Goal programming approach to the remanufacturing supply-chain model
暂无分享,去创建一个
[1] S. G. Lee,et al. An algorithm for optimising the servicing of products with constrained, multiple defects , 2000 .
[2] James P. Ignizio,et al. Linear Programming in Single- and Multiple-Objective Systems , 1984 .
[3] S. M. Junaid Zaidi,et al. Linear Programming in Single and Multiple Objective Systems , 1982 .
[4] Surendra M. Gupta,et al. Design for Disassembly, Reuse, and Recycling , 2000 .
[5] Surendra M. Gupta,et al. ENVIRONMENTAL CONCERNS AND RECYCLING/DISASSEMBLY EFFORTS IN THE ELECTRONICS INDUSTRY , 1997 .
[6] John L. Burbidge,et al. Production planning and control: A personal philosophy , 1985 .
[7] M. Simon,et al. Disassembly Process Planning , 1993 .
[8] Surendra M. Gupta,et al. Disassembly of multiple product structures , 1997 .
[9] Surendra M. Gupta,et al. Economic Consequences of Increasing Polymer Content for the U.S. Automobile Recycling Infrastructure , 1997 .
[10] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[11] Surendra M. Gupta,et al. Disassembly sequence planning for complete disassembly in product recovery , 1998 .
[12] Surendra M. Gupta,et al. Disassembly of complex product structures with parts and materials commonality , 1997 .
[13] Takeshi Hoshino,et al. Optimization Analysis for Recycle-Oriented Manufacturing Systems. , 1994 .