Need for innovation in supplying engineer‐to‐order joinery products to construction: A case study in Sweden
暂无分享,去创建一个
Niclas Björngrim | Anders Bystedt | Samuel Forsman | Micael Öhman | Peter Bomark | Lars Laitila | M. Öhman | Anders Bystedt | Niclas Björngrim | L. Laitila | Samuel Forsman | Peter Bomark
[1] Ove Lagerqvist,et al. Using visualization technologies for design and planning of a healthy construction workplace , 2010 .
[2] Ivica Završki,et al. Reducing Variability to Improve Performance as a Lean Construction Principle , 2002 .
[3] Iris D. Tommelein,et al. Improving the Delivery Process for Engineered-To-Order Products - Lessons Learned from Power Distribution Equipment , 2004 .
[4] Erik Sandberg,et al. Coordination and waste in industrialised housing , 2011 .
[5] Glenn Ballard,et al. Rethinking Project Definition in Terms of Target Costing , 2006 .
[6] Eduardo Toledo Santos,et al. BUILDING DESIGN COORDINATION: COMPARING 2D AND 3D METHODS , 2008 .
[7] Thais da C. L. Alves,et al. Investigation of the Supply Chain of Prefabricated Wooden Doors , 2010 .
[8] Michael Lewis,et al. Lean production and sustainable competitive advantage , 2000 .
[9] Lauri Koskela,et al. Lean Production in Construction , 1993 .
[10] Ghang Lee,et al. Specifying parametric building object behavior (BOB) for a building information modeling system , 2006 .
[11] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[12] E. Sarah Slaughter,et al. Builders as sources of construction innovation , 1993 .
[13] Awad S. Hanna,et al. Best Practices for Integrating the Concurrent Engineering Environment into Multipartner Project Management , 2008 .
[14] Johannes I.M. Halman,et al. Innovation and interorganizational cooperation: a synthesis of literature , 2009 .
[15] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[16] Lars Stehn,et al. Industrialised housing –definition and categorization of the concept , 2005 .
[17] J. Schumpeter,et al. The Theory of Economic Development , 2017 .
[18] Lauri Koskela,et al. Moving-on — beyond lean thinking , 2004 .
[19] Glenn Ballard,et al. What Kind of Production Is Construction , 1998 .
[20] Lauri Koskela,et al. Revisiting the Three Peculiarities of Production in Construction , 2005 .
[21] Graham Winch,et al. Models of manufacturing and the construction process: the genesis of re-engineering construction , 2003 .
[22] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[23] Iris D. Tommelein,et al. Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .
[24] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[25] X. Xue,et al. Coordination mechanisms for construction supply chain management in the Internet environment , 2007 .
[26] Ghassan Aouad,et al. Facilitating innovation in construction , 2010 .
[27] R. Müller,et al. On the nature of the project as a temporary organization , 2003 .
[28] Lauri Koskela,et al. The prevalent theory of construction is a hindrance for innovation , 2000 .
[29] Daniel Roos,et al. The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .
[30] Pascal Dennis,et al. Lean Production Simplified : A Plain-Language Guide to the World's Most Powerful Production System , 2002 .
[31] Anders Bystedt,et al. Interaction in the construction process—System effects for a joinery-products supplier , 2011 .
[32] G. Schuh,et al. Lean innovation: introducing value systems to product development , 2008, PICMET '08 - 2008 Portland International Conference on Management of Engineering & Technology.
[33] Lincoln Forbes,et al. Modern Construction : Lean Project Delivery and Integrated Practices , 2010 .
[34] Luciano Brandão de Souza,et al. Trends and approaches in lean healthcare , 2009 .
[35] Umit Isikdag,et al. Emerging technologies for BIM 2.0 , 2011 .
[36] Gul Polat,et al. Construction Supply Chains: Turkish Supply Chain Configurations for Cut and Bent Rebar , 2003 .
[37] Frens Pries,et al. Innovation in the construction industry: the dominant role of the environment , 1995 .
[38] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[39] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .
[40] Ghassan Aouad,et al. DESIGN, PROCESS, AND SERVICE INNOVATIONS TO ACHIEVE SUSTAINABILITY , 2011 .
[41] Chimay J. Anumba,et al. Collaborative project information management in a semantic web environment , 2008 .
[42] Jan Bröchner,et al. Managing information flow in construction supply chains , 2005 .
[43] Xiaodong Li,et al. An agent-based framework for supply chain coordination in construction , 2005 .
[44] Rogier Jongeling. BIM istället för 2D-CAD i byggprojekt : en jämförelse mellan dagens byggprocesser baserade på 2D-CAD och tillämpningar av BIM , 2008 .
[45] Jean Hartley,et al. Case study research , 2004 .
[46] A. Björnfot,et al. Application of line‐of‐balance and 4D CAD for lean planning , 2007 .
[47] Peter E.D. Love,et al. Concurrent engineering : a strategy for procuring construction projects , 1998 .
[48] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .
[49] James M. Utterback,et al. A dynamic model of process and product innovation , 1975 .
[50] Ofer Zwikael,et al. Critical planning processes in construction projects , 2009 .
[51] R. Yin,et al. Case Study Research: Design and Methods (4th ed. , 2009 .