Inexact Multistage Stochastic Chance Constrained Programming Model for Water Resources Management under Uncertainties

In order to formulate water allocation schemes under uncertainties in the water resources management systems, an inexact multistage stochastic chance constrained programming (IMSCCP) model is proposed. The model integrates stochastic chance constrained programming, multistage stochastic programming, and inexact stochastic programming within a general optimization framework to handle the uncertainties occurring in both constraints and objective. These uncertainties are expressed as probability distributions, interval with multiply distributed stochastic boundaries, dynamic features of the long-term water allocation plans, and so on. Compared with the existing inexact multistage stochastic programming, the IMSCCP can be used to assess more system risks and handle more complicated uncertainties in water resources management systems. The IMSCCP model is applied to a hypothetical case study of water resources management. In order to construct an approximate solution for the model, a hybrid algorithm, which incorporates stochastic simulation, back propagation neural network, and genetic algorithm, is proposed. The results show that the optimal value represents the maximal net system benefit achieved with a given confidence level under chance constraints, and the solutions provide optimal water allocation schemes to multiple users over a multiperiod planning horizon.

[1]  J. M. Grosso,et al.  Chance-Constrained Model Predictive Control for Drinking Water Networks , 2014 .

[2]  Guohe Huang,et al.  Water resources management under uncertainty: factorial multi-stage stochastic program with chance constraints , 2016, Stochastic Environmental Research and Risk Assessment.

[3]  Xiaosheng Wang,et al.  Managing Water Supply Risk through an Option Contract in Uncertain Environment , 2016 .

[4]  Baoding Liu,et al.  Fuzzy project scheduling problem and its hybrid intelligent algorithm , 2010 .

[5]  Wei Tian,et al.  Chance-Constrained Day-Ahead Scheduling in Stochastic Power System Operation , 2014, IEEE Transactions on Power Systems.

[6]  R. Jagannathan,et al.  Chance-Constrained Programming with Joint Constraints , 1974, Oper. Res..

[7]  Baoding Liu,et al.  Fuzzy programming with fuzzy decisions and fuzzy simulation-based genetic algorithm , 2001, Fuzzy Sets Syst..

[8]  Zhong Li,et al.  An Inventory-Theory-Based Inexact Multistage Stochastic Programming Model for Water Resources Management , 2013 .

[9]  Jinwu Gao,et al.  Fuzzy Chance-Constrained Programming for Capital Budgeting Problem with Fuzzy Decisions , 2005, FSKD.

[10]  Hong Zhang,et al.  Chance-constrained programming on sugeno measure space , 2011, Expert Syst. Appl..

[11]  Boting Yang,et al.  Water resources management under multi-parameter interactions: A factorial multi-stage stochastic programming approach , 2013 .

[12]  Guohe Huang,et al.  AN INEXACT TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR WATER RESOURCES MANAGEMENT UNDER UNCERTAINTY , 2000 .

[13]  A. Charnes,et al.  CHANCE-CONSTRAINED PROGRAMMING: AN EXTENSION OF STATISTICAL METHOD , 1971 .

[14]  Jiuping Xu,et al.  Administrative and market-based allocation mechanism for regional water resources planning , 2015 .

[15]  Aaas News,et al.  Book Reviews , 1893, Buffalo Medical and Surgical Journal.

[16]  Gonzalo Guillén-Gosálbez,et al.  Multiobjective optimization for designing and operating more sustainable water management systems for a city in Mexico , 2015 .

[17]  Y. F. Li,et al.  An inexact two-stage stochastic programming model for water resources management in Nansihu Lake Basin, China. , 2013, Journal of environmental management.

[18]  Baoding Liu,et al.  New stochastic models for capacitated location-allocation problem , 2003, Comput. Ind. Eng..

[19]  Baoding Liu,et al.  Stochastic programming models for general redundancy-optimization problems , 2003, IEEE Trans. Reliab..

[20]  G H Huang,et al.  Inexact multistage stochastic integer programming for water resources management under uncertainty. , 2008, Journal of environmental management.

[21]  Y. C. Han,et al.  An Interval-Parameter Multi-stage Stochastic Chance-Constrained Mixed Integer Programming Model for Inter-basin Water Resources Management Systems under Uncertainty , 2008, 2008 Fifth International Conference on Fuzzy Systems and Knowledge Discovery.

[22]  Gordon H. Huang,et al.  An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty , 2006 .

[23]  J. Stedinger,et al.  Water resource systems planning and analysis , 1981 .

[24]  Y. P. Li,et al.  A multistage fuzzy-stochastic programming model for supporting sustainable water-resources allocation and management , 2009, Environ. Model. Softw..

[25]  Fang Chen,et al.  Inexact Multistage Fuzzy-Stochastic Programming Model for Water Resources Management , 2015 .

[26]  Y. P. Li,et al.  IFMP: Interval-fuzzy multistage programming for water resources management under uncertainty , 2008 .

[27]  Baoding Liu,et al.  Uncertain Programming , 1999 .

[28]  A. Charnes,et al.  Chance-Constrained Programming , 1959 .

[29]  Guohe Huang,et al.  A dual-interval fixed-mix stochastic programming method for water resources management under uncertainty , 2014 .

[30]  Liming Yao,et al.  Optimal allocation of regional water resources: From a perspective of equity–efficiency tradeoff , 2016 .

[31]  Fengqi You,et al.  Optimal design and operations of supply chain networks for water management in shale gas production: MILFP model and algorithms for the water‐energy nexus , 2015 .

[32]  Zoran Kapelan,et al.  Comparison of Robust Optimization and Info-Gap Methods for Water Resource Management under Deep Uncertainty , 2016 .

[33]  Roberto Rossi,et al.  A note on Liu-Iwamura's dependent-chance programming , 2009, Eur. J. Oper. Res..