a hospital using Mathematical Programming and Monte Carlo simulation for dealing with uncertainty in the economic parameters , 2010 .

[96]  William G. Sullivan,et al.  Fundamentals of Forecasting , 1977 .

[97]  S. Isukapalli UNCERTAINTY ANALYSIS OF TRANSPORT-TRANSFORMATION MODELS , 1999 .

[98]  Reimut Jochimsen,et al.  Theorie der Infrastruktur : Grundlagen der marktwirtschaftlichen Entwicklung , 1966 .

[99]  Jon C. Helton,et al.  Treatment of Uncertainty in Performance Assessments for Complex Systems , 1994 .

[100]  Arlene Fink,et al.  Conducting research literature reviews : from the internet to paper , 2014 .

[101]  Trivess Moore,et al.  Lifecycle costing sensitivities for zero energy housing in Melbourne, Australia , 2014 .

[102]  Weihua Li,et al.  Phase behaviors and ordering dynamics of diblock copolymer self-assembly directed by lateral hexagonal confinement. , 2012, The Journal of chemical physics.

[103]  Seth D. Guikema,et al.  Probabilistic life cycle analysis model for evaluating electric power infrastructure risk mitigation investments , 2011 .

[104]  G. Daniel,et al.  Trans-splenic portal scintigraphy in normal dogs. , 2005, Veterinary radiology & ultrasound : the official journal of the American College of Veterinary Radiology and the International Veterinary Radiology Association.

[105]  T. Koopmans Three Essays on the State of Economic Science , 1958 .

[106]  Jerome R. Ravetz,et al.  Uncertainty and Quality in Science for Policy , 1990 .

[107]  Steven I-Jy Chien,et al.  Dynamic Bus Arrival Time Prediction with Artificial Neural Networks , 2002 .

[108]  Benedikt Battke,et al.  A review and probabilistic model of lifecycle costs of stationary batteries in multiple applications , 2013 .

[109]  Dan M. Frangopol,et al.  Inspection and monitoring planning for RC structures based on minimization of expected damage detection delay , 2011 .

[110]  R. Cooke Elicitation of expert opinions for uncertainty and risks , 2003 .

[111]  Max Henrion,et al.  Uncertainty: A Guide to Dealing with Uncertainty in Quantitative Risk and Policy Analysis , 1990 .

[112]  A R Jadad,et al.  What contributions do languages other than English make on the results of meta-analyses? , 2000, Journal of clinical epidemiology.

[113]  Alessandra Zamagni,et al.  Life cycle sustainability assessment , 2012, The International Journal of Life Cycle Assessment.

[114]  Ranjit Roy,et al.  A novel modified GBMO algorithm based static transmission network expansion planning , 2014 .

[115]  G. Apostolakis The concept of probability in safety assessments of technological systems. , 1990, Science.

[116]  J. M. van Noortwijk,et al.  The use of lifetime distributions in bridge maintenance and replacement modelling , 2004 .

[117]  D. P. Breidenbach Life cycle cost analysis , 1989, Proceedings of the IEEE National Aerospace and Electronics Conference.

[118]  Joan Rieradevall,et al.  An environmental and economic life cycle assessment of rooftop greenhouse (RTG) implementation in Barcelona, Spain. Assessing new forms of urban agriculture from the greenhouse structure to the final product level , 2015, The International Journal of Life Cycle Assessment.

[119]  Numan Yoner Major Weapon Systems Acquisition and Life Cycle Cost Estimation: A Case Study , 2001 .

[120]  Liying Gong,et al.  Optimal infrastructure condition sampling over space and time for maintenance decision-making under uncertainty , 2009 .

[121]  Sercan Serin,et al.  Planning maintenance works on pavements through ant colony optimization , 2013, Neural Computing and Applications.

[122]  B. Fischhoff,et al.  Assessing uncertainty in physical constants , 1986 .

[123]  David De Leon,et al.  Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration , 2013 .

[124]  Pedro Fernandes,et al.  An Overview on Degradation Modelling for Service Cost Estimation , 2011 .

[125]  Junbok Lee,et al.  Probabilistic value analysis methodology for public water supply systems , 2009 .

[126]  A. Halim Boussabaine,et al.  Stochastic time series forecasting of electricity costs in an NHS acute care hospital building, for use in whole life cycle costing , 2002 .

[127]  Tore Markeset,et al.  Activity-based life cycle cost analysis as an alternative to conventional LCC in engineering design , 2011, Int. J. Syst. Assur. Eng. Manag..

[128]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[129]  Taher Niknam,et al.  Intelligent stochastic framework to solve the reconfiguration problem from the reliability view , 2014 .

[130]  Jelena Srebric,et al.  Variability of optimal solutions for building components based on comprehensive life cycle cost analysis , 2014 .

[131]  Stefan Seuring,et al.  From a literature review to a conceptual framework for sustainable supply chain management , 2008 .

[132]  George Morcous,et al.  Maintenance optimization of infrastructure networks using genetic algorithms , 2005 .

[133]  Chris A. McMahon,et al.  Uncertainty in Through-Life Costing–-Review and Perspectives , 2010, IEEE Transactions on Engineering Management.

[134]  Johannes Schiller,et al.  The art of long-term thinking: A bridge between sustainability science and politics , 2013 .